| Owner | Filings | Most Recent |
|---|---|---|
| MALL I BAY PLAZA | 414 | 03/21/2026 |
| MALL 1 BAY PLAZA | 385 | 03/21/2026 |
| BAY PLAZA COMMUNITY CENTER | 22 | 03/22/2026 |
| CITY BAY PLAZA | 17 | 03/22/2026 |
| B N 2 - BAY PLAZA | 4 | 03/21/2026 |
| LOVISA | 1 | 03/22/2026 |
| SBARRO | 1 | 03/21/2026 |
| MALL AT BAY PLAZA | 1 | 03/21/2026 |
| STS REALTY | 1 | 03/21/2026 |
| MALL 1 | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ROSINI ENGINEERING, PC | 8 | 09/15/2026 |
| JAYSON HAINES | 2 | 08/27/2026 |
| PETER A. LEPTUCH P.E. | 9 | 08/26/2026 |
| TRICARICO ARCHITECTURE AND DESIGN | 4 | 08/25/2026 |
| ARCHYTECX DESIGN AND ARCHITECTURE | 3 | 08/21/2026 |
| MPS ENGINEERING PLLC | 5 | 08/13/2026 |
| CASE ENGINEERING, INC. | 5 | 08/05/2026 |
| LOUIS KONG ARCHITECTURE LLC | 1 | 07/13/2026 |
| THOMAS A PIRTLE III | 1 | 06/26/2026 |
| EEA CONSULTING ENGINEERS | 1 | 06/22/2026 |
| N/A | 1 | 06/18/2026 |
| SARGENTI ARCHITECTS | 2 | 06/15/2026 |
| JENCEN ARCHITECTS | 2 | 04/22/2026 |
| OSBORN COMPANY ARCHITECTS-ENGINEERS | 2 | 04/02/2026 |
| STUDIO HUJI | 4 | 03/27/2026 |
| WCW ENGINEERS INC | 2 | 03/24/2026 |
| DJM CONSULTING ENGINEERING | 13 | 02/09/2026 |
| STUDIO 5 PARTNERSHIP | 5 | 02/09/2026 |
| LBI, LLC | 3 | 11/17/2025 |
| E2 ENGINEERS | 9 | 10/16/2025 |
| ACERTUS CONSULTING GROUP, LLC | 1 | 06/23/2025 |
| ARTIFEX DESIGN STUDIO | 1 | 06/20/2025 |
| MJ ENGINEERING & DESIGN | 2 | 06/03/2025 |
| MURDOCH ENGINEERING | 1 | 05/08/2025 |
| JOSE CARBALLO ARCHITECTURAL GROUP P | 1 | 01/27/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| GEORGE E BERGER ASSOCIATES | 206 | 03/21/2026 |
| BURNHAM NATIONWIDE INC | 4 | 03/21/2026 |
| TBC & ASSOC. | 6 | 03/21/2026 |
| ABCO-PEERLESS SPRINKLER | 6 | 03/21/2026 |
| JP EXPEDITE | 2 | 03/21/2026 |
| UNIVERSAL SIGNS SERVICE | 2 | 03/21/2026 |
| BMB BUILDING CONSULTING | 2 | 03/21/2026 |
| W J PROFESSIONAL EXPEDITING COMPANY | 2 | 03/21/2026 |
| ANWL | 4 | 03/21/2026 |
| BUILDING BROTHERS | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| RETAIL PROJECT MANGEMENT | General Contractor | 21 | 07/08/2026 |
| VILLAGE P & H NY INC | Plumbing | 12 | 07/08/2026 |
| HEALY CONSTRUCT SERV, INC | General Contractor | 9 | 07/03/2026 |
| VILLAGE P & H NY INC | Fire Protection | 8 | 07/08/2026 |
| TOM RECTENWALD CONSTRUCTI | General Contractor | 7 | 07/08/2026 |
| BULL CONSTRUCTION GROUP* | General Contractor | 5 | 07/08/2026 |
| CEL TECH ELECTRIC INC | General Contractor | 5 | 04/09/2026 |
| HORIZON RETAIL CONSTRUCTI | General Contractor | 4 | 07/08/2026 |
| VCMG LLC | General Contractor | 4 | 04/09/2026 |
| STRUCTURE TONE, LLC | General Contractor | 4 | 07/08/2026 |
| Z-CAR-D | Scaffold | 4 | 07/08/2026 |
| AMERICAN STANDARD P&H CORORP. | Plumbing | 4 | 07/08/2026 |
| L & M CONSTRUCTION/DRY WA | General Contractor | 4 | 04/09/2026 |
| SUPERIOR FIRE CONTROL INC | General Contractor | 3 | 03/21/2026 |
| REVIT GROUP LLC | General Contractor | 3 | 09/26/2026 |
| MEGA GENERAL CONSTRUCTION | General Contractor | 3 | 04/09/2026 |
