Elevator apt, fireproof with stores
200 EAST 75TH STREET
💬 Discuss this project
2023Year Built
18Stories
D6Building Class
—Zoning
116,991 sfGross Floor Area
37Units
Rent Stabilized1 Open Violation ▸
Elevator apt, fireproof with stores · Owner of record: EJS 1303 THIRD, LLC · 8,163 sf lot · 14.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
Roof3p · 3 filings
Floor 181 filing
Floor 171 filing
Floor 161 filing
Floor 151 filing
Floor 143p · 2 filings
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 51p · 3 filings
Floor 41p · 3 filings
Floor 31p · 3 filings
Floor 21p · 3 filings
Floor 1Under Construction17p · 7 filings · 20 docs
Cellar2p · 3 filings
Site & exterior11 filings
Filed — no permit issued1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EJS GROUP9408/29/2026
PLATINUM SERVICES NY1707/08/2026
EJS 1303 THIRD, LLC1503/22/2026
ALBA SERVICES1307/08/2026
GASTONIA203/21/2026
109 EAST 67TH STREET203/21/2026
GASTONIA PROPERTY MANAGMENT LLC103/22/2026
TOWNY103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/04/2021$13.6M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE3603/21/2026
WILLIAM VITACCO ASSOCIATES7203/21/2026
GREEN STUDIO603/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
KD DESIGNS303/21/2026
THE GREEN STUDIO303/21/2026
ECC403/21/2026
EXPEDITE DEM203/21/2026
MILLENNIUM DESIGNS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S&E BRIDGE & SCAFFOLD LLC.General Contractor2707/08/2026
TRITON CONSTRUCTION CO.,General Contractor2607/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor1307/08/2026
ALBA SERVICES INCGeneral Contractor1007/08/2026
STAT FIRE SPRINKLER NYC CFire Protection807/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor307/08/2026
DEMAR MECHANICAL INCPlumbing307/08/2026
STAT FIRE SPRINKLER NYC CPlumbing203/22/2026
CASINO DEVELOPMENT GROUPGeneral Contractor204/09/2026
STEADFAST DEVELOPMENT ANDGeneral Contractor206/28/2026
P & D MECHANICAL CORPFire Protection107/22/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
DELCO ELECTRICAL CORP.Electrical103/22/2026
JACKUS, STEVEElectrical103/21/2026
ARMON MECHANICAL INCPlumbing107/08/2026
CM PLUMBING INCPlumbing107/15/2026
HINKE, WILLIAMElectrical103/21/2026
HOME CRAFTS, INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QUALITY TESTING, LLC7344406/17/2026
SPECIAL TESTING & CONSULT16882904/08/2026
ROBERT F. GERMAIN JR. PE5100103/04/2026
G. BLINN CONSULTING, LLC2894408/18/2025
MUESER RUTLEDGE CONSULTIN977305/02/2023
Building Lifecycle
All (300)Filed (58)Permit Issued (67)Signed Off (25)Violation (13)Inspection (36)Objection (71)Special Inspection (30)
08/12/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/20/2026
Permit issued — Sprinklers
M01390382-S3-EW-SP
07/14/2026
Permit issued — Plumbing
M01390382-S2-PL
06/26/2026
Permit issued — Mechanical Systems
M01390382-S1-MS
06/17/2026
Filed — Alteration
General Construction work as shown on plans
M01390382-S2
06/17/2026
Filed — Alteration
General Construction work as shown on plans
M01390382-S1
06/15/2026
Permit issued — General Construction
M01390382-I1-GC
06/11/2026
Special inspection requirement — Maintenance information
KEVIN SNEDEKER
06/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
KEVIN SNEDEKER
06/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
KEVIN SNEDEKER
06/11/2026
Special inspection requirement — Post-installed Anchors
KEVIN SNEDEKER
06/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
KEVIN SNEDEKER
06/09/2026
Filed — Alteration
General Construction work as shown on plans
M01390382-S3
06/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
KEVIN SNEDEKER
06/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
KEVIN SNEDEKER
06/05/2026
Special inspection requirement — Maintenance information
KEVIN SNEDEKER
06/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
KEVIN SNEDEKER
06/03/2026
Filed — Alteration
General Construction work as shown on plans
M01390382-I1
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KEVIN SNEDEKER
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
KEVIN SNEDEKER
06/01/2026
Special inspection requirement — Heating Systems
KEVIN SNEDEKER
06/01/2026
Special inspection requirement — Post-installed Anchors
KEVIN SNEDEKER
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KEVIN SNEDEKER
05/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/04/2026
Signed off — New Building
Sprinkler/Standpipe work as shown on plans filed herewith. Filed in conjunction with New Building application M00723903-I1.
