← Back
Two family converted from one family
200 DECATUR STREET
BROOKLYN · BIN 3047384
💬 Discuss this project
1886Year Built
2Stories
B3Building Class
R6BZoning
2,590 sfGross Floor Area
2Units
Two family converted from one family · 2,000 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/08/2025$2.5M—— → —$985/sf building
10/21/2022$999K—— → —$386/sf building
10/12/2022$333K—— → —$129/sf building
05/31/2019$120K—Private party → 200 DECATUR STREET LLC$46/sf building
03/22/2019$80K—— → —$31/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC405/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING SOLUTIONS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
NYC BUILDING SOLUTIONS COGeneral Contractor107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323204/16/2025
Building Lifecycle
All (16)Filed (4)Permit Issued (2)Signed Off (2)Inspection (8)
08/14/2025
Signed off — Alteration
HEREWITH TO PROPOSE NEW GYP BOARD, REPLACE EXISTING WINDOWS, TO EXISTING 2 STORY 2 FAMILY DWELLING, UPDATE FINISHES AS PER PLANS.
B00961253-I1
08/13/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/29/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/18/2025
Signed off — Alteration
HEREWITH TO PROPOSE NEW GYP BOARD, REPLACE EXISTING WINDOWS, TO EXISTING 2 STORY 2 FAMILY DWELLING, UPDATE FINISHES AS PER PLANS.
B00961253-S1
06/11/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/27/2025
Filed — Alteration
HEREWITH TO PROPOSE NEW GYP BOARD, REPLACE EXISTING WINDOWS, TO EXISTING 2 STORY 2 FAMILY DWELLING, UPDATE FINISHES AS PER PLANS.
B00961253-P2
04/16/2025
Filed — Alteration
HEREWITH TO PROPOSE NEW GYP BOARD, REPLACE EXISTING WINDOWS, TO EXISTING 2 STORY 2 FAMILY DWELLING, UPDATE FINISHES AS PER PLANS.
B00961253-P1
01/06/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/30/2024
Permit issued — Plumbing
B00961253-S1-PL
10/23/2024
Filed — Alteration
HEREWITH TO PROPOSE NEW GYP BOARD, REPLACE EXISTING WINDOWS, TO EXISTING 2 STORY 2 FAMILY DWELLING, UPDATE FINISHES AS PER PLANS.
B00961253-S1
09/23/2024
Permit issued — General Construction
B00961253-I1-GC
09/18/2024
Filed — Alteration
HEREWITH TO PROPOSE NEW GYP BOARD, REPLACE EXISTING WINDOWS, TO EXISTING 2 STORY 2 FAMILY DWELLING, UPDATE FINISHES AS PER PLANS.
B00961253-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC10/30/2024
DOB NOWGeneral ConstructionSigned-offNYC BUILDING SOLUTIONS CO09/23/2024
1 project · most recent 10/24/2024
General Wiring
FiledStatusContractorScope
10/24/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/13/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/29/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/11/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/06/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026B00961253-P2Request digital key ↗
08/23/2026B00961253-P1Request digital key ↗
08/23/2026B00961253-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026B00961253-I1Open ↗
08/13/2026B00961253-P2Open ↗
08/13/2026B00961253-P1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026B00961253-P2Open ↗
08/23/2026B00961253-I1Open ↗
08/23/2026B00961253-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B00961253-I1Open ↗
08/23/2026B00961253-P2Open ↗
08/23/2026B00961253-P1Open ↗
Showing 3 of 4 on file for this type