← Back
Elevator cooperative
20 Sutton Place South
20 SUTTON PLACE SOUTH · BIN 1040463
💬 Discuss this project
1953Year Built
20Stories
D4Building Class
R10Zoning
155,938 sfGross Floor Area
88Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: 20 SUTTON PL SOUTH INC · 11,950 sf lot · 13.05 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 6 docs
Floor 19Under Construction9p · 2 filings · 18 docs
Floor 18
Floor 17
Floor 16
Floor 156p · 2 filings · 8 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 64p · 2 filings · 14 docs
Floor 5
Floor 4
Floor 3
Floor 22p · 2 filings · 11 docs
Floor 16p · 1 filing · 2 docs
4 jobs · most recent 05/27/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/27/2026Permit IssuedPROCORE MECHANICAL CORPGas, Water/Sanitary
12/06/2023Permit IssuedJUNIOR CARTER MECH. CORPWater/Sanitary
08/03/2021Signed-offRVM PLUMBING CORPWater/Sanitary
03/12/2020Signed-offRVM PLUMBING CORPGas, Water/Sanitary
25 jobs · most recent 09/16/2026
General Wiring
FiledStatusContractorScope
09/16/2026Permit IssuedCENTURY ELECTRIC LLCGeneral Wiring
06/25/2026Permit IssuedFIU CORP DBA FIU ELECTRICGeneral Wiring
04/08/2026CompleteMODERN VOLTAGE NYC INC—
06/16/2025Permit IssuedMEGA ELEC'L CONTR'G, INC—
04/30/2025CompleteFIU CORP DBA FIU ELECTRICGeneral Wiring
01/02/2025Permit IssuedDVM ELECTRICAL SERVICES LGeneral Wiring
12/06/2024CompleteAMSTERDAM ELECTRIC CORPGeneral Wiring
09/16/2024Permit IssuedBIG CITY ELECL SOLUTIONSGeneral Wiring
09/16/2024CompletePK ELECTRIC INC—
07/24/2024CompleteFIU CORP DBA FIU ELECTRICGeneral Wiring
04/02/2024CompleteVALLEY ELECTRIC OF NY INCGeneral Wiring
02/24/2024Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
10/05/2023CompleteATMOS ELECTRIC SVCE CORPGeneral Wiring
09/01/2023CancelledAMP POWER ELECTRIC SERVGeneral Wiring
07/12/2023CompleteASTRO ELECL CONTNG INCGeneral Wiring
1 job · most recent 12/19/2024
FiledStatusContractorScope
12/19/2024Signed-offMANHATTAN CABINETS, INC1 scope_items
1 job · most recent 03/24/2025
Sidewalk Shed
FiledStatusContractorScope
03/24/2025Signed-offEMPIRE NY INSTALLATIONS ISidewalk Shed
1 job · most recent 04/23/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/23/2026Permit IssuedTOWER SERVICES INCSuspended Scaffold (SC)
Building Lifecycle
All (300)Filed (45)Permit Issued (49)Signed Off (27)Facade (FISP) (10)Violation (26)Inspection (41)Objection (72)Special Inspection (30)
09/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/22/2026
Signed off — Alteration
M01140435-I1
07/17/2026
Signed off — Alteration
M01142361-I1
07/17/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01142350-I1
07/06/2026
Permit issued — General Construction
M01397064-I1-GC
07/06/2026
Permit issued — Plumbing
M01397064-S1-PL
06/22/2026
Objection resolved — Addressed
05/28/2026
Objection raised — Scope
05/27/2026
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION &RELATED PLUMBING WORK OF APT 20B ON 19THFLOOR. NO CHANGE IN USE, EGRESS OROCCUPANCY UNDER THIS APPLICATION.
M01397064-I1
05/27/2026
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION &RELATED PLUMBING WORK OF APT 20B ON 19THFLOOR. NO CHANGE IN USE, EGRESS OROCCUPANCY UNDER THIS APPLICATION.
