Roof5p · 2 filings · 20 docs
Fire ProtectionMechanical
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 3 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL DURING CONSTRUCTION IN ACCORDANCE WITH NYCC CHAPTER 33 BULIDING CODES. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
Bulkhead3p · 1 filing · 20 docs
ArchitectureFire Protection
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 3 drawing sheets
Floor 1191p · 1 filing · 20 docs
Fire Protection
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 1 drawing sheet
Floor 118
Floor 117
Floor 116
Floor 115
Floor 114
Floor 113
Floor 112
Floor 111
Floor 110
Floor 109
Floor 108
Floor 107
Floor 106
Floor 105
Floor 104
Floor 103
Floor 102
Floor 101
Floor 100
Floor 99
Floor 98
Floor 97
Floor 96
Floor 95
Floor 94
Floor 93
Floor 92
Floor 91
Floor 90
Floor 89
Floor 88
Floor 87
Floor 86
Floor 85
Floor 84
Floor 83
Floor 82
Floor 81
Floor 80
Floor 79
Floor 78
Floor 77
Floor 76
Floor 75
Floor 74
Floor 73
Floor 72
Floor 71
Floor 70
Floor 69
Floor 68
Floor 67
Floor 66
Floor 65
Floor 64
Floor 63
Floor 62
Floor 61
Floor 60
Floor 59
Floor 58
Floor 57
Floor 56
Floor 55
Floor 54
Floor 53
Floor 52
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 194p · 1 filing · 20 docs
ArchitectureFire ProtectionPlumbing
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 4 drawing sheets
Floor 184p · 1 filing · 20 docs
ArchitectureFire ProtectionPlumbingStructural
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 4 drawing sheets
Floor 173p · 1 filing · 20 docs
ArchitectureFire ProtectionZ
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 3 drawing sheets
Floor 163p · 1 filing · 20 docs
ArchitectureFire Protection
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 3 drawing sheets
Floor 154p · 1 filing · 20 docs
ArchitectureFire ProtectionGeneral
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 4 drawing sheets
Floor 142p · 1 filing · 20 docs
ArchitectureFire Protection
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 2 drawing sheets
Floor 132p · 1 filing · 20 docs
ArchitectureFire Protection
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 2 drawing sheets
Floor 122p · 1 filing · 20 docs
ArchitectureFire Protection
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 2 drawing sheets
Floor 112p · 1 filing · 20 docs
ArchitectureFire Protection
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 2 drawing sheets
Floor 102p · 1 filing · 20 docs
ArchitectureFire Protection
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 2 drawing sheets
Floor 96p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralPlumbing
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 5 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB#121188936.TWO FDC'S ARE LOCATED ON THE GROUND FLOOR. AND 2, 2.5 FIRE HOSE VALVES FOR MANUAL AIR RELEASE
On file for this project
3 documents · 1 drawing sheet
Floor 85p · 2 filings · 20 docs
ArchitectureElectricalFire ProtectionPlumbing
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 4 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB#121188936.TWO FDC'S ARE LOCATED ON THE GROUND FLOOR. AND 2, 2.5 FIRE HOSE VALVES FOR MANUAL AIR RELEASE
On file for this project
3 documents · 1 drawing sheet
Floor 76p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralPlumbing
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 5 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB#121188936.TWO FDC'S ARE LOCATED ON THE GROUND FLOOR. AND 2, 2.5 FIRE HOSE VALVES FOR MANUAL AIR RELEASE
On file for this project
3 documents · 1 drawing sheet
Floor 63p · 2 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 2 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB#121188936.TWO FDC'S ARE LOCATED ON THE GROUND FLOOR. AND 2, 2.5 FIRE HOSE VALVES FOR MANUAL AIR RELEASE
On file for this project
3 documents · 1 drawing sheet
Floor 52p · 1 filing · 20 docs
ArchitectureFire ProtectionPlumbing
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 2 drawing sheets
Floor 42p · 1 filing · 20 docs
ArchitectureFire ProtectionPlumbing
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 2 drawing sheets
Floor 32p · 1 filing · 20 docs
ArchitectureFire ProtectionPlumbing
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 2 drawing sheets
Floor 25p · 2 filings · 20 docs
ArchitectureFire Protection
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 4 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB#121188936.TWO FDC'S ARE LOCATED ON THE GROUND FLOOR. AND 2, 2.5 FIRE HOSE VALVES FOR MANUAL AIR RELEASE
On file for this project
3 documents · 1 drawing sheet
Floor 19p · 2 filings · 12 docs
ArchitectureDMFire Protection
SPRINKLER MODIFICATION WORK ON THE FIRST FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
INTERIOR RENOVATION WORK ON THE FIRST FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.
On file for this project
6 documents · 7 drawing sheets
Cellar3p · 2 filings · 20 docs
Fire ProtectionPlumbing
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. TOTAL OF 1,090 SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121188936
On file for this project
39 documents · 3 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB#121188936.TWO FDC'S ARE LOCATED ON THE GROUND FLOOR. AND 2, 2.5 FIRE HOSE VALVES FOR MANUAL AIR RELEASE
On file for this project
3 documents · 1 drawing sheet