| RRP PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| CONNOR CONSTRUCTION LLC | General Contractor | 2 | 04/09/2026 |
| L&L CONSTRUCTION DEVELOP | General Contractor | 2 | 04/09/2026 |
| JKT CONSTRUCTION INC | General Contractor | 2 | 06/28/2026 |
| S & J INDUSTRIAL CORP | Fire Protection | 2 | 07/08/2026 |
| RRP PLUMBING CORP | Fire Protection | 2 | 08/21/2026 |
| GLOBAL FACILITY MANAGEMENT | General Contractor | 2 | 04/09/2026 |
| LT PRO CONSTRUCTION INC | General Contractor | 2 | 04/09/2026 |
| E. C. PROVINI CO., INC | General Contractor | 2 | 06/23/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ETI CONSULTANTS LLC | 7694 | 26 | 09/15/2026 |
| METRIC CONSULTING AND INS | 1803 | 3 | 08/27/2026 |
| MEP INSPECTIONS, INC | 1102 | 13 | 08/26/2026 |
| AMERILAND BROOK LLC | 1506 | 1 | 07/13/2026 |
| DAVID KATZ, P.E. | 6087 | 1 | 06/22/2026 |
| QUALITY TESTING, LLC | 7344 | 4 | 06/15/2026 |
| SHAHRISH SHUVO ENGINEERIN | 8524 | 1 | 04/22/2026 |
| BIG APPLE GROUP NY A RMA | 9168 | 11 | 02/09/2026 |
| CROSSCHECK INSPECTION SER | 544 | 1 | 11/17/2025 |
| MJ ENGINEERING & DESIGN | 5546 | 2 | 06/03/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | REVIT GROUP LLC | 09/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | REVIT GROUP LLC | 07/23/2026 |
| DOB NOW | General Construction | Permit Issued | REVIT GROUP LLC | 07/23/2026 |
| DOB NOW | Standpipe | Signed-off | RRP PLUMBING CORP | 07/16/2026 |
| DOB NOW | Standpipe | Signed-off | RRP PLUMBING CORP | 07/15/2026 |
| DOB NOW | Structural | Permit Issued | HEALY CONSTRUCT SERV, INC | 07/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JKT CONSTRUCTION INC | 06/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | HEALY CONSTRUCT SERV, INC | 06/26/2026 |
| DOB NOW | General Construction | Permit Issued | HEALY CONSTRUCT SERV, INC | 06/26/2026 |
| DOB NOW | General Construction | Permit Issued | JKT CONSTRUCTION INC | 06/25/2026 |
| DOB NOW | Plumbing | Permit Issued | FULTON PLBG & HTG CORP | 06/18/2026 |
| DOB NOW | Sprinklers | Signed-off | A & F FIRE PROTECTION CO | 06/17/2026 |
| DOB NOW | General Construction | Signed-off | E. C. PROVINI CO., INC | 05/15/2026 |
| DOB NOW | General Construction | Signed-off | E. C. PROVINI CO., INC | 05/14/2026 |
| DOB NOW | Sprinklers | Permit Issued | S & J INDUSTRIAL CORP | 04/28/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | BULL CONSTRUCTION GROUP* | 04/28/2026 |
| DOB NOW | Plumbing | Signed-off | S & J INDUSTRIAL CORP | 04/27/2026 |
| DOB NOW | General Construction | Permit Issued | BULL CONSTRUCTION GROUP* | 04/24/2026 |
| DOB NOW | Plumbing | Permit Issued | M & S MECHANICAL SVCS INC | 04/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | DEMARTINO CONSTR. CO. INC | 04/02/2026 |
| DOB NOW | Sign | Signed-off | Z-CAR-D CORP | 04/01/2026 |
| DOB NOW | Sign | Signed-off | Z-CAR-D CORP | 04/01/2026 |
| DOB NOW | Sign | Signed-off | Z-CAR-D CORP | 04/01/2026 |
| DOB NOW | Sign | Signed-off | Z-CAR-D CORP | 04/01/2026 |
| DOB NOW | General Construction | Permit Issued | DEMARTINO CONSTR. CO. INC | 03/26/2026 |
| DOB NOW | General Construction | Signed-off | RETAIL PROJECT MANGEMENT | 03/19/2026 |