M01397064-S1
05/06/2026
Permit issued — General Construction
M01140435-I1-GC
05/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
05/05/2026
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
05/04/2026
Signed off — Alteration
The installation of a new opening for PTAC Unit. No change of use, egress, or occupancy under this application.
M01155269-I1
04/23/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01148363-P2
04/20/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
04/20/2026
Special inspection requirement — Post-installed Anchors
Leo Lee
04/02/2026
Permit issued — General Construction
M01335848-I1-GC
03/12/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01148363-P1
03/10/2026
Permit issued — General Construction
M01140435-I1-GC
01/14/2026
Permit issued — Supported Scaffold
M01142361-I1-SF
01/14/2026
Permit issued — Protection and Mechanical Methods
M01165744-I1-PMM
01/14/2026
Permit issued — Sidewalk Shed
M01142350-I1-SH
01/09/2026
Filed — Alteration
M01335848-I1
11/05/2025
Signed off — Alteration
INTERIOR RENOVATION OF APARTMENT 8C ON THE 8TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01216907-S1
11/05/2025
Signed off — Alteration
INTERIOR RENOVATION OF APARTMENT 8C ON THE 8TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01216907-I1
10/30/2025
Signed off — Alteration
M01155199-I1
10/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/05/2025
Permit issued — Suspended Scaffold
M01148363-I1-SC
08/01/2025
Permit issued — Suspended Scaffold
M01148363-I1-SC
07/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/20/2025
Permit issued — General Construction
M01216907-I1-GC
05/19/2025
Permit issued — Plumbing
M01216907-S1-PL
05/05/2025
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 8C ON THE 8TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01216907-S1
05/05/2025
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 8C ON THE 8TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01216907-I1
04/28/2025
Special inspection requirement — Lighting in dwelling units
Ann Macklin
04/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
04/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
04/28/2025
Special inspection requirement — Final
Ann Macklin
04/03/2025
Permit issued — General Construction
M01140435-I1-GC
03/24/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01142350-P1
03/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/05/2025
Permit issued — Structural
M01155269-I1-ST
02/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/29/2025
Permit issued — General Construction
M01155199-I1-GC
01/16/2025
Filed — Alteration
M01142361-I1
01/16/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01142350-I1
01/16/2025
Filed — Alteration
M01165744-I1
01/16/2025
Permit issued — Supported Scaffold
M01142361-I1-SF
01/16/2025
Permit issued — Sidewalk Shed
M01142350-I1-SH
01/16/2025
Permit issued — Protection and Mechanical Methods
M01165744-I1-PMM
01/15/2025
Permit issued — Suspended Scaffold
M01148363-I1-SC
01/14/2025
Objection resolved — Addressed
01/13/2025
Objection raised — Structural
01/13/2025
Objection resolved — Addressed
01/09/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01148363-I1
01/08/2025
Objection resolved — Addressed
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROWN HARRIS STEVENS RESIDENTIAL MA2307/08/2026
20 SUTTON PLACE SOUTH10807/08/2026
BROWN HARRIS STEVENS204/09/2026
B&H RESTORATION, INC.503/22/2026
20 SUTTON PL SOUTH3803/22/2026
CEPRINE CONSTRUCTION103/22/2026
J C LAMB MANAGEMENT1703/21/2026
KNAPP103/21/2026
20 SUTTON PLACE SO303/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES603/21/2026
AE DESIGN SOLUTION1203/21/2026
J A EXPEDITING403/21/2026
NOEL BUILDING CONSULTING INC403/21/2026
IOAD403/21/2026
AGOUTI CONSTRUCTION CONSULTING203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
KNOVA EXPEDITING SERVICES INC403/21/2026
CARLOS ALVAREZ203/21/2026
BERZAK ASSOCIATES ARCHITECTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GEORGE BIEBEL CO. INCGeneral Contractor1407/08/2026
EMPIRE NY INSTALLATIONS INCGeneral Contractor807/08/2026
RVM PLUMBING CORPPlumbing707/08/2026
MANHATTAN CABINETS, INCGeneral Contractor507/08/2026
TOWER SERVICES INCGeneral Contractor307/08/2026
