← Back
BuildNYC
Two family frame
200 DARLINGTON AVENUE
STATEN ISLAND · BIN 5104451
💬 Discuss this project
1990Year Built
2Stories
B2Building Class
R3XZoning
3,000 sfGross Floor Area
2Units
Two family frame · 5,800 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 23p · 1 filing · 6 docs
Floor 14p · 1 filing · 6 docs
Cellar4p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Design Build SI205/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design Build SI403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Patriot Plumbing & HeatingPlumbing107/08/2026
J.B.I. Construction GroupGeneral Contractor112/21/2022
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Design Build, SI6114205/17/2021
Building Lifecycle
06/09/2021
Signed off — Alteration
Relocate existing washer, dryer and standpipe from cellar to second floor.
S00510470-I1
05/17/2021
Filed — Alteration
Relocate existing washer, dryer and standpipe from cellar to second floor.
S00510470-P1
05/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Bonomo
05/11/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Bonomo
04/30/2021
Permit issued — Plumbing
S00510470-I1-PL
6 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPatriot Plumbing & Heating04/30/2021
BISOTISSUEDJ.B.I. Construction Group12/21/2022
BIS—ISSUEDRogers Calvanico Group10/30/2020
1 project · most recent 02/03/2023
FiledStatusContractorScope
02/03/2023CompleteJSP Electl CNTNG—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
05/17/2021Fire-Resistant Penetrations and JointsGiuseppe Bonomospecial
05/11/2021Fire-Resistant Penetrations and JointsGiuseppe Bonomospecial
52 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account