| DOB NOW | Plumbing | Signed-off | RRP PLUMBING CORP | 03/19/2026 |
| DOB NOW | Plumbing | Signed-off | RRP PLUMBING CORP | 03/02/2026 |
| DOB NOW | Mechanical Systems | Signed-off | RETAIL PROJECT MANGEMENT | 02/27/2026 |
| DOB NOW | General Construction | Signed-off | RETAIL PROJECT MANGEMENT | 02/26/2026 |
| DOB NOW | Plumbing | Signed-off | RRP PLUMBING CORP | 02/19/2026 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 02/13/2026 |
| DOB NOW | General Construction | Signed-off | RETAIL PROJECT MANGEMENT | 02/04/2026 |
| DOB NOW | Mechanical Systems | Signed-off | RETAIL PROJECT MANGEMENT | 02/04/2026 |
| DOB NOW | Sprinklers | Signed-off | S & J INDUSTRIAL CORP | 12/29/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | BULL CONSTRUCTION GROUP* | 11/03/2025 |
| DOB NOW | General Construction | Permit Issued | BULL CONSTRUCTION GROUP* | 11/03/2025 |
| DOB NOW | Structural | Signed-off | BULL CONSTRUCTION GROUP* | 11/03/2025 |
| DOB NOW | Sprinklers | Signed-off | S & J INDUSTRIAL CORP | 10/31/2025 |
| DOB NOW | Structural | Signed-off | RETAIL PROJECT MANGEMENT | 10/22/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/15/2026 | Permit Issued | BULL CONSTRUCTION GROUP* | Heating and Air Conditioning Systems | Heat / Cool Trane Precedent / Model No. YHK150A4S0L02P2B0A1B100C40000000000000D0 5,000 CFM · Rooftop Unit ×6 Precedent / Model No. YHK072A4S0L0AP2B0A1B100C40000000000000B0 2,400 CFM · Rooftop Unit ×4 Precedent / Model No. YHK120A4S0L0AP2B0A1B100C40000000000000B0 5,000 CFM · Rooftop Unit ×4 Precedent / Model No. YHK090A4S0L0AP2B0A1B100C40000000000000B0 3,000 CFM · Rooftop Unit ×2 Precedent / Model No. YHK102A4S0L0AP2B0A1B100C40000000000000B0 3,400 CFM · Rooftop Unit ×2 Precedent / Model No. YHK240A4S0L02P2B0A1B100C40000000000000D0 8,000 CFM · Rooftop Unit ×2 Precedent Model No. YHK090A4S0L0AP2B0A1B100C40000000000000B0 3,000 CFM · Rooftop Unit ×2 Mitsubishi Electric Mitsubishi Electric / PEAD-AA24NL 700 CFM · Split System ×2 Mitsubishi Electric / PEAD-AA30NL 800 CFM · Split System ×2 |
| 08/27/2026 | Permit Issued | HEALY CONSTRUCT SERV, INC | Heating and Air Conditioning Systems | Heat / Cool York AHD40 4,000 CFM · Ahu ×1 |
| 08/05/2026 | Permit Issued | REVIT GROUP LLC | Heating and Air Conditioning Systems | — |
| 11/17/2025 | Signed-off | STRUCTURE TONE, LLC | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric SUZ-AK48NLHZ 4 tons · Heat Pump Outdoor ×2 |
| 05/05/2023 | Permit Issued | MASTER FIRE MECH CORP | Ventilation Systems | Ventilation |
| 04/02/2023 | — | — | Air Conditioning Systems | Cooling Aaon RN-15 174,000 BTU · Rooftop Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/15/2026 | Signed-off | S & J INDUSTRIAL CORP | Sprinkler System |
| 08/27/2026 | — | — | Sprinkler System |
| 08/21/2026 | Permit Issued | S & J INDUSTRIAL CORP | Sprinkler System |
| 07/13/2026 | Signed-off | RRP PLUMBING CORP | 17 heads, 7 outlets |
| 02/23/2024 | Permit Issued | PARAMOUNT SERVICES, LLC | 40 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/15/2026 | Signed-off | S & J INDUSTRIAL CORP | Gas, Water/Sanitary |