360 PRESTIGE CONTRACTINGGeneral Contractor303/21/2026
CEPRINE CONSTRUCTION INCGeneral Contractor303/21/2026
ASA CORNER STONE BUILDERSGeneral Contractor303/21/2026
PROCORE MECHANICAL CORPPlumbing207/08/2026
P.S.I. MECHANICALPlumbing207/08/2026
JUNIOR CARTER MECH. CORPPlumbing207/08/2026
ARI GROUP, INCGeneral Contractor203/21/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
CRESCO ELECTRICAL CORPElectrical103/22/2026
KONTOROUHAS, VASILIOSElectrical103/21/2026
RICHARD DANTSITSElectrical103/21/2026
ZITO, ROCCOElectrical103/21/2026
A101 CONSTRUCTION+DESIGNGeneral Contractor104/09/2026
B & H RESTORATION INCGeneral Contractor107/08/2026
KNOVA CONTRACTORS INCGeneral Contractor107/08/2026
PRESHER WINDOWS LLCGeneral Contractor107/08/2026
DEMAR MECHANICAL INCPlumbing107/08/2026
PRACTICAL PLBG & HTG INCPlumbing107/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUAN DESIGN INC7669205/27/2026
LEO Y LEE ASSOCIATES2481304/23/2026
ALAN MARGOLIN & ASSOC423101/09/2026
A2 ARCHITECT, PC2504205/05/2025
MIDTOWN PRESERVATION ARCH2634112/27/2024
BHK ENGINEERING, D.P.C.9589112/19/2024
RYAN SPECIAL ENGINEERING2018112/19/2024
CBA5091201/09/2024
RUDOLPH DUPUY R.A. ARCHIT3936212/06/2023
ASSURE PROFESSIONAL ENGIN6962112/06/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMANHATTAN CABINETS, INC07/06/2026
DOB NOWPlumbingPermit IssuedPROCORE MECHANICAL CORP07/06/2026
DOB NOWGeneral ConstructionSigned-offTOWER SERVICES INC05/06/2026
DOB NOWGeneral ConstructionPermit IssuedA101 CONSTRUCTION+DESIGN04/02/2026
DOB NOWGeneral ConstructionSigned-offTOWER SERVICES INC03/10/2026
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I01/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedEMPIRE NY INSTALLATIONS I01/14/2026
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I01/14/2026
DOB NOWSuspended ScaffoldPermit IssuedDEMARI SERVICES INC08/05/2025
DOB NOWSuspended ScaffoldPermit IssuedTOWER SERVICES INC08/01/2025
DOB NOWGeneral ConstructionSigned-offMANHATTAN CABINETS, INC05/20/2025
DOB NOWPlumbingSigned-offPROCORE MECHANICAL CORP05/19/2025
DOB NOWGeneral ConstructionSigned-offTOWER SERVICES INC04/03/2025
DOB NOWStructuralSigned-offMANHATTAN CABINETS, INC03/05/2025
DOB NOWGeneral ConstructionSigned-offMANHATTAN CABINETS, INC01/29/2025
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I01/16/2025
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I01/16/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedEMPIRE NY INSTALLATIONS I01/16/2025
DOB NOWSuspended ScaffoldPermit IssuedDEMARI SERVICES INC01/15/2025
DOB NOWPlumbingPermit IssuedJUNIOR CARTER MECH. CORP03/19/2024
DOB NOWGeneral ConstructionSigned-offKNOVA CONTRACTORS INC02/28/2024
DOB NOWPlumbingPermit IssuedJUNIOR CARTER MECH. CORP02/28/2024
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC02/15/2024
DOB NOWGeneral ConstructionSigned-offARI GROUP02/13/2024
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL12/14/2023
DOB NOWGeneral ConstructionSigned-offMANHATTAN CABINETS, INC12/14/2023
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG08/30/2023
DOB NOWMechanical SystemsSigned-off360 PRESTIGE CONTRACTING08/29/2023
DOB NOWMechanical SystemsSigned-offB H RESTORATION04/05/2023
DOB NOWGeneral ConstructionSigned-offGEORGE BIEBEL CO. INC03/23/2023
DOB NOWGeneral ConstructionSigned-offGEORGE BIEBEL CO. INC03/23/2023
DOB NOWPlumbingSigned-offRVM PLUMBING CORP03/15/2023
DOB NOWGeneral ConstructionSigned-offASA CORNER STONE BUILDERS03/13/2023
DOB NOWPlumbingSigned-offRVM PLUMBING CORP03/09/2023
DOB NOWPlumbingSigned-offPRACTICAL PLBG & HTG INC03/03/2023
DOB NOWPlumbingSigned-offRVM PLUMBING CORP02/01/2023
DOB NOWGeneral ConstructionSigned-offGEORGE BIEBEL CO. INC01/26/2023
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC01/13/2023
DOB NOWGeneral ConstructionSigned-offGEORGE BIEBEL CO. INC01/05/2023
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL11/15/2022
+ 59 more permits on file
▾Field Inspections (DOB CAP) — 41
DateTypeResultReport
09/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/27/2024Pass-Final General Construction Non-Directive 14PassView ↗
11/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/05/2024Pass-Final Sign Permit InspectionPassView ↗
08/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 41.
