NYCHA BOILER_BLDG#9_Remove steam hot water storage tank and replace with new steam instantaneous water heater. Provide condensate piping from mechanical provided condensate pump to exist. bldg. drainage lines. Remove and replace exist. sump pumps.
NYCHA BOILER_BLDG#9_Remove steam hot water storage tank and replace with new steam instantaneous water heater. Provide condensate piping from mechanical provided condensate pump to exist. bldg. drainage lines. Remove and replace exist. sump pumps.
On file for this job
49 documents
Nothing on file for this building.
Building Lifecycle
All (28)Violation (16)Inspection (12)
11/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish