Elevator apt, fireproof with stores
Smith (NYCHA)
20 MADISON STREET · BIN 1077415
💬 Discuss this project
1950Year Built
17Stories
D6Building Class
R7-2Zoning
1,264,820 sfGross Floor Area
1,947Units
LL97 Covered11 Open Violations 6 unresolved · 5 paperwork only ▸FISP: SAFE
Elevator apt, fireproof with stores · Owner of record: NYC HOUSING AUTHORITY · 781,000 sf lot · 1.62 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof5p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 9 docs
Floor 1Under Construction9p · 1 filing · 20 docs
CellarUnder Construction46p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA6509/13/2026
NYC HOUSING AUTHORITY503/22/2026
NYCHA 99303/22/2026
NYCHA 996103/22/2026
NEW YORK CITY HOUSING AUTHORITY703/21/2026
S N BUILDERS1303/21/2026
OFFICE OF DESIGN-NYCHA1203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STV INCORPORATED1008/06/2026
ZI ENGINEERING, P.C302/10/2026
JOEL PHAGOO P.E. PLLC911/12/2025
A&J CONSULTING ENGINEERING SERVICES103/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STV1203/21/2026
AK CONSULTING SERVICES203/21/2026
JOEL PHAGOO P.E. PLLC503/21/2026
PURCELL EVERETT ARCHITECTS203/21/2026
RIGGINING CONSULTANTS103/21/2026
JOEL PHAGOO P E503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RICHARDS PLUM & HTG CO,INGeneral Contractor2104/09/2026
SKYWORX CONTRACTING INCGeneral Contractor1207/08/2026
NEELAM CONSTRUCTION CORPGeneral Contractor507/08/2026
ZORIA HOUSING, LLCGeneral Contractor504/09/2026
MNK ENTERPRISES LLCGeneral Contractor404/09/2026
CHARNJIT SINGHElectrical303/21/2026
RICHARDS P AND H CO, INCPlumbing306/28/2026
STEPHENS, KENNETHElectrical103/21/2026
CARUSO VINCENTElectrical103/21/2026
ELIZABETH A MAHONEYElectrical103/21/2026
GALA RESORATATION INCElectrical103/21/2026
KOLKER, MIKHAILElectrical103/21/2026
RAIDEN ELECTRIC, LLCElectrical103/22/2026
AYALA GUALLI, LUISElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4231108/06/2026
JOEL PHAGOO ,PE, PLLC2416211/06/2025
AK CONSULTING SERVICES, I6198105/21/2024
TECTONIC ENGINEERING CONS106103/04/2022
Building Lifecycle
All (154)Filed (27)Permit Issued (38)Signed Off (10)Facade (FISP) (19)Violation (16)Inspection (6)Objection (8)Special Inspection (30)
09/02/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/13/2026
Special inspection requirement — Electrical motors and elevators
Young Suh
08/13/2026
Special inspection requirement — Heating Systems
Young Suh
08/13/2026
Special inspection requirement — Sprayed fire-resistant materials
Young Suh
08/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
08/13/2026
Special inspection requirement — Mechanical Systems
Young Suh
08/13/2026
Special inspection requirement — Final
Young Suh
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
08/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
08/13/2026
Special inspection requirement — Lighting controls
Young Suh
08/13/2026
Special inspection requirement — Maintenance information
Young Suh
08/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
08/13/2026
Special inspection requirement — Interior lighting power
Young Suh
08/06/2026
Filed — Alteration
BLDG#6_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
M00509611-P9
08/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
08/04/2026
Special inspection requirement — Final
Young Suh
08/04/2026
Special inspection requirement — Maintenance information
Young Suh
08/04/2026
Special inspection requirement — Heating Systems
Young Suh
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/04/2026
Special inspection requirement — Interior lighting power
Young Suh
08/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
08/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
08/04/2026
Special inspection requirement — Electrical motors and elevators
Young Suh
08/04/2026
Special inspection requirement — Lighting controls
Young Suh
08/04/2026
Special inspection requirement — Mechanical Systems
Young Suh
08/04/2026
Special inspection requirement — Sprayed fire-resistant materials
Young Suh
06/17/2026
Filed — Alteration
BLDG#6_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
