← Back
BuildNYC
Public elementary, junior or senior high
Harlem Link Charter School
20 WEST 112TH STREET · BIN 1051410
💬 Discuss this project
1967Year Built
4Stories
W1Building Class
R7-2Zoning
144,225 sfGross Floor Area
3Units
LL97 Covered26 Active Violations 1 unresolved · 25 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 115,548 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNYC Deparmeo Edusatlon, P.S. 208 Elsa EbelingUnder Construction6p · 2 filings · 19 docs
Floor 4P.S. 208 Elsa Ebeling1 filing · 20 docs
Floor 3P.S. 208 Elsa Ebeling1 filing · 20 docs
Floor 2P.S. 208 Elsa Ebeling1 filing · 20 docs
Floor 1P.S. 208 Elsa Ebeling1 filing · 20 docs
CellarP.S. 208 Elsa Ebeling1 filing · 20 docs
BasementNYC Deparmeo EdusatlonUnder Construction1p · 1 filing · 6 docs
Sub-BasementNYC Deparmeo EdusatlonUnder Construction5p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority4803/21/2026
NYC Department of Education103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Homerun Solar108/20/2026
Hartland Engineering403/23/2026
IMEG Consultants312/19/2025
Afridi Associates212/19/2025
Cta Architects112/19/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Diaz Electric of New YorkElectrical403/21/2026
Mac Fhionnghaile & SonsElectrical203/21/2026
Abm ElectricElectrical103/21/2026
Charan Electrical Enterp'sElectrical103/22/2026
Diaz Electric of New YorkElectrical103/22/2026
Sunrise Electrical SRVspecialty_contractor108/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Homerun Solar8772108/20/2026
Building Lifecycle
All (119)Filed (11)Permit Issued (1)Violation (60)Objection (17)Special Inspection (30)
08/24/2026
Permit issued — Solar
M01448071-I1-SL
08/20/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUDING ALL RELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. ELECTRICAL APP# M01446923-I1 FILED SEPARATELY. NO CHANGETO USE, EGRESS OR OCCUPANCY.
M01448071-I1
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
RAYMOND PANCHARI
08/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAYMOND PANCHARI
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND PANCHARI
08/19/2026
Special inspection requirement — Air barrier - visual inspection
RAYMOND PANCHARI
08/19/2026
Special inspection requirement — Final
RAYMOND PANCHARI
07/30/2026
Violation issued (ECB, open)
Construction
07/30/2026
Violation issued (ECB, open)
Construction
07/30/2026
Violation issued (ECB, open)
Construction
07/30/2026
Violation issued (ECB, open)
Construction
07/30/2026
Violation issued (ECB, open)
Construction
07/14/2026
Special inspection requirement — Concrete - Cast-In-Place
07/10/2026
Objection resolved — Resolved
07/07/2026
Objection resolved — Resolved
07/07/2026
Objection resolved — Resolved
05/14/2026
Objection resolved — Resolved
05/14/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
05/06/2026
Special inspection requirement — Structural Steel - Details
04/08/2026
Special inspection requirement — Deep Foundation Elements
04/08/2026
Special inspection requirement — Concrete - Cast-In-Place
04/06/2026
Objection resolved — Addressed
04/06/2026
Special inspection requirement — Concrete - Precast
04/03/2026
Objection raised — Other
03/23/2026
Filed — Alteration
REMOVAL AND REPLACEMENT OF EXISTING SITE FEATURES (I.E. PAVEMENT, FENCING, BENCHES, ETC.) TO SUPPORT THEINSTALLATION OF A NEW ELEVATOR BUILDING.
M01337070-Z2
03/23/2026
Objection raised — Other
03/23/2026
Special inspection requirement — Structural Steel - Welding
03/23/2026
Special inspection requirement — Post-installed Anchors
03/23/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
03/20/2026
Objection resolved — Resolved
03/20/2026
Special inspection requirement — Subgrade Inspections
03/20/2026
Special inspection requirement — Post-installed Anchors
03/19/2026
Special inspection requirement — Footing and Foundation
03/19/2026
Special inspection requirement — Final
03/19/2026
Special inspection requirement — Concrete - Cast-In-Place
03/19/2026
Special inspection requirement — Subgrade Inspections
03/19/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
03/18/2026
Special inspection requirement — Concrete - Cast-In-Place
03/18/2026
Special inspection requirement — Subgrade Inspections
03/18/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
03/17/2026
Special inspection requirement — Maintenance information
03/03/2026
Filed — Alteration
REMOVAL AND REPLACEMENT OF EXISTING SITE FEATURES (I.E. PAVEMENT, FENCING, BENCHES, ETC.) TO SUPPORT THEINSTALLATION OF A NEW ELEVATOR BUILDING.