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
05/05/2026Energy Code Compliance InspectionsZHENHUAN XUprogress
05/05/2026Tenant Protection Plan ComplianceZHENHUAN XUspecial
04/20/2026Post-installed AnchorsLeo Leespecial
04/20/2026Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
04/28/2025Lighting in dwelling unitsAnn Macklinenergy_progress
04/28/2025Energy Code Compliance InspectionsAnn Macklinprogress
04/28/2025FinalAnn Macklinprogress
04/28/2025Fire-Resistant Penetrations and JointsAnn Macklinspecial
01/08/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/03/2025Structural Cold-Formed SteelWILLIAM DEGRAAFFspecial
12/24/2024Tenant Protection Plan ComplianceDennis Melespecial
12/24/2024MasonryDennis Melespecial
12/12/2024Energy Code Compliance InspectionsRandall Goyaprogress
12/12/2024FinalWILLIAM DEGRAAFFprogress
12/12/2024Structural Stability – Alterations of existing buildingsWILLIAM DEGRAAFFspecial
12/12/2024FinalRandall Goyaprogress
11/11/2024FinalDennis Meleprogress
08/02/2024Energy Code Compliance InspectionsJOHN CLAPPIprogress
08/02/2024HVAC-R and service water piping design and insulationJOHN CLAPPIenergy_progress
12/06/2023Interior lighting powerRUDOLPH DUPUYenergy_progress
12/06/2023Lighting controlsRUDOLPH DUPUYenergy_progress
12/06/2023Lighting in dwelling unitsRUDOLPH DUPUYenergy_progress
12/06/2023Tenant Protection Plan ComplianceRUDOLPH DUPUYspecial
12/06/2023Energy Code Compliance InspectionsRUDOLPH DUPUYprogress
11/17/2023Post-installed AnchorsGUNJAN KHANDWALAspecial
Latest 25 of 74.
