ECB04/09/20251RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECIEVED A RETAINING WALL CONDITION ASSESS$1K due
Two stories - detached, small or mid-size · 7,560 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.