← Back
BuildNYC
Elevator cooperative
Crystal House
200 EAST 24TH STREET · Gramercy · BIN 1019782
💬 Discuss this project
1972Year Built
18Stories
D4Building Class
C2-8AZoning
144,860 sfGross Floor Area
165Units
LL97 CoveredRent Stabilized5 Active Violations 2 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: Crystal House Owners Inc C/O Matthew Ada MS Properties · 12,050 sf lot · 12.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsCrystal House Owners INC.1 filing
RoofFISP Inspection using Industrial Rope AccessUnder Construction1p · 1 filing
Floor 18Unit 18091p · 1 filing
Floor 17
Floor 16Unit 1605, Unit 16062 filings · 13 docs
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Unit 305, Unit 308, Unit 3093 filings · 19 docs
Floor 2
Floor 1Akam Associates, INC.4p · 4 filings · 20 docs
CellarAkam Associates, INC.2p · 1 filing · 3 docs
Site & exteriorSidewalk Shed Installation1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Matthew Adam Properties1403/21/2026
200 East 24 Street Realty503/21/2026
200 E 24th St Realty403/21/2026
200 E 24 Street Associates303/21/2026
200 East 24th Street Coop203/21/2026
200 East 24 Street Owners103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Merritt Engineering Consultant803/21/2026
Municipal Building Consultants603/21/2026
New Code Consulting803/21/2026
Maryclare Nepogoda103/21/2026
ADG103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kay Waterproofingspecialty_contractor607/08/2026
Platinum Services NYScaffold407/08/2026
Mr. Green ContractorsGeneral Contractor303/21/2026
The Metro Group ElectricElectrical303/21/2026
Lelcaj ConstructionGeneral Contractor303/21/2026
VDJ ConstructionGeneral Contractor203/21/2026
Syed-Naqvi AltafElectrical103/21/2026
Alson Electrical ContractingElectrical103/21/2026
The Metro Group ElectricElectrical103/22/2026
KBRNYGeneral Contractor104/09/2026
Crossfield Plumbing & HeatingPlumbing107/08/2026
John Fitzgerald Plumbing & HeatingPlumbing107/08/2026
Itkin ElectricElectrical103/22/2026
P.S.I. MechanicalPlumbing107/08/2026
Hylan Datacom & ElectricalElectrical103/21/2026
Csi Electrical & Mechanical IElectrical103/21/2026
Bec Electrical ContractorsElectrical103/21/2026
P.S. Marcato Elev. CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Chen Engineering Services1826306/22/2026
Paradigm Architecture5931609/19/2024
The Eipel Engineering Group2714301/08/2024
Merritt Engineering Consulting460410/05/2022
Building Lifecycle
All (168)Filed (22)Permit Issued (14)Signed Off (8)Facade (FISP) (15)Violation (60)Inspection (1)Objection (18)Special Inspection (30)
10/08/2026
Signed off — Alteration
REPLACE, RELOCATE AND ADD PLUMBING FIXTURES PER SCHEDULE B AS INDICATED IN DRAWINGS FILED HEREWITH.
M01175145-I1
10/08/2026
Signed off — Alteration
COMBINATION OF EXISTING APARTMENTS 308 and 309, TO COMPLY WTH TPPN 03/97. RENOVATION TO INCLUDE MINOR REMOVAL AND INSTALLATION OF NON LOAD-BEARING INTERIOR PARTITIONS AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01175013-I1
09/29/2026
Signed off — Alteration
Combination of apartments 1605 & 1606 including, removal of non-load-bearing partitions and minor interior alteration of the existing layout. Related plumbing work filed under separate application.
M00599314-I1
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HENLIA CHEN
06/25/2026
Permit issued — Suspended Scaffold
M01404458-I1-SC
06/22/2026
Filed — Alteration
REPLACE, RELOCATE AND ADD PLUMBING FIXTURES PER SCHEDULE B AS INDICATED IN DRAWINGS FILED HEREWITH.
M01175145-P1
06/11/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01404458-I1
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HENLIA CHEN
12/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/06/2025
Permit issued — General Construction
M01175013-I1-GC
10/31/2025
Permit issued — Plumbing
M01175145-I1-PL
10/02/2025
Filed — Alteration
REPLACE, RELOCATE AND ADD PLUMBING FIXTURES PER SCHEDULE B AS INDICATED IN DRAWINGS FILED HEREWITH.
