RoofUnder Construction17p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction
FILING HEREWITH FOR FACADE REPAIR, RAILING REPLACEMENT AT ROOF AND GARAGE REPAIRS. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
4 documents · 3 drawing sheets
HEREWITH FILING FOR PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
On file for this job
18 documents · 1 drawing sheet
BulkheadUnder Construction2p · 2 filings · 9 docs
Equipment
Installation of suspended scaffold for facade work or inspection.
On file for this job
7 documents · 1 drawing sheet
IRA to assist with Condition Assessment
On file for this job
2 documents · 1 drawing sheet
Floor 286p · 4 filings · 17 docs
ArchitectureFire ProtectionMechanicalPlumbing
interior demolition and construction for combination of unit 28 C/D on 26th construction floor.. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
On file for this job
5 documents · 2 drawing sheets
mechanical work to remove kitchen exhaust duct and cap main duct riser for combination of unit 28 C/D on 26th construction floor.
On file for this job
2 documents · 1 drawing sheet
plumbing work for combination of unit 28 C/D on 26th construction floor..
On file for this job
4 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 2719p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
sprinkler work for combination of apartments 27 B/C
On file for this job
5 documents · 4 drawing sheets
interior demolition and construction for combination of unit 27 B/C on 27th floor.. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
On file for this job
10 documents · 3 drawing sheets
mechanical work to cut back and cap kitchen exhaust duct for combination of apartment 27 B/C
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 267p · 3 filings · 15 docs
ArchitectureFire ProtectionPlumbing
sprinkler
On file for this job
3 documents · 2 drawing sheets
plumbing work for combination of apartment 26 C/D
On file for this job
4 documents · 2 drawing sheets
interior demolition and construction for combination of Unit 26 C/D. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
On file for this job
8 documents · 3 drawing sheets
Floor 259p · 4 filings · 20 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
Sprinklers
Sprinkler plans for the removal, relocation and installation for Renovation of once existing dwelling unit (APT# 25EF) on the 25th floor. No change to use, occupancy or egress.
On file for this job
14 documents · 1 drawing sheet
sprinkler work for combination of apartments E&F
On file for this job
5 documents · 2 drawing sheets
plumbing work during renovation to combine apartments E & F
On file for this job
2 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 246p · 4 filings · 14 docs
ArchitectureFire ProtectionMechanicalPlumbing
Plumbing work for combination of unit 24 AB on 22nd floor construction (24th floor marketing). Scope of work includes combining two adjacent kitchens to become one larger kitchen. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/199
On file for this job
3 documents · 1 drawing sheet
Sprinkler work for combination of unit 24 AB on 22nd floor construction (24th floor marketing).
On file for this job
3 documents · 1 drawing sheet
Interior demolition and construction for combination of unit 24 AB on 22nd floor construction (24th floor marketing). Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
On file for this job
6 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 23
Floor 227p · 4 filings · 16 docs
ArchitectureMechanicalPlumbing
interior demolition and construction for combination of Unit 22 E/F. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
On file for this job
4 documents · 3 drawing sheets
Cut back section of duct & replace all existing diffusers for combination of apartment 22 E/F
On file for this job
4 documents · 1 drawing sheet
plumbing work for combination of apartment 22 E/F
On file for this job
4 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 21
Floor 20
Floor 191p · 1 filing · 6 docs
Plumbing
plumbing work during renovation of landscape terrace
On file for this job
6 documents · 1 drawing sheet
Floor 18
Floor 17
Floor 164p · 4 filings · 17 docs
ArchitectureFire ProtectionPlumbing
interior demolition and construction for combination of apt 16 D/E
On file for this job
7 documents · 1 drawing sheet
sprinkler work for combination of apartment 16 D/E
On file for this job
2 documents · 1 drawing sheet
plumbing work for combination of apartment 16 D/E
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 1516p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
sprinkler work for combination of apartments 15 K/L
On file for this job
5 documents · 3 drawing sheets
MODIFICATION OF EXIST SPRINKLER HEAD LAYOUT THROUGHOUT THE SPACE TO ACCOMODATE NEW COMBINED APARTMENT 15DE LAYOUT. NO SCOPE IN STANDPIPE. THIS APPLICATION IS FILED IN CONJUNCTION WITH JOB # M08001413.
On file for this job
3 documents · 1 drawing sheet
interior demolition and construction for combination of unit 15 K/L on 15th floor.. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
On file for this job
12 documents · 5 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1413p · 10 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
interior demolition and construction for combination of unit 14AB & Q on 12th floor construction (14th floor marketing). Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
On file for this job
5 documents · 2 drawing sheets
Mechanical work for removal of existing kitchen exhaust ductwork for combination of unit 14AB & Q on 12th floor construction (14th floor marketing).
On file for this job
4 documents · 1 drawing sheet
plumbing work for combination of unit 14AB & Q on 12th floor construction (14th floor marketing)
On file for this job
2 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 13
Floor 12
Floor 11
Floor 1013p · 5 filings · 14 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
Minor Renovation to an existing Class A apartment. Architectural work proposed as per plans filed herewith. No exterior or structural work proposed. There will be no change of use, occupancy, or egress under this application.
Cut back and cap one kitchen exhaust duct. Re-route one kitchen exhaust duct. Replace all diffusers in kind for combination of apartment 10 N/P
On file for this job
2 documents · 1 drawing sheet
Interior demolition and construction for combination of apt 10 N/P. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997.
On file for this job
6 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 96p · 4 filings · 17 docs
ArchitectureFire ProtectionMechanicalPlumbing
sprinkler work for combination of apartment 9 D/E
On file for this job
2 documents · 1 drawing sheet
plumbing work for combination of apartment 9 D/E
On file for this job
6 documents · 2 drawing sheets
modification of ductwork and replacing existing grills for combination of apartment 9 D/E
On file for this job
4 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 85p · 4 filings · 14 docs
ArchitectureFire ProtectionMechanicalPlumbing
sprinkler work for unit 8 D/E on 7th floor construction (8th floor marketing)
On file for this job
3 documents · 1 drawing sheet
Interior demolition and construction for combination of unit 8 D/E on 7th floor construction (8th floor marketing). Combine dwelling units per DOB Technic
On file for this job
5 documents · 1 drawing sheet
mechanical work for unit 8 D/E on 7th floor construction (8th floor marketing)
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 7
Floor 6
Floor 5
Floor 4
Floor 36p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
plumbing work for combination of unit 3 G/H on 2nd floor construction (3rd floor marketing).
On file for this job
4 documents · 1 drawing sheet
Interior demolition and construction for combination of unit 3 G/H on 2nd floor construction (3rd floor marketing). Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
On file for this job
5 documents · 2 drawing sheets
mechanical work to remove kitchen exhaust duct and cap main duct riser for combination of unit 3 G/H on 2nd floor construction (3rd floor marketing).
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 2
Floor 1
CellarUnder Construction15p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction
FILING HEREWITH FOR FACADE REPAIR, RAILING REPLACEMENT AT ROOF AND GARAGE REPAIRS. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
4 documents
HEREWITH FILING FOR PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
On file for this job
18 documents · 2 drawing sheets