| 08/27/2026 | Permit Issued | FULTON PLBG & HTG CORP | Water/Sanitary |
| 08/21/2026 | Signed-off | S & J INDUSTRIAL CORP | Water/Sanitary |
| 06/15/2026 | Permit Issued | M & S MECHANICAL SVCS INC | Water/Sanitary |
| 05/31/2024 | Signed-off | NEW PLBG & HTG CORP | Water/Sanitary |
| 02/23/2024 | Permit Issued | AMERICAN STANDARD P&H COR | Water/Sanitary |
| 05/05/2023 | Permit Issued | IPS PLUMBING CORP | Gas |
| 11/29/2022 | Permit Issued | AMERICAN STANDARD P&H COR | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/29/2026 | Permit Issued | CHARLES LEO ELECTRICAL | General Wiring |
| 08/03/2026 | Permit Issued | HOME RUN ELECTRIC | General Wiring |
| 08/03/2026 | Permit Issued | HOME RUN ELECTRIC | General Wiring |
| 07/17/2026 | Permit Issued | GREEN APPLE ELECL SVCS LL | General Wiring |
| 06/25/2026 | Complete | POWERONE ELECT'L CONTRG | General Wiring |
| 06/17/2026 | Complete | HIGH LEG 208 VOLTS ELECL | General Wiring |
| 05/26/2026 | Complete | ECS ELEC'L CONTG SERV INC | General Wiring |
| 04/29/2026 | Complete | ERNE VALLEY ELECTRICAL IN | General Wiring |
| 04/28/2026 | Complete | BIG ANT ELECTRIC, INC | General Wiring |
| 04/27/2026 | Complete | ERNE VALLEY ELECTRICAL IN | General Wiring |
| 04/20/2026 | Permit Issued | M F ELEC'L SVC CO., INC | General Wiring |
| 04/13/2026 | Permit Issued | ISLAND ELECTRIC CORP | — |
| 04/13/2026 | Permit Issued | ISLAND ELECTRIC CORP | — |
| 04/13/2026 | Permit Issued | ISLAND ELECTRIC CORP | — |
| 04/13/2026 | Permit Issued | ISLAND ELECTRIC CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/15/2026 | Signed-off | S & J INDUSTRIAL CORP | Steel |
| 08/27/2026 | Permit Issued | HEALY CONSTRUCT SERV, INC | Steel |
| 08/05/2026 | Permit Issued | REVIT GROUP LLC | Steel, Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/07/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/21/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/21/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 07/17/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/17/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 07/06/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/02/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/02/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/12/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/02/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/01/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/28/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/27/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/20/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/13/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/12/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/17/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/13/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/26/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/24/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/23/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/15/2026 | Final | ANTHONY MUSUMECI | progress |
