Condo, residential tower (mixed-use, multi-family elevator) [derived]
Monarch
200 EAST 89TH STREET · BIN 1073221
💬 Discuss this project
1987Year Built
45Stories
RMBuilding Class
C1-9Zoning
221,576 sfGross Floor Area
255Units
LL97 CoveredRent Stabilized10 Active Violations 9 unresolved · 1 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Monarch Condo BD/MGRS · 13,191 sf lot · 16.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsMonarch CondominiumUnder Construction1 filing
RoofMonarchcondominiumUnder Construction9p · 5 filings · 20 docs
BulkheadMonarchcondominium2p · 1 filing · 14 docs
Floor 44Unit 44A, Unit 44B, Unit 45BCUnder Construction6p · 3 filings · 17 docs
Floor 43
Floor 42
Floor 41Unit 41C, Unit 41D2 filings · 7 docs
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35Unit 35C, Unit 35ABUnder Construction1p · 2 filings · 16 docs
Floor 34Unit 34BUnder Construction1 filing · 16 docs
Floor 33
Floor 32
Floor 31
Floor 30Unit 30BUnder Construction6p · 1 filing · 6 docs
Floor 29Unit 29AB1 filing · 14 docs
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20Unit 20B, Unit 20C, Unit 20BC1 filing · 2 docs
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4Jerrick Associates, INC.1 filing · 3 docs
Floor 3Digby Management5p · 4 filings · 20 docs
Floor 2Digby Management4p · 4 filings · 20 docs
Floor 1Dunkin' / Baskin-Robbins12p · 5 filings · 20 docs
MezzanineMonarchcondominium4p · 1 filing · 20 docs
CellarDigby Management7p · 3 filings · 20 docs
Sub-CellarMonarchcondominium1p · 1 filing · 20 docs
Site & exteriorJerrick Associates, INC.Under Construction6 filings · 14 docs
Filed — no permit issued1280 Garage Manager, LLC1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Monarch Condominium4603/21/2026
Jerrick Associates2007/08/2026
J 49 Ave1207/08/2026
1280 Garage Manager607/08/2026
Lasala Manag Inc the Monarch503/21/2026
Depm403/22/2026
Maramar103/21/2026
Archer Property103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LMS-Ace Services303/21/2026
Restructure Engineering403/21/2026
AE Design Solution1203/21/2026
Boutiqkey603/21/2026
EDG103/21/2026
G Design Drafting803/21/2026
Cherico King Architect P203/21/2026
W J Professional Expediting Company203/21/2026
KC Expediting403/21/2026
John Stacom Architectural Design103/21/2026
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Xinos ConstructionGeneral Contractor1507/08/2026
Jerrick AssociatesScaffold907/08/2026
Xinos ConstructionScaffold409/15/2026
Practical Plumbing & HeatingPlumbing203/22/2026
Jerrick AssociatesGeneral Contractor203/21/2026
Pennell ConstructionGeneral Contractor208/30/2026
Taconic BuildersGeneral Contractor207/08/2026
Golden InteriorsGeneral Contractor107/08/2026
Hod Piping & HeatingPlumbing107/08/2026
JFZ ConstructionGeneral Contractor107/08/2026
Innovation PlumbingPlumbing107/08/2026
Samfriends Development & ConstructionGeneral Contractor107/08/2026
Amato VincentElectrical103/21/2026
The Turbochyll CompanyGeneral Contractor107/08/2026
AL-Lectric Elect'l ContractingElectrical103/21/2026
All Ways Electric Corp.wElectrical103/21/2026
Amor ElectricElectrical103/21/2026
A Plus PlumbingPlumbing108/16/2026
A Real Good PlumberPlumbing107/08/2026
Donato PlumbingPlumbing107/08/2026
Go Pro Plumbing and HeatingPlumbing107/08/2026
Vma ElectricalElectrical103/21/2026
A Real Good Plumberspecialty_contractor107/08/2026
Division One ContractingGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Queens Engineering8898107/27/2026
Lombardo Prof Engineering8566206/29/2026
BHK Engineering9589103/27/2026
Napach Architectu2945303/27/2026
Quality Testing7344301/12/2026
World Design Architecture9323101/07/2026
Special Testing & Consulting1688112/04/2025
Tan Engineering1291111/18/2025
Cole Technologies/Control1290303/11/2025
Cherico King Architect5674102/17/2025
EDG2578502/07/2025
XC Engineering6692412/20/2022
Leo Y Lee Associates2481103/02/2022
JMV Consulting Engineering804104/20/2021
Building Lifecycle
All (230)Filed (42)Permit Issued (37)Signed Off (13)Facade (FISP) (20)Violation (60)Inspection (6)Objection (22)Special Inspection (30)
10/13/2026
Objection raised — Other
10/13/2026
Objection raised — Scope
10/13/2026
Objection raised — Other
10/08/2026
Filed — Alteration
Plumbing fixture modifications at Apt 20BC.
