← Back
BROOKLYN
20 SOUTH STREET
BROOKLYN · BIN 3429124
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
Bulkhead1p · 1 filing · 2 docs
Floor 3Under Construction4p · 1 filing · 20 docs
Floor 2Under Construction6p · 1 filing · 20 docs
Floor 1Under Construction26p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
APEX BUILDING GROUP2909/13/2026
APEX BUILDING1707/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES1103/21/2026
JM ZONING, LLC.203/21/2026
A1 EXPEDITING SERVICE403/21/2026
DOMANI CONSULTING203/21/2026
DVA Advisors203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
APEX BUILDING COMPANY INCGeneral Contractor1307/29/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor307/08/2026
RO-SAL PLBG HTG INCFire Protection208/11/2026
RO-SAL PLUMBING & HTG INC INC.Plumbing208/11/2026
ECD NY INCGeneral Contractor106/27/2026
4 BROTHERS & SONS FENCEGeneral Contractor107/08/2026
A & R ELEC'L MAINT. INC.Electrical103/22/2026
WJ PROFESSIONAL EXPEDITINGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERICAN CONSTRUCTION TES9731610/20/2025
GEODESIGN, INC., P.C.627104/04/2025
Building Lifecycle
All (64)Filed (14)Permit Issued (12)Signed Off (2)Inspection (1)Objection (5)Special Inspection (30)
08/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN HOPKINS
08/20/2026
Special inspection requirement — Maintenance information
EDWIN HOPKINS
08/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN HOPKINS
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
08/20/2026
Special inspection requirement — Standpipe Systems
EDWIN HOPKINS
08/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN HOPKINS
08/20/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
EDWIN HOPKINS
08/20/2026
Special inspection requirement — Post-installed Anchors
EDWIN HOPKINS
08/20/2026
Special inspection requirement — Sprinkler Systems
EDWIN HOPKINS
07/09/2026
Permit issued — Foundation
B01176982-S1-FO
06/19/2026
Filed — Alteration
Installation of new water main.
B01389864-I1
06/11/2026
Permit issued — General Construction
B01176982-I1-GC
06/03/2026
Filed — Alteration
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01409189-I1
06/02/2026
Special inspection requirement — Maintenance information
EDWIN HOPKINS
06/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN HOPKINS
04/03/2026
Objection resolved — Resolved
03/22/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
02/24/2026
Objection raised — Other
01/21/2026
Filed — New Building
Installation of water services in conjunction with NB
B01176982-S9
10/20/2025
Filed — New Building
Installation of water services in conjunction with NB
B01176982-S8
10/20/2025
Special inspection requirement — Insulation placement and R values
EDWIN HOPKINS
10/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
EDWIN HOPKINS
10/20/2025
Special inspection requirement — Air barrier - visual inspection
EDWIN HOPKINS
10/20/2025
Special inspection requirement — Shutoff dampers
EDWIN HOPKINS
10/20/2025
Special inspection requirement — Fenestration areas
EDWIN HOPKINS
10/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN HOPKINS
10/20/2025
Special inspection requirement — Fenestration air leakage
EDWIN HOPKINS
10/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN HOPKINS
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
10/16/2025
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
10/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
EDWIN HOPKINS
10/10/2025
Special inspection requirement — Mechanical Systems
EDWIN HOPKINS
10/10/2025
Special inspection requirement — Final
EDWIN HOPKINS
10/07/2025
Objection resolved — Addressed
06/06/2025
Permit issued — Construction Fence
B00752040-I1-FN
04/30/2025
Objection raised — Other
04/22/2025
Objection raised — Other
04/09/2025
Filed — New Building
Installation of water services in conjunction with NB
B01176982-S5
04/09/2025
Filed — New Building
Installation of water services in conjunction with NB
B01176982-S6
04/09/2025
Filed — New Building
Installation of water services in conjunction with NB
B01176982-S4
04/04/2025
Filed — New Building
Installation of water services in conjunction with NB
B01176982-S2
04/04/2025
Filed — New Building
Installation of water services in conjunction with NB
B01176982-S3
04/03/2025
Filed — New Building
Installation of water services in conjunction with NB
B01176982-I1
03/26/2025
Special inspection requirement — Final
EDWIN HOPKINS
03/26/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
THOMAS THOMANN
03/26/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
THOMAS THOMANN
03/26/2025
Special inspection requirement — Maintenance information
EDWIN HOPKINS
03/26/2025
Special inspection requirement — Shutoff dampers
EDWIN HOPKINS
03/26/2025
Special inspection requirement — Lighting controls
EDWIN HOPKINS
01/15/2025
Permit issued — Construction Fence
B00752040-I1-FN
12/17/2024
Permit issued — Construction Fence
B00752040-I1-FN
10/03/2024
Permit issued — Construction Fence
B00752040-I1-FN
06/10/2024
Signed off — Alteration
B00886652-I1
06/10/2024
Signed off — Alteration
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
B00886659-I1
04/29/2024
Permit issued — Supported Scaffold