| 09/15/2026 | HVAC-R and service water piping design and insulation | ANTHONY MUSUMECI | energy_progress |
| 09/15/2026 | HVAC-R and service water heating equipment | ANTHONY MUSUMECI | energy_progress |
| 09/15/2026 | HVAC-R and service water heating system controls | ANTHONY MUSUMECI | energy_progress |
| 09/15/2026 | Mechanical Systems | ANTHONY MUSUMECI | special |
| 09/01/2026 | HVAC-R and service water piping design and insulation | ANTHONY MUSUMECI | energy_progress |
| 09/01/2026 | Final | ANTHONY MUSUMECI | progress |
| 09/01/2026 | HVAC-R and service water heating system controls | ANTHONY MUSUMECI | energy_progress |
| 09/01/2026 | Mechanical Systems | ANTHONY MUSUMECI | special |
| 09/01/2026 | HVAC-R and service water heating equipment | ANTHONY MUSUMECI | energy_progress |
| 08/27/2026 | Structural Steel - Details | SAMI HAJJAR P.E | special |
| 08/27/2026 | Final | Nicolas Crosetto | progress |
| 08/27/2026 | Designated Seismic System | — | special |
| 08/20/2026 | Fire-Resistant Penetrations and Joints | Nicolas Crosetto | special |
| 08/20/2026 | Heating Systems | Nicolas Crosetto | special |
| 08/20/2026 | HVAC-R and service water piping design and insulation | Nicolas Crosetto | energy_progress |
| 08/20/2026 | Final | Nicolas Crosetto | progress |
| 08/20/2026 | Mechanical Systems | Nicolas Crosetto | special |
| 08/20/2026 | Designated Seismic System | — | special |
| 08/19/2026 | Structural Steel - Details | ANTHONY MUSUMECI | special |
| 08/19/2026 | Post-installed Anchors | ANTHONY MUSUMECI | special |
| 08/19/2026 | Structural Cold-Formed Steel | ANTHONY MUSUMECI | special |
| 08/19/2026 | Final | ANTHONY MUSUMECI | progress |
| 08/19/2026 | Designated Seismic System | — | special |
| 08/19/2026 | Structural Steel - Welding | ANTHONY MUSUMECI | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Zara | Retail | Floors 1, 2, Roof | Project X01369317 Project X01369318 Project X01369319 Project X01369320 Project X01294488 |
| Footlocker | Retail | Floor 3 | Project X01352083 |
| Apple | Retail | Floor 1 | Project X01316633 Project X00455750 Project X00455778 Project X00455876 Project X00455736 |
| Build-A-Bear Workshop | Retail | Floor 1 | Project X01237189 |
| LA Fitness | Fitness / Recreation | — | Project X01183370 |
| Community Center Bay Plaza | Other | Floor 1 | Project X01202584 |
| Starbucks | Restaurant / Food Service | Floor 1 | Project X00828278 Project X00828982 |
| BoxLunch | Retail | Floor 1 | Project X00819112 Project X00819519 |
| T-Mobile | Retail | Floor 1 | Project X00778534 Project X00575476 |
| Hollister | Retail | Floor 1 | Project X00738184 Project X00706132 Project X00706060 |
| Koi Sushi | Restaurant / Food Service | Floor 3, Roof | Project X00698510 Project X00698905 Project X00699131 |
| Pandora | Retail | Floor 1 | Project X00682329 |
| Tiger King | Retail | Floor 2 | Project X00661383 Project X00659817 Project X00659985 |
| Auntie Anne's | Retail | Floor 1 | Project X00585702 |
| Lovisa | Retail | Floor 1 | Project X00235272 |