M01175145-I1
10/02/2025
Filed — Alteration
COMBINATION OF EXISTING APARTMENTS 308 and 309, TO COMPLY WTH TPPN 03/97. RENOVATION TO INCLUDE MINOR REMOVAL AND INSTALLATION OF NON LOAD-BEARING INTERIOR PARTITIONS AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01175013-I1
09/27/2025
Special inspection requirement — Lighting in dwelling units
Joshua Manes
09/27/2025
Special inspection requirement — Lighting controls
Joshua Manes
09/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
HENLIA CHEN
09/24/2025
Special inspection requirement — Post-installed Anchors
HENLIA CHEN
09/15/2025
Special inspection requirement — Final
EMILY CHANG-ZIDAROV
09/04/2025
Filed — Alteration
Combination of apartments 1605 & 1606 including, removal of non-load-bearing partitions and minor interior alteration of the existing layout. Related plumbing work filed under separate application.
M00599314-P2
09/04/2025
Filed — Alteration
New water connection for washing machine in 1605
M00599324-P1
07/28/2025
Special inspection requirement — Final
Joshua Manes
06/16/2025
Permit issued — General Construction
M00599314-I1-GC
11/22/2024
Violation issued (HPD, closed)
I
09/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Addesso
09/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
Anthony Addesso
09/30/2024
Special inspection requirement — Final
Anthony Addesso
09/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
Anthony Addesso
09/26/2024
Objection resolved — Addressed
09/24/2024
Objection raised — Scope
09/19/2024
Filed — Alteration
THE REPLACEMENT OF AN EXISTING ELEVATOR PRIVATELY OWNED PLAZA (POP) WITH A SIDEWALK ELEVATOR IN AN EXISTING HOISTWAY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00971258-P1
09/04/2024
Special inspection requirement — Final
Anthony Addesso
09/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Addesso
09/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
Anthony Addesso
09/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
Anthony Addesso
07/09/2024
Signed off — Alteration
GARAGE REPAIRS TO INCLUDE CRACK REPAIRS. WALL AND SLAB REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01013905-I1
06/11/2024
Objection resolved — Addressed
06/11/2024
Objection resolved — Addressed
06/10/2024
Objection resolved — Addressed
06/05/2024
Objection raised — Scope
05/22/2024
Objection resolved — Addressed
05/22/2024
Objection resolved — Addressed
05/22/2024
Objection resolved — Addressed
05/22/2024
Objection resolved — Addressed
05/21/2024
Permit issued — General Construction
M01013905-I1-GC
05/17/2024
Objection resolved — Addressed
05/06/2024
Objection raised — Scope
05/06/2024
Objection raised — Scope
05/06/2024
Objection raised — Scope
05/06/2024
Objection raised — Scope
05/06/2024
Objection raised — Scope
04/30/2024
Filed — Alteration
THE REPLACEMENT OF AN EXISTING ELEVATOR PRIVATELY OWNED PLAZA (POP) WITH A SIDEWALK ELEVATOR IN AN EXISTING HOISTWAY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00971258-S2
03/26/2024
Filed — Alteration
GARAGE REPAIRS TO INCLUDE CRACK REPAIRS. WALL AND SLAB REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01013905-I1
01/10/2024
Objection raised — Scope
01/10/2024
Objection raised — Scope
01/08/2024
Filed — Alteration
THE REPLACEMENT OF AN EXISTING ELEVATOR PRIVATELY OWNED PLAZA (POP) WITH A SIDEWALK ELEVATOR IN AN EXISTING HOISTWAY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00971258-S1
01/05/2024
Filed — Alteration
THE REPLACEMENT OF AN EXISTING ELEVATOR PRIVATELY OWNED PLAZA (POP) WITH A SIDEWALK ELEVATOR IN AN EXISTING HOISTWAY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00971258-I1
12/11/2023
Signed off — Alteration
Remove and replace plaza concrete toping slab, installation of new waterproofing membrane, and brick masonry replacement for through wall flashing installation. No change in use, egress or occupancy.