M01399346-I1
09/14/2026
Permit issued — Sidewalk Shed
M01370207-I1-SH
08/27/2026
Permit issued — Mechanical Systems
M01354356-S1-MS
08/14/2026
Permit issued — Plumbing
M01354356-S2-PL
08/13/2026
Permit issued — General Construction
M01354356-I1-GC
07/28/2026
Permit issued — Supported Scaffold
M01431889-I1-SF
07/27/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01431889-I1
07/23/2026
Special inspection requirement — Post-installed Anchors
Michael Lombardo
07/23/2026
Special inspection requirement — Post-installed anchors in masonry
Michael Lombardo
07/21/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SHORING AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08032975-I1
07/16/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
07/16/2026
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
07/02/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/29/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01398778-P1
06/29/2026
Special inspection requirement — Post-installed Anchors
Michael Lombardo
06/29/2026
Special inspection requirement — Post-installed anchors in masonry
Michael Lombardo
06/17/2026
Permit issued — General Construction
M01316340-I1-GC
06/16/2026
Permit issued — Sidewalk Shed
M01370207-I1-SH
06/15/2026
Permit issued — Structural
M01316340-S2-ST
06/15/2026
Permit issued — Plumbing
M01316340-S1-PL
06/02/2026
Permit issued — Suspended Scaffold
M01398778-I1-SC
06/01/2026
Objection resolved — Addressed
05/28/2026
Objection raised — Other
05/21/2026
Permit issued — Structural
M01285385-I1-GC-CX
05/14/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01398778-I1
04/17/2026
Objection raised — Scope
04/03/2026
Objection raised — Admin
04/03/2026
Objection resolved — Resolved
04/03/2026
Objection raised — Admin
04/03/2026
Objection resolved — Resolved
04/03/2026
Objection raised — Admin
04/03/2026
Objection resolved — Resolved
03/27/2026
Filed — Alteration
Structural work for apartment renovation including infill spiral stair and new stair opening at roof level and new solarium roof structure.
M01354356-S3
03/23/2026
Filed — Alteration
Structural work for apartment renovation including infill spiral stair and new stair opening at roof level and new solarium roof structure.
M01354356-S1
03/23/2026
Filed — Alteration
Structural work for apartment renovation including infill spiral stair and new stair opening at roof level and new solarium roof structure.
M01354356-I1
03/23/2026
Filed — Alteration
Structural work for apartment renovation including infill spiral stair and new stair opening at roof level and new solarium roof structure.
M01354356-S2
03/16/2026
Permit issued — Sidewalk Shed
M01370207-I1-SH
03/13/2026
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01370207-I1
02/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2026
Permit issued — Plumbing
M01329259-S1-PL
02/02/2026
Permit issued — General Construction
M01329259-I1-GC
02/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
David Black
02/02/2026
Special inspection requirement — Final
David Black
02/02/2026
Special inspection requirement — Final
David Black
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOEL NAPACH
02/02/2026
Special inspection requirement — Mechanical Systems
JOEL NAPACH
01/12/2026
Filed — Alteration
GENERAL CONSTRUCTION ARCHITECTURAL FOR THE RENOVATION OF EXISTING DUPLEX APARTMENT 34B/35AB ON THE 34 & 35 FLOORS. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M01316340-S2
01/08/2026
Special inspection requirement — Structural Steel - Welding
KEVIN SNEDEKER
01/08/2026
Special inspection requirement — Structural Steel - High Strength Bolting
KEVIN SNEDEKER
01/08/2026
Special inspection requirement — Structural Steel - Details
KEVIN SNEDEKER
01/08/2026
Special inspection requirement — Structural Cold-Formed Steel
KEVIN SNEDEKER
01/07/2026
Filed — Alteration
FILING FOR PLUMBING WORK AS PER PLANS
M01329259-S1
01/07/2026
Filed — Alteration
FILING FOR PLUMBING WORK AS PER PLANS
M01329259-I1
12/23/2025
Objection resolved — Addressed
12/23/2025
Objection resolved — Addressed
12/12/2025
Objection raised — Other
12/12/2025
Objection raised — Other
Latest 60 of 230 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedXinos Construction09/14/2026
DOB NOWMechanical SystemsPermit IssuedPennell Construction08/27/2026
DOB NOWPlumbingPermit IssuedA Plus Plumbing08/14/2026
DOB NOWGeneral ConstructionPermit IssuedPennell Construction08/13/2026
DOB NOWSupported ScaffoldPermit IssuedXinos Construction07/28/2026
DOB NOWGeneral ConstructionPermit IssuedTaconic Builders06/17/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction06/16/2026
DOB NOWStructuralPermit IssuedTaconic Builders06/15/2026
DOB NOWPlumbingPermit IssuedDonato Plumbing06/15/2026
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction06/02/2026
DOB NOWStructuralPermit IssuedXinos Construction05/21/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction03/16/2026
DOB NOWPlumbingPermit IssuedHod Piping & Heating02/10/2026
DOB NOWGeneral ConstructionPermit IssuedDivision One Contracting02/02/2026
DOB NOWSuspended ScaffoldPermit IssuedJepol Construction10/07/2025
DOB NOWGeneral ConstructionPermit IssuedJFZ Construction04/09/2025
DOB NOWStructuralSigned-offXinos Construction03/06/2025
DOB NOWStructuralSigned-offXinos Construction12/27/2024
DOB NOWGeneral ConstructionSigned-offXinos Construction07/26/2024
DOB NOWGeneral ConstructionSigned-offXinos Construction07/24/2024
DOB NOWStructuralSigned-offXinos Construction02/20/2024
DOB NOWStructuralSigned-offXinos Construction01/05/2024
DOB NOWSidewalk ShedSigned-offGE 2A Construction11/28/2023
DOB NOWGeneral ConstructionSigned-offRafi Raza07/13/2023
DOB NOWSupported ScaffoldSigned-offGE 2A Construction05/18/2023
DOB NOWStructuralSigned-offXinos Construction02/07/2023
DOB NOWSidewalk ShedSigned-offGE 2A Construction12/03/2022
DOB NOWGeneral ConstructionSigned-offGE 2A Construction08/08/2022
DOB NOWGeneral ConstructionSigned-offSamfriends Development & Construction08/05/2022
DOB NOWPlumbingSigned-offInnovation Plumbing08/03/2022
DOB NOWSupported ScaffoldSigned-offGE 2A Construction05/24/2022
DOB NOWSidewalk ShedSigned-offGE 2A Construction12/04/2021
DOB NOWMechanical SystemsSigned-offThe Turbochyll Company08/18/2021
DOB NOWGeneral ConstructionSigned-offA Real Good Plumber06/24/2021
DOB NOWPlumbingSigned-offA Real Good Plumber06/24/2021
DOB NOWPlumbingSigned-offGo Pro Plumbing and Heating07/22/2020
DOB NOWSidewalk ShedSigned-offGE 2A Construction08/16/2019
BISOTISSUEDAll City Remodeling07/13/2020
BISOTISSUEDIsen & Djevat Muratovic12/12/2019
BISOTISSUEDGKS Construction01/24/2019
+ 47 more permits on file
1 project · most recent 03/27/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2026Permit IssuedPennell ConstructionHeating and Air Conditioning Systems
Heat / Cool
Islandaire EZRK12lL1Y1S1AL 12,000 BTU · Ptac ×1
EZRK9L1Y1S12AL 9,600 BTU · Ptac ×1
EZRK9L1Y1S16AL 9,600 BTU · Ptac ×1
4 projects · most recent 10/08/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/08/2026——Gas, Water/Sanitary
03/27/2026Permit IssuedA Plus PlumbingGas, Water/Sanitary
01/07/2026Permit IssuedHod Piping & HeatingGas, Water/Sanitary
06/24/2020——Gas, Water/Sanitary
15 projects · most recent 08/28/2026
General Wiring Lighting
FiledStatusContractorScope
08/28/2026Permit IssuedEco Electrical ServcsGeneral Wiring, Lighting
08/26/2026Permit IssuedEco Electrical Servcs—
03/12/2026Permit IssuedTower Electric—
09/30/2025CompleteAmor ElectricGeneral Wiring
06/20/2025CompleteWarren Elevator Service CoGeneral Wiring
05/22/2025Permit IssuedElpo Electrical ContgGeneral Wiring
05/16/2025CompleteJong Hyun Kim—
01/17/2025CompleteKJK ElectricGeneral Wiring
08/20/2024CompleteThomas NotoGeneral Wiring
01/29/2023CompleteFalco Electrical ServicesGeneral Wiring
05/31/2022CompleteAttractive Lighting Electrical—
11/01/2021Permit IssuedRobert Chimenti4 meters, 1 new_meters
05/16/2021Permit IssuedHylan Datacom & Electrical2 meters, 1 new_meters
06/11/2019CompleteEmpire State Ect'l ConGeneral Wiring
05/09/2019CompleteBorowide Elect'l Contractors—
4 projects · most recent 03/27/2026
Steel Concrete
FiledStatusContractorScope
03/27/2026Permit IssuedPennell ConstructionSteel, Concrete
01/12/2026Permit IssuedTaconic BuildersSteel
12/04/2025Permit IssuedXinos ConstructionConcrete
11/29/2023Signed-offXinos Construction4 scope_items
1 project · most recent 07/27/2026
Scaffold
FiledStatusContractorScope
07/27/2026Permit IssuedXinos ConstructionScaffold
1 project · most recent 01/07/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
01/07/2026Permit IssuedHod Piping & HeatingTenant Protection Plan 72 Hour
1 project · most recent 06/29/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/29/2026Permit IssuedXinos ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/02/2026Pass-Final PL - UndergroundPassView ↗
02/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/23/2022Pass-Final General Construction Non-Directive 14PassView ↗
12/05/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/25/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
07/23/2026Post-installed anchors in masonryMichael Lombardospecial
07/23/2026Post-installed AnchorsMichael Lombardospecial
07/16/2026Post-installed AnchorsANDREAS CHRISTOFOROUspecial
07/16/2026Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
06/29/2026Post-installed anchors in masonryMichael Lombardospecial
06/29/2026Post-installed AnchorsMichael Lombardospecial
02/02/2026Mechanical SystemsJOEL NAPACHspecial
02/02/2026Fire-Resistance Rated ConstructionDavid Blackprogress
02/02/2026FinalDavid Blackprogress
02/02/2026Fire-Resistant Penetrations and JointsJOEL NAPACHspecial
02/02/2026FinalDavid Blackprogress
01/08/2026Structural Cold-Formed SteelKEVIN SNEDEKERspecial
01/08/2026Structural Steel - DetailsKEVIN SNEDEKERspecial
01/08/2026Structural Steel - High Strength BoltingKEVIN SNEDEKERspecial
01/08/2026Structural Steel - WeldingKEVIN SNEDEKERspecial
12/04/2025Insulation placement and R valuesRenee Beckenergy_progress
11/17/2025Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
11/11/2025Lighting in dwelling unitsAndrew Herbertenergy_progress
11/11/2025Energy Code Compliance InspectionsAndrew Herbertprogress
11/11/2025Lighting controlsAndrew Herbertenergy_progress
11/11/2025MeteringAndrew Herbertenergy_progress
11/11/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
11/10/2025FinalAndrew Herbertprogress
11/10/2025FinalKEVIN SNEDEKERprogress
09/10/2025Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
Latest 25 of 86.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Dunkin' / Baskin-RobbinsRestaurant / Food ServiceFloor 1
Project M01179506 Alteration · Permit Entire · 02/17/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 498 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch36
09/03/2026M00492950-I1Request digital key ↗
09/03/2026M00622558-I1Request digital key ↗
09/03/2026M00622558-P2Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00349421-I1Request digital key ↗
09/04/2026M00361711-I1Request digital key ↗
09/03/2026M00474313-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/14/2026M00474249-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00164603-I1Request digital key ↗
▸Applications & Permits60
▸BISPLAN / WORK APPROVAL APPLICATION30
10/02/2020140916953Open ↗
09/29/2020140916953Open ↗
07/16/2020140923393Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION29
07/13/2020140916953Open ↗
12/27/2019123433640Open ↗
12/13/2019123433640Open ↗
Showing 3 of 29 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications177
▸DOB NOWSpecial Inspector Seal & Signature50
09/02/2026M01316340-I1Open ↗
09/02/2026M00780340-P1Open ↗
09/01/2026M01030110-P2Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature39
10/13/2026M01399346-I1Open ↗
09/03/2026M00492950-I1Open ↗
09/03/2026M00474249-I1Open ↗
Showing 3 of 39 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
03/12/2020123433640Open ↗
03/12/2020123433640Open ↗
03/09/2020123433640Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/02/2026M01316340-I1Open ↗
09/02/2026M01316340-I1Open ↗
09/02/2026M01316340-I1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
09/19/2018123539046Open ↗
06/25/2018123581187Open ↗
Showing 2 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
07/16/2020140923393Open ↗
06/24/2020140916953Open ↗
09/19/2018123539046Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
07/16/2020140923393Open ↗
06/24/2020140916953Open ↗
12/09/2013140142361Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