M01337070-Z1
03/03/2026
Objection resolved — Addressed
02/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/05/2026
Special inspection requirement — Vestibules
01/05/2026
Special inspection requirement — Fenestration areas
01/05/2026
Special inspection requirement — Fenestration air leakage
12/29/2025
Objection raised — Other
12/29/2025
Objection raised — Other
12/29/2025
Objection raised — Other
12/29/2025
Objection raised — Other
12/29/2025
Objection raised — Other
12/29/2025
Objection raised — Other
12/29/2025
Objection raised — Other
12/29/2025
Objection raised — Other
12/19/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF EXISTING SITE FEATURES (I.E. PAVEMENT, FENCING, BENCHES, ETC.) TO SUPPORT THEINSTALLATION OF A NEW ELEVATOR BUILDING.
M01337070-S4
12/19/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF EXISTING SITE FEATURES (I.E. PAVEMENT, FENCING, BENCHES, ETC.) TO SUPPORT THEINSTALLATION OF A NEW ELEVATOR BUILDING.
M01337070-S3
12/19/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF EXISTING SITE FEATURES (I.E. PAVEMENT, FENCING, BENCHES, ETC.) TO SUPPORT THEINSTALLATION OF A NEW ELEVATOR BUILDING.
M01337070-S2
12/19/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF EXISTING SITE FEATURES (I.E. PAVEMENT, FENCING, BENCHES, ETC.) TO SUPPORT THEINSTALLATION OF A NEW ELEVATOR BUILDING.
M01337070-S9
12/19/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF EXISTING SITE FEATURES (I.E. PAVEMENT, FENCING, BENCHES, ETC.) TO SUPPORT THEINSTALLATION OF A NEW ELEVATOR BUILDING.
M01337070-S5
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSunrise Electrical SRV08/24/2026
BISOTISSUEDAbax02/09/2022
BISOTISSUEDAbax01/29/2021
BISPLISSUEDV. C. Vitanza Sons04/11/2019
BISOTISSUEDAbax12/28/2018
BISOTISSUEDAikler Asphalt Paving10/31/2018
BISOTISSUEDAbax10/25/2018
BISOTISSUEDAikler Asphalt Paving04/18/2018
BISOTISSUEDAikler Asphalt Paving04/13/2018
BISPLISSUEDV. C. Vitanza Sons03/23/2018
BISOTISSUEDAikler Asphalt Paving03/23/2018
BISEQISSUEDAikler Asphalt Paving03/23/2018
BISPLISSUEDForsythe P&H06/16/2017
BISOTISSUEDAbax12/12/2016
BISOTISSUEDAbax12/12/2016
BISMHISSUEDChapman & Evans11/18/2016
BISFPISSUEDFiremasters09/02/2016
BISPLISSUEDForsythe P&H06/03/2016
BISEQISSUEDAbax04/19/2016
BISEQISSUEDAbax04/19/2016
BISEQISSUEDAbax04/19/2016
BISEQISSUEDAbax04/19/2016
BISOTISSUEDAbax12/16/2015
BISOTISSUEDAbax12/16/2015
BISMHISSUEDChapman & Evans11/23/2015
BISPLISSUEDForsythe P&H06/03/2015
BISOTISSUEDAbax06/03/2015
BISOTISSUEDAbax06/02/2015
BISEQISSUEDAbax06/02/2015
BISMHISSUEDChapman & Evans06/02/2015
BISEQISSUEDAbax05/11/2015
BISEQISSUEDAbax04/30/2015
BISEQISSUEDAbax04/28/2015
BISOTISSUEDA.T.J. Electrical Co08/14/2014
BISOTISSUEDAtj Electical07/30/2007
BISOTISSUEDSuper Eagle Contracting07/09/2007
BISEQISSUEDSuper Eagle Contracting06/25/2007
BISOTISSUEDNYC Department of Education08/17/2005
BISEQISSUEDRockledge Scaffold01/03/2005
BISEQISSUEDRockledge Scaffold12/23/2004
+ 9 more permits on file
1 project · most recent 03/23/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/23/2026——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Lg KSSAP361A 34,000 BTU · Vrf Indoor ×4
Heating
Indeeco 922IC-3502201FF1R20S000L-W 2 kW · Electric Heater ×17
Ventilation
Loren Cook 90 ACED 800 CFM · Exhaust Fan ×4
ACED 500 CFM · Exhaust Fan ×1
Daikin DPS003A 700 CFM · Doas ×1
DPS300A 700 CFM · Rooftop Unit ×1
1 project · most recent 03/23/2026
Sprinkler System
FiledStatusContractorScope
03/23/2026——Sprinkler System
1 project · most recent 03/23/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/23/2026——Storm, Water/Sanitary
11 projects · most recent 08/17/2026
General Wiring
FiledStatusContractorScope
08/17/2026Permit IssuedRella Electric—
08/05/2026Permit IssuedRella ElectricGeneral Wiring
09/19/2025CompleteDiaz Electric of New YorkGeneral Wiring
08/11/2025CompleteGemini Electric Co—
02/20/2024CompleteGemini Electric Co—