▾Documents — 1,015 on file (BIS + DOB NOW)
▸Plans & Drawings46
▸DOB NOWPlans/Sketch40
09/03/2026M00527070-I1Request digital key ↗
09/03/2026M00560863-P1Request digital key ↗
09/03/2026M00560863-I1Request digital key ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/04/2026M00408570-I1Request digital key ↗
09/03/2026M00470638-P2Request digital key ↗
09/03/2026M00470638-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00470624-P4Request digital key ↗
09/03/2026M00470624-I1Request digital key ↗
▸Applications & Permits170
▸BISWORK PERMIT APPLICATION94
06/23/2022103751897Open ↗
06/22/2022103751897Open ↗
06/22/2020123699952Open ↗
Showing 3 of 94 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION73
08/14/2025101942551Open ↗
08/27/2024101497293Open ↗
06/28/2022103751897Open ↗
Showing 3 of 73 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
02/24/2021123782442Open ↗
11/06/2020123782442Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications228
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION93
01/22/2020123699952Open ↗
01/09/2020104006488Open ↗
01/09/2020104006488Open ↗
Showing 3 of 93 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature46
09/05/2026M00323803-I1Open ↗
09/03/2026M00470638-P2Open ↗
09/03/2026M00470638-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature37
09/01/2026M00818401-I1Open ↗
09/01/2026M01397064-S1Open ↗
09/01/2026M01155269-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/01/2026M00818401-I1Open ↗
09/01/2026M01397064-S1Open ↗
09/01/2026M01155269-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
10/30/2019123697810Open ↗
Showing 1 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
10/30/2019123697810Open ↗
11/09/2017123278899Open ↗
Showing 2 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment100
▸BISSELF-CERT PLUMBING NOTICE50
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 50 on file for this type
▸BISSCHEDULE B - PLUMBING30
06/23/2022103751897Open ↗
02/18/2021123782442Open ↗
02/09/2021123782442Open ↗
Showing 3 of 30 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
06/28/2022103751897Open ↗
12/18/2019104006488Open ↗
12/12/2019104006488Open ↗
Showing 3 of 18 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection17
▸BISTenant Protection Plan and Notes13
01/22/2020123699952Open ↗
10/31/2019123697543Open ↗
10/30/2019123697810Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWTenant Protection Plan2
08/15/2026M00323803-I1Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos77
▸DOB NOWDEP ACP-5: Asbestos Assessment Report34
09/03/2026M00470638-I1Open ↗
09/03/2026M00470638-P2Open ↗
09/03/2026M00470624-P4Open ↗
Showing 3 of 34 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)26
01/22/2020123699952Open ↗
01/22/2020123699952Open ↗
10/31/2019123697543Open ↗
Showing 3 of 26 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
08/07/2019123782442Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance95
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS55
01/22/2020123699952Open ↗
11/01/2019123697543Open ↗
10/31/2019123697543Open ↗
Showing 3 of 55 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS24
08/05/2021123699952Open ↗
07/19/2021123697543Open ↗
06/14/2019123165092Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
01/06/2022123782442Open ↗
08/05/2021123699952Open ↗
07/19/2021123697543Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00527070-I1Open ↗
08/13/2026M00470624-I1Open ↗
08/13/2026M00788476-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/06/2022123782442Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLIGHTING IN DWELLING UNITS1
06/18/2020123699952Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY10
07/28/2022103751897Open ↗
06/01/2022103751897Open ↗
01/06/2022123782442Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
01/25/2019123278906Open ↗
Showing 1 of 2 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/18/2020123699952Open ↗
▸Approvals, Objections & Sign-offs85
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST50
07/29/2022103751897Open ↗
01/07/2022123782442Open ↗
08/05/2021123699952Open ↗
Showing 3 of 50 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION19
06/22/2022103751897Open ↗
03/09/2020104006488Open ↗
04/19/2019123445030Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER1
10/30/2019104006488Open ↗
▸Cost, Insurance & Ownership88
▸BISCOST AFFIDAVIT82
07/19/2021123697543Open ↗
07/18/2020104006488Open ↗
03/18/2020104006488Open ↗
Showing 3 of 82 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/06/2022123782442Open ↗
▸Filing & Intake Forms79
▸BISEFILING COVER SHEET38
01/22/2020123699952Open ↗
10/31/2019123697543Open ↗
10/30/2019123697810Open ↗
Showing 3 of 38 on file for this type
▸BISBOROUGH INTAKE FORM21
03/18/2020104006488Open ↗
01/09/2020104006488Open ↗
01/09/2020104006488Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION16
11/06/2020123782442Open ↗
06/28/2019123782442Open ↗
06/28/2019123782442Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents17
▸BISDepartment of Consumer Affairs (DCA) Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWManufacturer's Specifications4
08/17/2026M01148363-I1Open ↗
08/17/2026M01148363-P2Open ↗
08/13/2026M01148363-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/17/2026M01148363-I1Open ↗
08/17/2026M01148363-P2Open ↗
08/13/2026M01148363-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
12/22/2017123165092Open ↗
Showing 1 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type