M00509611-P8
06/12/2026
Filed — Alteration
BLDG#6_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
M00509611-P7
06/11/2026
Filed — Alteration
BLDG#6_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
M00509611-P6
06/09/2026
Special inspection requirement — Heating Systems
Young Suh
06/09/2026
Special inspection requirement — Mechanical Systems
Young Suh
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
06/09/2026
Special inspection requirement — Sprayed fire-resistant materials
Young Suh
04/03/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01178973-I1
04/03/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00405817-I1
03/27/2026
Permit issued — Mechanical Systems
M00509611-I1-ST
03/27/2026
Permit issued — General Construction
M00509611-I1-MS
03/27/2026
Permit issued — General Construction
M00509611-I1-GC
03/10/2026
Signed off — Alteration
FACADE RESTORATION AS PER INDICATED ON PLAN. NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01080084-I1
02/25/2026
Signed off — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD AND MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS AND FACADE INSPECTION. SUSPENDED SCAFFOLD AN MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01173772-I1
02/25/2026
Permit issued — Suspended Scaffold
M01173772-I1-SC
02/11/2026
Permit issued — Sidewalk Shed
M00405817-I1-SH
02/10/2026
Filed — Alteration
FACADE RESTORATION AS PER INDICATED ON PLAN. NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01080084-P2
02/09/2026
Cycle 10 facade report submitted
02/09/2026
Cycle 10 facade report signed — SAFE
02/03/2026
Permit issued — Construction Fence
M01178973-I1-FN
01/15/2026
Cycle 10 facade report submitted
01/14/2026
Cycle 10 facade report signed — UNSAFE
01/13/2026
Cycle 10 facade inspection completed
01/13/2026
Cycle 10 facade inspection completed
01/06/2026
Permit issued — Plumbing
M00509611-S1-PL
11/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00405817-P2
11/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01178973-P1
11/06/2025
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD AND MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS AND FACADE INSPECTION. SUSPENDED SCAFFOLD AN MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01173772-P1
09/30/2025
Filed — Alteration
FACADE RESTORATION AS PER INDICATED ON PLAN. NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01080084-P1
06/20/2025
Permit issued — General Construction
M01080084-I1-GC
03/21/2025
Permit issued — General Construction
M00509611-I1-ST
Latest 60 of 154 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offRICHARDS PLUM & HTG CO,IN03/27/2026
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN03/27/2026
DOB NOWGeneral ConstructionPermit IssuedRICHARDS PLUM & HTG CO,IN03/27/2026
DOB NOWSuspended ScaffoldSigned-offZORIA HOUSING LLC02/25/2026
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC02/11/2026
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC02/03/2026
DOB NOWPlumbingPermit IssuedRICHARDS P AND H CO, INC01/06/2026
DOB NOWGeneral ConstructionSigned-offZORIA HOUSING, LLC06/20/2025
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN03/21/2025
DOB NOWMechanical SystemsPermit IssuedRICHARDS PLUM & HTG CO,IN03/21/2025
DOB NOWMechanical SystemsSigned-offRICHARDS PLUM & HTG CO,IN03/21/2025
DOB NOWSuspended ScaffoldSigned-offZORIA HOUSING LLC02/13/2025
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC02/13/2025
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC02/11/2025
DOB NOWMechanical SystemsSigned-offRICHARDS PLUM & HTG CO,IN12/16/2024
DOB NOWStructuralPermit IssuedRICHARDS PLUM & HTG CO,IN12/16/2024
DOB NOWPlumbingPermit IssuedRICHARDS P AND H CO, INC12/13/2024
DOB NOWSuspended ScaffoldSigned-offZIRCON GROUP INC05/24/2024
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM05/08/2024
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN03/22/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC02/13/2024
DOB NOWPlumbingPermit IssuedRICHARDS P AND H CO, INC12/13/2023
DOB NOWGeneral ConstructionPermit IssuedRICHARDS PLUM & HTG CO,IN12/08/2023