02/07/2024CompleteGemini Electric Co—
08/11/2023CancelledMac Fhionnghaile & SonsGeneral Wiring
01/03/2023CompleteAbm ElectricGeneral Wiring
12/29/2022CompleteMac Fhionnghaile & SonsGeneral Wiring
06/26/2020CompleteCharan Electrical Enterp's—
04/30/2018CompleteGemini Electric Co—
1 project · most recent 03/23/2026
Steel Concrete
FiledStatusContractorScope
03/23/2026——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
08/19/2026Fire-Resistant Penetrations and JointsRAYMOND PANCHARIspecial
08/19/2026Air barrier - visual inspectionRAYMOND PANCHARIenergy_progress
08/19/2026FinalRAYMOND PANCHARIprogress
08/19/2026Structural Stability – Alterations of existing buildingsRAYMOND PANCHARIspecial
08/19/2026Energy Code Compliance InspectionsRAYMOND PANCHARIprogress
07/14/2026Concrete - Cast-In-Place—special
05/14/2026Subsurface Conditions – Fill Placement & In-Place Density—special
05/06/2026Structural Steel - Details—special
04/08/2026Deep Foundation Elements—special
04/08/2026Concrete - Cast-In-Place—special
04/06/2026Concrete - Precast—special
03/23/2026Structural Steel - Welding—special
03/23/2026Excavations - Sheeting, Shoring, and Bracing—special
03/23/2026Post-installed Anchors—special
03/20/2026Post-installed Anchors—special
03/20/2026Subgrade Inspections—special
03/19/2026Concrete - Cast-In-Place—special
03/19/2026Footing and Foundation—progress
03/19/2026Final—progress
03/19/2026Subsurface Conditions – Fill Placement & In-Place Density—special
03/19/2026Subgrade Inspections—special
03/18/2026Concrete - Cast-In-Place—special
03/18/2026Subgrade Inspections—special
03/18/2026Subsurface Conditions – Fill Placement & In-Place Density—special
03/17/2026Maintenance information—energy_progress
Latest 25 of 63.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NYC Deparmeo EdusatlonEducationSub-basement, Roof
Project M01448071 Alteration · Permit Entire · 08/20/2026
P.S. 208 Elsa EbelingEducationCellar, Floors 1–4, Roof
Project M01337070 Alteration · Filing Withdrawn · 12/19/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/21/2026M01448071-I1Request digital key ↗
08/20/2026M01337070-S4Request digital key ↗
08/15/2026M01337070-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits1
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
04/28/2015103001314Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026M01337070-I1Open ↗
08/15/2026M01337070-Z2Open ↗
08/13/2026M01337070-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026M01337070-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/21/2026M01448071-I1Open ↗
08/20/2026M01337070-S4Open ↗
08/20/2026M01337070-S5Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026M01448071-I1Open ↗
08/29/2026M01448071-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026M01448071-I1Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
05/13/2021103649811Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026M01448071-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026M01337070-S6Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M01337070-S6Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/21/2026M01448071-I1Open ↗
08/20/2026M01337070-S4Open ↗
08/15/2026M01337070-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)10
08/20/2026M01337070-S4Open ↗
08/15/2026M01337070-S2Open ↗
08/15/2026M01337070-Z2Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/28/2015103001314Open ↗
▸Other Documents22
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal13
08/15/2026M01337070-S2Open ↗
08/15/2026M01337070-I1Open ↗
08/15/2026M01337070-Z2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlot Diagram4
08/15/2026M01337070-I1Open ↗
08/15/2026M01337070-Z2Open ↗
08/13/2026M01337070-S6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/15/2026M01337070-I1Open ↗
08/15/2026M01337070-Z2Open ↗
08/13/2026M01337070-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026M01337070-I1Open ↗
08/15/2026M01337070-Z2Open ↗