M08010881-I1
12/05/2023
Special inspection requirement — Concrete - Cast-In-Place
Bix Ellenbecker
12/04/2023
Special inspection requirement — Masonry
Bix Ellenbecker
12/04/2023
Special inspection requirement — Tenant Protection Plan Compliance
Latest 60 of 168 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation S06/25/2026
DOB NOWGeneral ConstructionSigned-offKBRNY11/06/2025
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating10/31/2025
DOB NOWGeneral ConstructionSigned-offMr. Green Contractors06/16/2025
DOB NOWGeneral ConstructionSigned-offKay Waterproofing05/21/2024
DOB NOWGeneral ConstructionSigned-offLelcaj Construction02/17/2023
DOB NOWGeneral ConstructionSigned-offKay Waterproofing01/17/2023
DOB NOWGeneral ConstructionSigned-offKay Waterproofing09/09/2022
DOB NOWSidewalk ShedSigned-offPlatinum Services NY05/19/2022
DOB NOWPlumbingPermit IssuedP.S.I. Mechanical01/11/2022
DOB NOWGeneral ConstructionSigned-offVDJ Construction01/01/2022
DOB NOWGeneral ConstructionSigned-offKay Waterproofing09/14/2021
DOB NOWSidewalk ShedSigned-offPlatinum Services NY05/13/2021
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating08/06/2019
BISOTISSUEDThomas Maintenance06/09/2020
BISOTISSUEDThomas Maintenance06/26/2019
BISOTISSUEDThomas Maintenance05/20/2019
BISPLISSUEDNational Mechanical Services Plumbing06/26/2018
BISOTISSUEDThe Metro Group06/26/2018
BISPLISSUEDPlumbing Plumbing & Plumbing01/17/2018
BISOTISSUEDReliable Design01/11/2018
BISPLISSUEDPremier Flow Plumbing and Heating11/09/2017
BISOTISSUEDManhattan Renovations10/10/2017
BISEQISSUEDMetro Contracting NY07/05/2017
BISOTISSUEDManhattan Renovations04/17/2017
BISOTISSUEDJimco Renovation03/08/2017
BISPLISSUEDPremier Flow Plumbing and Heating08/26/2016
BISPLISSUEDAccurate Mechanical08/10/2016
BISOTISSUEDManhattan Renovations08/03/2016
BISOTISSUEDJimco Renovation07/06/2016
BISEQISSUEDMetro Contracting NY06/09/2016
BISOTISSUEDMonument Contracting06/07/2016
BISOTISSUEDMonument Contracting06/07/2016
BISEQISSUEDIntersystem S&S05/02/2016
BISEQISSUEDIntersystem S&S05/02/2016
BISPLISSUEDThe Plumbing & Heating Specialist02/11/2016
BISOTISSUEDGlenveigh Contracting12/14/2015
BISOTISSUEDKelleher Contracting11/16/2015
BISOTISSUEDBuilding Equity10/01/2015
BISPLISSUEDB & A Plumbing & Heating08/13/2015
+ 24 more permits on file
2 projects · most recent 06/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/22/2026Signed-offJohn Fitzgerald Plumbing & HeatingGas, Water/Sanitary
09/04/2025Permit IssuedP.S.I. MechanicalGas, Water/Sanitary
15 projects · most recent 11/26/2025
General Wiring Boiler Controls
FiledStatusContractorScope
11/26/2025Permit IssuedFraccavento ElectricGeneral Wiring
08/22/2025CompleteThe Metro Group ElectricGeneral Wiring
05/09/2025CompleteAmsterdam ElectricGeneral Wiring
08/24/2023CompleteThe Metro Group ElectricGeneral Wiring
07/17/2023CompleteMain Power Electric Contracting—
03/16/2023CompleteP.S. Marcato Elev. Co—
06/22/2022CompleteMartin DorkinGeneral Wiring
09/01/2021CompleteFas Electric—
08/12/2021Permit IssuedJoseph Weinstein ElectricGeneral Wiring
08/02/2021Permit IssuedThe Metro Group ElectricGeneral Wiring
04/27/2021Permit IssuedRainbow Electric CoGeneral Wiring
04/26/2021CompleteIlluminous Electric—
01/23/2020CompleteA Electrical Main ServiceGeneral Wiring
09/17/2018CompleteItkin ElectricBoiler Controls
02/24/2018CompleteItkin ElectricBoiler Controls
2 projects · most recent 09/19/2024
Steel Concrete
FiledStatusContractorScope
09/19/2024——Steel, Concrete
11/27/2023——Steel, Concrete
1 project · most recent 06/11/2026
FiledStatusContractorScope
06/11/2026Permit IssuedStructural Preservation S—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
07/13/2026Fire-Resistant Penetrations and JointsHENLIA CHENspecial
06/11/2026Fire-Resistant Penetrations and JointsHENLIA CHENspecial
09/27/2025Lighting in dwelling unitsJoshua Manesenergy_progress
09/27/2025Lighting controlsJoshua Manesenergy_progress
09/24/2025Fire-Resistant Penetrations and JointsHENLIA CHENspecial
09/24/2025Post-installed AnchorsHENLIA CHENspecial
09/15/2025FinalEMILY CHANG-ZIDAROVprogress
07/28/2025FinalJoshua Manesprogress
09/30/2024Structural Stability – Alterations of existing buildingsAnthony Addessospecial
09/30/2024Fire-Resistance Rated ConstructionAnthony Addessoprogress
09/30/2024FinalAnthony Addessoprogress
09/30/2024Tenant Protection Plan ComplianceAnthony Addessospecial
09/04/2024FinalAnthony Addessoprogress
09/04/2024Structural Stability – Alterations of existing buildingsAnthony Addessospecial
09/04/2024Tenant Protection Plan ComplianceAnthony Addessospecial
09/04/2024Fire-Resistance Rated ConstructionAnthony Addessoprogress
12/05/2023Concrete - Cast-In-PlaceBix Ellenbeckerspecial
12/04/2023MasonryBix Ellenbeckerspecial
12/04/2023Tenant Protection Plan Compliance—special
12/04/2023FinalBix Ellenbeckerprogress
12/04/2023Footing and FoundationBix Ellenbeckerprogress
12/04/2023Concrete - Cast-In-PlaceBix Ellenbeckerspecial
12/04/2023Structural Stability – Alterations of existing buildingsBix Ellenbeckerspecial
12/04/2023Structural Steel - DetailsBix Ellenbeckerspecial
12/04/2023Tenant Protection Plan Compliance—special
Latest 25 of 46.