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN12/08/2023
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC02/27/2023
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC04/22/2022
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC01/05/2022
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC01/05/2021
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC10/01/2020
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC12/10/2019
DOB NOWConstruction FenceSigned-offNEELAM CONSTRUCTION CORP08/01/2019
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC03/14/2019
DOB NOWSupported ScaffoldSigned-offSKYWORX CONTRACTING INC08/02/2018
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC08/02/2018
DOB NOWConstruction FenceSigned-offNEELAM CONSTRUCTION CORP08/01/2018
DOB NOWSupported ScaffoldSigned-offSKYWORX CONTRACTING INC06/20/2018
DOB NOWConstruction FenceSigned-offNEELAM CONSTRUCTION CORP05/08/2018
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC05/07/2018
BISOTISSUEDJCC CONSTRUCTION CORP08/18/2025
BISOTISSUEDJCC CONSTRUCTION CORP08/18/2025
+ 23 more permits on file
1 project · most recent 08/06/2026
Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
08/06/2026Permit IssuedRICHARDS PLUM & HTG CO,INAssociated Ducts and Piping
Ducts & Piping
Vent-Rite CRVD3020-IE 6 CFM · Pump ×6
DVD-30-30-35 15 CFM · Pump ×6
CRVD3020-2E 6 CFM · Pump ×2
VRD303030-E3 15 CFM · Pump ×2
Bell & Gossett BFDW422-82 103 tons · Heat Exchanger ×3
Rittling 2S 158 tons ×4
Sondex SL14DTLPN25-100LL 103 tons · Heat Exchanger ×1
1 project · most recent 08/06/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/06/2026Permit IssuedRICHARDS P AND H CO, INCStorm, Water/Sanitary
11 projects · most recent 10/14/2025
General Wiring
FiledStatusContractorScope
10/14/2025CompleteLIT MODE ELECL CONTG INC—
10/14/2025CompleteLIT MODE ELECL CONTG INC—
10/14/2025CompleteLIT MODE ELECL CONTG INC—
07/17/2025Permit IssuedN.Y.C. HOUSING AUTHORITYGeneral Wiring
07/11/2025CompleteMECO ELECTRIC CO. INC.General Wiring
08/27/2020CompleteQ.Y. ELECTRIC, INC—
12/05/2019Permit IssuedRAIDEN ELECTRIC LLC—
08/19/2019CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
08/23/2018Permit IssuedEIA ELECTRIC, INCGeneral Wiring
05/02/2018CompleteLINTECH ELECTRIC, INC.—
05/01/2018CompleteLINTECH ELECTRIC, INC.—
1 project · most recent 08/06/2026
Concrete
FiledStatusContractorScope
08/06/2026Permit IssuedRICHARDS PLUM & HTG CO,INConcrete
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/02/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/28/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
08/13/2026Heating SystemsYoung Suhspecial
08/13/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
08/13/2026Lighting controlsYoung Suhenergy_progress
08/13/2026HVAC-R and service water heating equipmentYoung Suhenergy_progress
08/13/2026Electrical motors and elevatorsYoung Suhenergy_progress
08/13/2026Interior lighting powerYoung Suhenergy_progress
08/13/2026HVAC-R and service water heating system controlsYoung Suhenergy_progress
08/13/2026Maintenance informationYoung Suhenergy_progress
08/13/2026FinalYoung Suhprogress
08/13/2026Energy Code Compliance InspectionsYoung Suhprogress
08/13/2026Mechanical SystemsYoung Suhspecial
08/13/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
08/13/2026Sprayed fire-resistant materialsYoung Suhspecial
08/04/2026Mechanical SystemsYoung Suhspecial
08/04/2026Interior lighting powerYoung Suhenergy_progress
08/04/2026Electrical motors and elevatorsYoung Suhenergy_progress
08/04/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
08/04/2026HVAC-R and service water heating system controlsYoung Suhenergy_progress
08/04/2026Lighting controlsYoung Suhenergy_progress
08/04/2026Maintenance informationYoung Suhenergy_progress
08/04/2026HVAC-R and service water heating equipmentYoung Suhenergy_progress
08/04/2026FinalYoung Suhprogress
08/04/2026Energy Code Compliance InspectionsYoung Suhprogress
08/04/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
08/04/2026Heating SystemsYoung Suhspecial
Latest 25 of 66.
