200 Crown Street, Brooklyn: 5 open violations.
| Issued | Source | Type | Description |
|---|---|---|---|
| 2018-01-07 | hpd | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT PUBLIC HALL, 1st STORY |
| 2018-01-07 | hpd | C | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1S, 1st STORY |
| 2018-01-07 | hpd | C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1S, 1st STORY |
| 2015-06-02 | hpd | A | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE. AT PUBLIC HALL, 3rd STORY |
| 2015-03-03 | dob | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
Source: NYC Department of Buildings filings, permits and violations. Sign in to BuildNYC for plans on file, inspections and the full building record.