▾Documents — 468 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch17
09/03/2026M00510346-I1Request digital key ↗
09/03/2026M00510346-P1Request digital key ↗
09/01/2026M08010881-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/03/2026M00464799-I1Request digital key ↗
09/03/2026M00464799-P2Request digital key ↗
09/03/2026M00464799-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00193479-I1Request digital key ↗
▸Applications & Permits77
▸BISWORK PERMIT APPLICATION42
07/31/2019123709086Open ↗
06/26/2019123704866Open ↗
05/20/2019123704866Open ↗
Showing 3 of 42 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION34
02/24/2020123709086Open ↗
10/25/2019123550424Open ↗
10/23/2019123550424Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWState DEC Permit1
08/13/2026M00193479-I1Open ↗
▸Seals & Professional Certifications144
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION43
03/17/2020123709086Open ↗
07/22/2019123709086Open ↗
03/25/2019123704866Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/05/2026M00193479-I1Open ↗
09/03/2026M00464799-P2Open ↗
09/03/2026M00464799-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/27/2026M00971258-S1Open ↗
09/01/2026M01175013-I1Open ↗
09/01/2026M01175013-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/27/2026M00971258-S1Open ↗
09/27/2026M00971258-S1Open ↗
09/01/2026M01175013-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
06/25/2018123550424Open ↗
12/15/2017140506995Open ↗
06/07/2016122790024Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
06/25/2018123550424Open ↗
12/15/2017140506995Open ↗
06/10/2016140506995Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
06/10/2016140506995Open ↗
06/07/2016140504791Open ↗
04/29/2016140489530Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
06/10/2016140506995Open ↗
06/07/2016140504791Open ↗
04/29/2016140489530Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
10/25/2019123550424Open ↗
10/23/2019123550424Open ↗
06/11/2019123550424Open ↗
Showing 3 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/21/2019123550424Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes6
07/22/2019123709086Open ↗
03/25/2019123704866Open ↗
06/07/2016122790024Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00193479-I1Open ↗
▸Environmental & Asbestos34
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/05/2026M00193479-I1Open ↗
08/28/2026M00957872-I1Open ↗
08/21/2026M00599324-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
07/22/2019123709086Open ↗
03/25/2019123704866Open ↗
06/25/2018123550424Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/03/2026M00464799-I1Open ↗
08/21/2026M01175013-I1Open ↗
08/21/2026M01175145-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance37
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
03/17/2020123709086Open ↗
07/31/2019123709086Open ↗
07/22/2019123709086Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
04/27/2021123550424Open ↗
10/23/2020123704866Open ↗
03/17/2020123709086Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/27/2021123550424Open ↗
10/23/2020123704866Open ↗
10/23/2020123704866Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
04/27/2021123550424Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00464799-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
04/27/2021123550424Open ↗
04/27/2021123550424Open ↗
10/23/2020123704866Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs32
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
04/27/2021123550424Open ↗
10/23/2020123704866Open ↗
03/17/2020123709086Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/27/2021123550424Open ↗
06/26/2017121514539Open ↗
11/22/2016140353187Open ↗
▸BISSUPERSEDING LETTER1
08/10/2016122790024Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP Variance (V5) letter1
09/03/2026M00464799-I1Open ↗
▸Cost, Insurance & Ownership40
▸BISCOST AFFIDAVIT37
04/27/2021123550424Open ↗
10/23/2020123704866Open ↗
10/23/2020123704866Open ↗
Showing 3 of 37 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
06/07/2016122790024Open ↗
Showing 1 of 2 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms37
▸BISEFILING COVER SHEET18
07/22/2019123709086Open ↗
03/25/2019123704866Open ↗
06/25/2018123550424Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM8
03/17/2020123709086Open ↗
02/24/2020123709086Open ↗
10/23/2019123550424Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION6
03/05/2020123709086Open ↗
12/15/2017140506995Open ↗
11/16/2017123240322Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
06/10/2016140506995Open ↗
06/07/2016140504791Open ↗
04/29/2016140489530Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
04/27/2021123550424Open ↗
Showing 1 of 3 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type