M00723903-S6
05/01/2026
Special inspection requirement — Protection of exposed foundation insulation
SEBASTIAN SETTEDUCATE JR., P.E
05/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SEBASTIAN SETTEDUCATE JR., P.E
05/01/2026
Special inspection requirement — Air barrier - visual inspection
SEBASTIAN SETTEDUCATE JR., P.E
05/01/2026
Special inspection requirement — Insulation placement and R values
SEBASTIAN SETTEDUCATE JR., P.E
05/01/2026
Special inspection requirement — Vestibules
SEBASTIAN SETTEDUCATE JR., P.E
05/01/2026
Special inspection requirement — Air barrier continuity plan testing
SEBASTIAN SETTEDUCATE JR., P.E
05/01/2026
Special inspection requirement — Fenestration areas
SEBASTIAN SETTEDUCATE JR., P.E
05/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
SEBASTIAN SETTEDUCATE JR., P.E
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
05/01/2026
Special inspection requirement — Fenestration air leakage
SEBASTIAN SETTEDUCATE JR., P.E
05/01/2026
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
04/29/2026
Signed off — New Building
Sprinkler/Standpipe work as shown on plans filed herewith. Filed in conjunction with New Building application M00723903-I1.
M00723903-S7
04/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/21/2026
Special inspection requirement — Mechanical Systems
KEVIN SNEDEKER
04/21/2026
Special inspection requirement — Final
KEVIN SNEDEKER
04/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2026
Filed — New Building
Sprinkler/Standpipe work as shown on plans filed herewith. Filed in conjunction with New Building application M00723903-I1.
M00723903-C7
04/06/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00992471-I1
04/03/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
04/02/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
04/02/2026
Special inspection requirement — Insulation placement and R values
SEBASTIAN SETTEDUCATE JR., P.E
03/26/2026
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE INSTALLED ON SW/RDWY. DOT PERMITS BY OTHERS.
M00810684-I1
03/24/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/20/2026
Signed off — Alteration
INSTALL (5) NEW GAS FIRED F/PLACES WITH (5) NEW FLUES UP TO ROOF, DIRECT VENT. (1) F/PLACE FLUE 1ST FL GROUND AMENITIES ROOM, DIRECT VENT. (1) F/PLACE FLUE OUTDOOR UNIT AMENITIES COURTYARD, DIRECT VENT. ALL IN CONJ WITH NB, GAS FIRED UNDER NB M00723903.
M01358515-I1
03/19/2026
Permit issued — General Construction
M00723903-I1-GC
03/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/12/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/10/2026
Permit issued — General Construction
M01358515-I1-GC
03/06/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/04/2026
Filed — Alteration
INSTALL (5) NEW GAS FIRED F/PLACES WITH (5) NEW FLUES UP TO ROOF, DIRECT VENT. (1) F/PLACE FLUE 1ST FL GROUND AMENITIES ROOM, DIRECT VENT. (1) F/PLACE FLUE OUTDOOR UNIT AMENITIES COURTYARD, DIRECT VENT. ALL IN CONJ WITH NB, GAS FIRED UNDER NB M00723903.
M01358515-I1
03/04/2026
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01094118-I1
03/04/2026
Signed off — Alteration
TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS DURING NB CONST, FILED SEP. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01209539-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedP & D MECHANICAL CORP07/20/2026
DOB NOWPlumbingPermit IssuedCM PLUMBING INC07/14/2026
DOB NOWMechanical SystemsPermit IssuedSTEADFAST DEVELOPMENT AND06/26/2026
DOB NOWGeneral ConstructionPermit IssuedSTEADFAST DEVELOPMENT AND06/15/2026
DOB NOWGeneral ConstructionPermit IssuedTRITON CONSTRUCTION CO.,03/19/2026
DOB NOWGeneral ConstructionSigned-offHOME CRAFTS03/10/2026
DOB NOWGeneral ConstructionPermit IssuedTRITON CONSTRUCTION CO.,12/23/2025
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC09/29/2025
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC09/12/2025
DOB NOWSprinklersSigned-offSTAT FIRE SPRINKLER NYC C09/04/2025
DOB NOWStandpipeSigned-offSTAT FIRE SPRINKLER NYC C09/04/2025
DOB NOWCurb CutPermit IssuedTRITON CONSTRUCTION CO.,08/27/2025
DOB NOWGeneral ConstructionPermit IssuedTRITON CONSTRUCTION CO.,08/26/2025
DOB NOWMechanical SystemsSigned-offTRITON CONSTRUCTION CO.,08/25/2025
DOB NOWPlumbingPermit IssuedDEMAR MECHANICAL INC08/06/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC06/02/2025
DOB NOWSuspended ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC04/14/2025
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ03/24/2025
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC01/17/2025
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC12/05/2024
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ10/23/2024
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC09/27/2024
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC09/26/2024
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC09/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC09/26/2024
DOB NOWMechanical SystemsSigned-offTRITON CONSTRUCTION CO.,09/10/2024
DOB NOWGeneral ConstructionPermit IssuedTRITON CONSTRUCTION CO.,09/10/2024
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC08/12/2024
DOB NOWSprinklersSigned-offSTAT FIRE SPRINKLER NYC C08/02/2024
DOB NOWStandpipeSigned-offSTAT FIRE SPRINKLER NYC C07/31/2024
DOB NOWStandpipeSigned-offSTAT FIRE SPRINKLER NYC C07/30/2024
DOB NOWGeneral ConstructionPermit IssuedTRITON CONSTRUCTION CO.,07/26/2024
DOB NOWPlumbingPermit IssuedDEMAR MECHANICAL INC07/26/2024
DOB NOWStructuralSigned-offTHE I-GRACE COMPANY COMMI07/12/2024
DOB NOWGeneral ConstructionPermit IssuedTRITON CONSTRUCTION CO.,05/06/2024
DOB NOWMechanical SystemsSigned-offTRITON CONSTRUCTION CO.,05/03/2024
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC02/05/2024
DOB NOWMechanical SystemsSigned-offTRITON CONSTRUCTION CO.,01/18/2024
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC12/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC12/04/2023
+ 33 more permits on file
2 projects · most recent 06/17/2026
Heating and Air Conditioning Systems Heating Systems Associated Ducts and Piping Generators Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/17/2026Permit IssuedSTEADFAST DEVELOPMENT ANDHeating and Air Conditioning Systems, Heating Systems—
04/08/2026Permit IssuedTRITON CONSTRUCTION CO.,Associated Ducts and Piping, Generators, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARUM168DTE5 189,000 BTU · Vrf Outdoor ×51
ARUM144DTE5 162,000 BTU · Vrf Outdoor ×4
ARUM096DTE5 108,000 BTU · Vrf Outdoor ×2
ARUM121DTE5 135,000 BTU · Vrf Outdoor ×2
ARUM168BTE5 189,000 BTU · Vrf Outdoor ×2
ARUN024GSS4 27,000 BTU · Vrf Outdoor ×2
ARUN038GSS4 42,000 BTU · Vrf Outdoor ×2
ARUM072DTE5 81,000 BTU · Vrf Outdoor ×2
Aaon CFA-070-D-A-3-DJ00T 803,200 BTU · Ahu ×2
Ventilation
Aaon RNA-070-D-0-3-0NB0Q-A03N0 15,000 CFM · Makeup Air ×2
Generators
Generac OK5097 SD350 350 kW · Generator ×2
2 projects · most recent 06/17/2026
Sprinkler System
FiledStatusContractorScope
06/17/2026Permit IssuedCMP PIPING INCSprinkler System
04/08/2026Signed-offSTAT FIRE SPRINKLER NYC CSprinkler System
2 projects · most recent 06/17/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
06/17/2026Permit IssuedCM PLUMBING INCWater/Sanitary
04/08/2026Permit IssuedDEMAR MECHANICAL INCGas, Storm, Water/Sanitary
17 projects · most recent 07/21/2026
General Wiring Lighting
FiledStatusContractorScope
07/21/2026Permit IssuedNOVA ELECTRIC LLCGeneral Wiring, Lighting
06/09/2026CompleteDELCO ELECTRICAL CORP.3 meters, 3 new_meters
11/14/2025Permit IssuedLND ELECTRIC LLCGeneral Wiring
10/09/2024Permit IssuedAGIR ELEC'L LTD. D/B/AGeneral Wiring
09/28/2023CompleteAGIR ELEC'L LTD. D/B/A—
07/18/2023CompleteAGIR ELEC'L LTD. D/B/A—
07/18/2023Permit IssuedAGIR ELEC'L LTD. D/B/A—
05/04/2023CompleteNASH ELECTRIC SERVICES IN—
05/02/2023CancelledDELCO ELECTRICAL CORP.3 meters, 3 new_meters
04/25/2023CompleteNASH ELECTRIC SERVICES IN—
02/10/2023CompleteDELCO ELECTRICAL CORP.—
02/10/2022CompleteILLUMINOUS ELECTRIC CORP.General Wiring
06/22/2021Permit IssuedILLUMINOUS ELECTRIC CORP.—
06/22/2021CompleteILLUMINOUS ELECTRIC CORP.—
06/22/2021CompleteILLUMINOUS ELECTRIC CORP.—
1 project · most recent 04/08/2026
Steel Concrete
FiledStatusContractorScope
04/08/2026Permit IssuedTRITON CONSTRUCTION CO.,Steel, Concrete
1 project · most recent 04/08/2026
Dewatering Earthwork
FiledStatusContractorScope
04/08/2026Permit IssuedTRITON CONSTRUCTION CO.,Dewatering, Earthwork
▾Field Inspections (DOB CAP) — 36
DateTypeResultReport
08/12/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/03/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/02/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/24/2026Pass-Final PL - UndergroundPassView ↗
03/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/12/2026Pass-Final PL - UndergroundPassView ↗
03/06/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/04/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/01/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/24/2025Fail-Final CND-Occupancy InspectionFailView ↗
07/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/27/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/18/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
Latest 25 of 36.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/11/2026Post-installed AnchorsKEVIN SNEDEKERspecial
06/11/2026HVAC-R and service water piping design and insulationKEVIN SNEDEKERenergy_progress
06/11/2026HVAC-R and service water heating system controlsKEVIN SNEDEKERenergy_progress
06/11/2026HVAC-R and service water heating equipmentKEVIN SNEDEKERenergy_progress
06/11/2026Maintenance informationKEVIN SNEDEKERenergy_progress
06/05/2026Maintenance informationKEVIN SNEDEKERenergy_progress
06/05/2026HVAC-R and service water piping design and insulationKEVIN SNEDEKERenergy_progress
06/05/2026HVAC-R and service water heating equipmentKEVIN SNEDEKERenergy_progress
06/05/2026HVAC-R and service water heating system controlsKEVIN SNEDEKERenergy_progress
06/01/2026Post-installed AnchorsKEVIN SNEDEKERspecial
06/01/2026Energy Code Compliance InspectionsKEVIN SNEDEKERprogress
06/01/2026Fire-Resistant Penetrations and JointsKEVIN SNEDEKERspecial
06/01/2026Heating SystemsKEVIN SNEDEKERspecial
06/01/2026Fire-Resistant Penetrations and JointsKEVIN SNEDEKERspecial
05/01/2026Fenestration areasSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/01/2026VestibulesSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/01/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
05/01/2026Fire-Resistance Rated ConstructionSEBASTIAN SETTEDUCATE JR., P.Eprogress
05/01/2026Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
05/01/2026Air barrier continuity plan testingSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/01/2026Insulation placement and R valuesSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/01/2026Protection of exposed foundation insulationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/01/2026Fenestration and door U-factor and product ratingsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/01/2026Fenestration air leakageSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/01/2026Air barrier - visual inspectionSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
Latest 25 of 150.
▾Documents — 498 on file (BIS + DOB NOW)
▸Plans & Drawings74
▸DOB NOWPlans/Sketch73
09/03/2026M00509018-I1Request digital key ↗
09/03/2026M00509252-I1Request digital key ↗
09/03/2026M00547955-I1Request digital key ↗
Showing 3 of 73 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00249921-I1Request digital key ↗
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION30
12/26/2025103757249Open ↗
12/26/2025100866555Open ↗
12/26/2025100509013Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION14
09/10/2021123906915Open ↗
09/10/2021123906915Open ↗
09/10/2021123906915Open ↗
Showing 3 of 14 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
05/25/2022141019190Open ↗
▸Zoning, Tax Lot & Property Records21
▸DOB NOWZD1: DOB Zoning Diagram7
08/23/2026M00723903-I1Open ↗
08/23/2026M00723903-C7Open ↗
08/23/2026M00723903-C1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/23/2026M00723903-I1Open ↗
08/23/2026M00723903-C7Open ↗
08/23/2026M00723903-C1Open ↗
Showing 3 of 7 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
03/14/2025121254141Open ↗
03/17/2023141019190Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
09/10/2021123906915Open ↗
08/26/2021123906906Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/14/2025121254141Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/14/2025121254141Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications176
▸DOB NOWDPL-1: Design Professional Seal & Signature74
09/05/2026M00249921-I1Open ↗
09/03/2026M00509252-I1Open ↗
09/03/2026M00547955-I1Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature45
09/03/2026M00723903-B2Open ↗
09/03/2026M00723903-B2Open ↗
09/01/2026M00723903-I1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWProgress Inspector Seal & Signature39
09/03/2026M00723903-B2Open ↗
09/03/2026M00723903-B2Open ↗
09/03/2026M00723903-B2Open ↗
Showing 3 of 39 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
09/10/2021123906915Open ↗
08/26/2021123906899Open ↗
08/26/2021123906906Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/25/2022141019190Open ↗
08/31/2016140543295Open ↗
08/03/2016140530593Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/07/2019123888070Open ↗
08/31/2016140543295Open ↗
08/03/2016140530593Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/31/2016140543295Open ↗
08/03/2016140530593Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/25/2022141019190Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/07/2019123888070Open ↗
▸Trade Schedules & Equipment15
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/23/2026M00723903-C1Open ↗
08/23/2026M00723903-B8Open ↗
08/23/2026M00723903-B3Open ↗
Showing 3 of 6 on file for this type
▸BISELECTRIC CUT-OFF3
09/10/2021123906915Open ↗
08/26/2021123906899Open ↗
08/26/2021123906906Open ↗
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)3
09/10/2021123906915Open ↗
09/10/2021123906915Open ↗
08/26/2021123906899Open ↗
▸BISSCHEDULE B - PLUMBING2
08/03/2016140530593Open ↗
07/24/2013121711219Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/23/2026M00723903-I1—
▸Safety & Tenant Protection31
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE9
09/10/2021123906915Open ↗
09/10/2021123906915Open ↗
09/10/2021123906915Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWStreet Tree Checklist7
08/23/2026M00723903-I1Open ↗
08/23/2026M00723903-C7Open ↗
08/23/2026M00723903-C1Open ↗
Showing 3 of 7 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST3
09/10/2021123906915Open ↗
08/26/2021123906899Open ↗
08/26/2021123906906Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
09/10/2021123906915Open ↗
08/26/2021123906899Open ↗
08/26/2021123906906Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES3
08/31/2016140543295Open ↗
08/03/2016140530593Open ↗
11/07/2019123888070Open ↗
▸BISSTREET TREE CHECKLIST2
04/08/2024141019190Open ↗
02/08/2024141019190Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/01/2024141019190Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/25/2022141019190Open ↗
▸DOB NOWTenant Protection Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
09/10/2021123906915Open ↗
08/26/2021123906906Open ↗
08/26/2021123906899Open ↗
Showing 3 of 7 on file for this type
▸BISRODENT CONTROL3
09/10/2021123906915Open ↗
08/26/2021123906899Open ↗
08/26/2021123906906Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/05/2026M00249921-I1Open ↗
09/03/2026M00509252-I1Open ↗
Showing 2 of 3 on file for this type
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/07/2019123888070Open ↗
11/01/2016140543295Open ↗
10/18/2016140530593Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
11/01/2016140543295Open ↗
11/01/2016140543295Open ↗
10/18/2016140530593Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/31/2016140543295Open ↗
08/03/2016140530593Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/31/2016140543295Open ↗
08/03/2016140530593Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports12
▸DOB NOWSOIL REPORT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/31/2016140543295Open ↗
08/03/2016140530593Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs18
▸BISLETTERS - SUPPORTING DOCUMENTATION8
09/10/2021123906915Open ↗
09/10/2021123906915Open ↗
09/10/2021123906915Open ↗
Showing 3 of 8 on file for this type
▸BISLANDMARKS APPROVAL4
09/10/2021123906915Open ↗
08/26/2021123906899Open ↗
08/26/2021123906899Open ↗
Showing 3 of 4 on file for this type
▸BISHOUSE CONNECTION SIGNOFF3
08/26/2021123906899Open ↗
08/26/2021123906906Open ↗
08/26/2021123906906Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/01/2016140543295Open ↗
10/18/2016140530593Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/24/2013121711219Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT6
11/07/2019123888070Open ↗
11/01/2016140543295Open ↗
10/18/2016140530593Open ↗
Showing 3 of 6 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)5
09/10/2021123906915Open ↗
09/10/2021123906915Open ↗
08/26/2021123906899Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
09/10/2021123906915Open ↗
08/26/2021123906906Open ↗
08/26/2021123906899Open ↗
▸Filing & Intake Forms24
▸BISBOROUGH INTAKE FORM8
08/26/2021123906899Open ↗
08/26/2021123906906Open ↗
08/19/2021123906906Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET8
08/19/2021123906906Open ↗
08/19/2021123906899Open ↗
08/19/2021123906915Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION5
11/04/2024141019190Open ↗
04/08/2024141019190Open ↗
03/17/2023141019190Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
05/25/2022141019190Open ↗
08/31/2016140543295Open ↗
08/03/2016140530593Open ↗
▸Other Documents44
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
12/26/2025103757249Open ↗
12/26/2025100866555Open ↗
12/26/2025100509013Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSite Survey: Initial7
08/23/2026M00723903-C7Open ↗
08/23/2026M00723903-C1Open ↗
08/23/2026M00723903-B8Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/23/2026M00723903-C7Open ↗
08/23/2026M00723903-C1Open ↗
08/23/2026M00723903-B8Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
08/23/2026M00723903-C7Open ↗
08/23/2026M00723903-C1Open ↗
08/23/2026M00723903-B8Open ↗
Showing 3 of 7 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION3
09/10/2021123906915Open ↗
08/26/2021123906899Open ↗
08/26/2021123906906Open ↗
▸DOB NOWManufacturer's Specifications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWCalculations3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
03/14/2025121254141Open ↗
▸BISTREE REMOVAL: OUTSIDE PROP./PARKS APPR1
04/08/2024141019190Open ↗