07/16/2020140923393Open ↗
06/24/2020140916953Open ↗
12/09/2013140142361Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/24/2020140916953Open ↗
09/27/2019140870537Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
03/01/2019123581187Open ↗
01/08/2019123507240Open ↗
11/26/2018123507240Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
02/25/2014121568936Open ↗
02/10/2014121568936Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
04/09/2013121568936Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/09/2013121568936Open ↗
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes8
10/17/2018123507240Open ↗
09/19/2018123539046Open ↗
08/14/2018123433640Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00349421-I1Open ↗
08/13/2026M00361711-I1Open ↗
▸BISSTREET TREE CHECKLIST1
07/16/2020140923393Open ↗
▸Environmental & Asbestos39
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/03/2026M00492950-I1Open ↗
09/02/2026M00780340-I1Open ↗
09/02/2026M00780340-S1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
07/16/2020140923393Open ↗
06/24/2020140916953Open ↗
09/27/2019140870537Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
10/13/2026M01399346-I1Open ↗
▸Energy Compliance36
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
03/12/2020123433640Open ↗
03/09/2020123433640Open ↗
09/25/2019123507240Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
03/12/2020123433640Open ↗
03/09/2020123433640Open ↗
10/07/2019123507240Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/16/2020140923393Open ↗
06/24/2020140916953Open ↗
09/27/2019140870537Open ↗
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026M00678257-I1Open ↗
08/13/2026M00780340-I1Open ↗
08/13/2026M00492950-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/16/2020140923393Open ↗
06/24/2020140916953Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
12/09/2013140142361Open ↗
▸BISINTERIOR LIGHTING POWER1
07/13/2020140916953Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/13/2020140916953Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/13/2020140916953Open ↗
▸BISLIGHTING CONTROLS1
07/13/2020140916953Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/16/2020140923393Open ↗
06/24/2020140916953Open ↗
10/08/2019140870537Open ↗
Showing 3 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/26/2020140916953Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
07/13/2020140916953Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/07/2019123581187Open ↗
▸Approvals, Objections & Sign-offs34
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
03/12/2020123433640Open ↗
03/05/2020123433640Open ↗
10/04/2019123507240Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
09/03/2026M00622558-P1Open ↗
09/03/2026M00622558-I1Open ↗
09/02/2026M00740670-I1Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/13/2014121452310Open ↗
09/11/2013121452329Open ↗
Showing 2 of 3 on file for this type
▸BISSUPERSEDING LETTER2
01/24/2019123507240Open ↗
01/18/2019123507240Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT27
07/16/2020140923393Open ↗
06/24/2020140916953Open ↗
03/12/2020123433640Open ↗
Showing 3 of 27 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
07/13/2020140916953Open ↗
▸Filing & Intake Forms39
▸BISADDITIONAL INFORMATION12
10/02/2020140916953Open ↗
09/29/2020140916953Open ↗
10/08/2019140870537Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET12
10/17/2018123507240Open ↗
09/19/2018123539046Open ↗
08/14/2018123433640Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM10
07/13/2020140916953Open ↗
03/12/2020123433640Open ↗
03/09/2020123433640Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
07/16/2020140923393Open ↗
06/24/2020140916953Open ↗
09/27/2019140870537Open ↗
Showing 3 of 5 on file for this type
▸Other Documents8
▸BISBPP - SUPPORTING DOCUMENTATION2
12/02/2019140870537Open ↗
11/14/2019140870537Open ↗
▸DOB NOWManufacturer's Specifications2
08/17/2026M01398778-P1Open ↗
08/14/2026M01398778-I1Open ↗
▸DOB NOWCalculations2
08/17/2026M01398778-P1Open ↗
08/14/2026M01398778-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/05/2016122809997Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01265701-I1Open ↗