B00846621-I1-SF
06/30/2023
Permit issued — Construction Fence
B00752040-I1-FN
06/10/2023
Permit issued — Protection and Mechanical Methods
B00886659-I1-PMM
06/09/2023
Filed — Alteration
B00886652-I1
06/09/2023
Filed — Alteration
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
B00886659-I1
06/09/2023
Permit issued — Protection and Mechanical Methods
B00886652-I1-PMM
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedAPEX BUILDING COMPANY INC07/09/2026
DOB NOWGeneral ConstructionPermit IssuedAPEX BUILDING COMPANY INC06/11/2026
DOB NOWConstruction FencePermit IssuedAPEX BUILDING COMPANY INC06/06/2025
DOB NOWConstruction FencePermit IssuedAPEX BUILDING COMPANY INC01/15/2025
DOB NOWConstruction FencePermit IssuedWJ PROFESSIONAL EXPEDITIN12/17/2024
DOB NOWConstruction FencePermit IssuedAPEX BUILDING COMPANY INC10/03/2024
DOB NOWSupported ScaffoldPermit IssuedAPEX BUILDING COMPANY INC04/29/2024
DOB NOWConstruction FencePermit IssuedAPEX BUILDING COMPANY INC06/30/2023
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP06/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP06/09/2023
DOB NOWSupported ScaffoldPermit IssuedAPEX BUILDING COMPANY INC03/30/2023
DOB NOWConstruction FencePermit IssuedAPEX BUILDING COMPANY INC07/06/2022
1 project · most recent 06/19/2026
Water/Sanitary
FiledStatusContractorScope
06/19/2026——Water/Sanitary
3 projects · most recent 07/10/2023
General Wiring
FiledStatusContractorScope
07/10/2023CancelledA & R ELEC'L MAINT. INC.129 meters, 129 new_meters
04/17/2023CancelledA & R ELEC'L MAINT. INC.General Wiring
04/13/2023CompleteA & R ELEC'L MAINT. INC.—
3 projects · most recent 06/03/2026
Fence Scaffold
FiledStatusContractorScope
06/03/2026Permit Issued4 BROTHERS & SONS FENCEFence
03/23/2023Permit IssuedAPEX BUILDING COMPANY INCScaffold
07/01/2022Permit IssuedAPEX BUILDING COMPANY INCFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/22/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
08/20/2026HVAC-R and service water heating equipmentEDWIN HOPKINSenergy_progress
08/20/2026Maintenance informationEDWIN HOPKINSenergy_progress
08/20/2026HVAC-R and service water piping design and insulationEDWIN HOPKINSenergy_progress
08/20/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
08/20/2026Standpipe SystemsEDWIN HOPKINSspecial
08/20/2026HVAC-R and service water heating system controlsEDWIN HOPKINSenergy_progress
08/20/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationEDWIN HOPKINSspecial
08/20/2026Post-installed AnchorsEDWIN HOPKINSspecial
08/20/2026Sprinkler SystemsEDWIN HOPKINSspecial
06/02/2026Maintenance informationEDWIN HOPKINSenergy_progress
06/02/2026HVAC-R and service water piping design and insulationEDWIN HOPKINSenergy_progress
10/20/2025Insulation placement and R valuesEDWIN HOPKINSenergy_progress
10/20/2025Fenestration and door U-factor and product ratingsEDWIN HOPKINSenergy_progress
10/20/2025Air barrier - visual inspectionEDWIN HOPKINSenergy_progress
10/20/2025Shutoff dampersEDWIN HOPKINSenergy_progress
10/20/2025Fenestration areasEDWIN HOPKINSenergy_progress
10/20/2025HVAC-R and service water heating system controlsEDWIN HOPKINSenergy_progress
10/20/2025Fenestration air leakageEDWIN HOPKINSenergy_progress
10/20/2025HVAC-R and service water heating equipmentEDWIN HOPKINSenergy_progress
10/16/2025Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
10/16/2025Energy Code Compliance InspectionsEDWIN HOPKINSprogress
10/16/2025Fire-Resistance Rated ConstructionEDWIN HOPKINSprogress
10/10/2025Mechanical SystemsEDWIN HOPKINSspecial
10/10/2025FinalEDWIN HOPKINSprogress
03/26/2025FinalEDWIN HOPKINSprogress
Latest 25 of 59.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026B00752040-I1Request digital key ↗
08/27/2026B00846621-I1Request digital key ↗
08/27/2026B00886659-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸DOB NOWDEP Stormwater Construction Permit3
08/13/2026B01176982-I1Open ↗
08/13/2026B01176982-S3Open ↗
08/13/2026B01176982-S1Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWRestrictive Declaration/Easement 112
08/21/2026B01176982-P2Open ↗
08/21/2026B01176982-P1Open ↗
08/13/2026B01176982-S6Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01176982-I1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026B01176982-S2Open ↗
09/01/2026B01176982-Z1Open ↗
09/01/2026B01176982-Z1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B01176982-S2Open ↗
09/01/2026B01176982-Z1Open ↗
09/01/2026B01176982-S4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026B00886659-I1Open ↗
08/27/2026B00886652-I1Open ↗
08/21/2026B01176982-P2Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B01176982-I1Open ↗
08/13/2026B01176982-S8Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B01176982-I1Open ↗
08/13/2026B01176982-S8Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B01176982-S3Open ↗
08/13/2026B01176982-S1Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B01176982-S3Open ↗
08/13/2026B01176982-S1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial2
08/13/2026B01176982-I1Open ↗
08/13/2026B01176982-S8Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01176982-S8Open ↗
08/13/2026B01176982-I1Open ↗