▾Documents — 389 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch22
09/06/2026M00041165-I1Request digital key ↗
09/06/2026M00041116-I1Request digital key ↗
09/06/2026M00054618-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/05/2026M00277272-I1Request digital key ↗
08/20/2026M00405817-I1Request digital key ↗
08/20/2026M00405817-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe2
09/02/2026M00341347-P1Request digital key ↗
09/02/2026M00341347-I1Request digital key ↗
▸Applications & Permits66
▸BISPLAN / WORK APPROVAL APPLICATION49
10/02/2025123510343Open ↗
10/01/2025123510343Open ↗
12/11/2024123510343Open ↗
Showing 3 of 49 on file for this type
▸BISWORK PERMIT APPLICATION14
01/19/2024123510343Open ↗
01/19/2024123510343Open ↗
01/19/2024123510343Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
02/22/2024123510343Open ↗
06/10/2021140557154Open ↗
08/18/2020140557154Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE DESIGN CERTIFICATION3
04/19/2015140336223Open ↗
04/17/2015140336027Open ↗
04/16/2015140335536Open ↗
▸Seals & Professional Certifications96
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/06/2026M00041116-I1Open ↗
09/06/2026M00054618-I1Open ↗
09/05/2026M00277272-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
04/24/2020123510343Open ↗
01/04/2019123510343Open ↗
01/04/2019123510343Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/03/2026M01080084-P2Open ↗
09/02/2026M00509611-P7Open ↗
09/02/2026M00509611-P7Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/03/2026M01080084-P2Open ↗
09/02/2026M00509611-P7Open ↗
09/02/2026M00509611-P7Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
01/04/2019123510343Open ↗
01/04/2019123510343Open ↗
01/04/2019123510343Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
06/01/2015140355201Open ↗
04/19/2015140336223Open ↗
04/17/2015140336027Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
06/01/2015140355201Open ↗
04/19/2015140336223Open ↗
04/17/2015140336027Open ↗
Showing 3 of 6 on file for this type
▸BISProfessional and Owner Certification (POC3)2
06/21/2016122803608Open ↗
06/21/2016122803608Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/04/2019123510343Open ↗
06/21/2016122803608Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/04/2016140557154Open ↗
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
01/04/2019123510343Open ↗
01/04/2019123510343Open ↗
06/21/2016122803608Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING3
12/03/2024123510343Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWFDNY: Letter of No Objection2
09/02/2026M00341347-I1Open ↗
09/02/2026M00341347-P1Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan6
09/05/2026M00277272-I1Open ↗
09/02/2026M00341347-P1Open ↗
09/02/2026M00341347-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTenant Protection Plan and Notes1
10/07/2016122128081Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/19/2024123510343Open ↗
06/01/2015140355201Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/21/2026M01080084-I1Open ↗
08/13/2026M00509611-S1Open ↗
08/13/2026M00509611-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/06/2026M00054618-I1Open ↗
09/02/2026M00341347-P1Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU6804MN181
02/22/2021140557154Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
06/30/2015140336223Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/20/2016140336223Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
04/24/2020123510343Open ↗
01/04/2019123510343Open ↗
10/20/2016140336223Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
06/10/2021140557154Open ↗
07/16/2018140557154Open ↗
04/24/2018140557154Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
06/10/2021140557154Open ↗
10/20/2016140336223Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/16/2015140335536Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/10/2021140557154Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC ANALYSIS1
04/19/2015140336223Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/19/2015140336223Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY11
02/16/2024123510343Open ↗
06/10/2021140557154Open ↗
07/16/2018140557154Open ↗
Showing 3 of 11 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)4
06/01/2015140355201Open ↗
04/19/2015140336223Open ↗
04/17/2015140336027Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs57
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter28
09/06/2026M00041116-I1Open ↗
09/06/2026M00054618-I1Open ↗
09/05/2026M00277272-I1Open ↗
Showing 3 of 28 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
01/19/2024123510343Open ↗
06/10/2021140557154Open ↗
07/18/2018140557154Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
06/10/2021140557154Open ↗
10/20/2016140336223Open ↗
09/06/2016140336027Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)6
09/05/2026M00277272-I1Open ↗
08/26/2026M00509611-P9Open ↗
08/26/2026M00509611-P7Open ↗
Showing 3 of 6 on file for this type
▸BISSHED LETTER2
06/30/2015140211955Open ↗
06/30/2015140211955Open ↗
▸BISSUPERSEDING LETTER2
11/05/2015140336223Open ↗
11/05/2015140336223Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/21/2026M01080084-I1Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
06/10/2021140557154Open ↗
04/24/2020123510343Open ↗
01/04/2019123510343Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms46
▸BISADDITIONAL INFORMATION16
10/02/2025123510343Open ↗
12/11/2024123510343Open ↗
02/22/2021140557154Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET11
01/04/2019123510343Open ↗
01/04/2019123510343Open ↗
01/04/2019123510343Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
10/04/2016140557154Open ↗
06/01/2015140355201Open ↗
04/19/2015140336223Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWAI1 Form6
08/26/2026M00509611-I1Open ↗
08/26/2026M00509611-S1Open ↗
08/26/2026M00509611-P6Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
01/24/2020123510343Open ↗
01/17/2020123510343Open ↗
07/05/2019123510343Open ↗
Showing 3 of 4 on file for this type
▸Other Documents16
▸BISFEE EXEMPTION DOCUMENTATION5
06/01/2015140355201Open ↗
04/19/2015140336223Open ↗
04/17/2015140336027Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
12/13/2018123510343Open ↗
06/13/2016122803608Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWManufacturer's Specifications3
08/13/2026M01054499-I1Open ↗
08/13/2026M01173772-I1Open ↗
08/13/2026M01173772-P1Open ↗
▸DOB NOWCalculations3
08/13/2026M01173772-I1Open ↗
08/13/2026M01054499-I1Open ↗
08/13/2026M01173772-P1Open ↗
▸BISSupporting Document: Fee Exempt1
01/19/2024123510343Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01038021-I1Open ↗