Whole building & multi-floor projectsMonarch CondominiumUnder Construction1 filing
ROOF REPLACEMENT AND FACADE, BALCONY, AND BULKHEAD REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
On file for this project
6 documents
RoofMonarchcondominiumUnder Construction9p · 5 filings · 20 docs
ArchitectureEquipmentMechanicalStructuralOther
Issued Permit Scope
Mechanical Systems · Structural
Plumbing work for apartment renovation for apartment 45BC.
On file for this project
17 documents · 1 drawing sheet
INSTALLATION OF PIPE SCAFFOLD AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
4 documents · 1 drawing sheet
POOL ROOM, PLAZA AND MECHANICAL ROOF REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
37 documents · 7 drawing sheets
Latest 3 of 5 filings on this floor.
BulkheadMonarchcondominium2p · 1 filing · 14 docs
ArchitectureStructural
POOL ROOM, PLAZA AND MECHANICAL ROOF REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
37 documents · 2 drawing sheets
Floor 44Unit 44A, Unit 44B, Unit 45BCUnder Construction6p · 3 filings · 17 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Plumbing work for apartment renovation for apartment 45BC.
On file for this project
17 documents · 6 drawing sheets
FILING FOR MINOR PARTITION WORK TO CREATE AN ADDITIONAL BEDROOM IN APT 44B AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
3 documents
Renovation of existing apartment kitchen, bathroom, and master bathroom. Replace existing fixtures on existing roughing. Install new washing machine.
On file for this project
4 documents · 2 drawing sheets
Floor 43
Floor 42
Floor 41Unit 41C, Unit 41D2 filings · 7 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
INTERIOR ALTERATION TO COMBINE UNIT 41 C (FL 41) AND 41 D (DUPLEX - FL 41 & 42), INTO ONE DWELLING UNIT. REMOVAL OF NON-LOAD BEARING PARTITION AND KITCHEN CABINETS AND FIXTURES. NO CHANGES OF USE, EGRESS, OR OCCUPANCY. PLUMBING FILED UNDER M00474313
On file for this project
4 documents
INTERIOR ALTERATION TO COMBINE UNIT 41 C (FL 41) AND 41 D (DUPLEX - FL 41 & 42), INTO ONE DWELLING UNIT. REMOVAL OF EXISTING KITCHEN PLUMBING FROM UNIT 41 D. NO CHANGES OF USE, EGRESS, OR OCCUPANCY. OT FILED UNDER M00474249-I1
On file for this project
3 documents
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35Unit 35C, Unit 35ABUnder Construction1p · 2 filings · 16 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
STRUCTURAL WITH THE RENOVATION OF APARTMENT 34B/35AB ON THE 34 & 35 FLOOR. REPLACE EXISTING STAIR. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
On file for this project
16 documents
PLUMBING WORK TO APARTMENT 35C AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 34Unit 34BUnder Construction1 filing · 16 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
STRUCTURAL WITH THE RENOVATION OF APARTMENT 34B/35AB ON THE 34 & 35 FLOOR. REPLACE EXISTING STAIR. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
On file for this project
16 documents
Floor 33
Floor 32
Floor 31
Floor 30Unit 30BUnder Construction6p · 1 filing · 6 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
FILING TO SHOW INTERIOR RENOVATION OF APARTMENT 30B AS PER PLANS
On file for this project
6 documents · 6 drawing sheets
Floor 29Unit 29AB1 filing · 14 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
MODIFIY EXISTING PLUMBING FIXTURES ON EXIST. ROUGHING, AND INSTALL NEW ONES PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
On file for this project
21 documents
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20Unit 20B, Unit 20C, Unit 20BC1 filing · 2 docs
Structural
Issued Permit Scope
Structural
Plumbing fixture modifications at Apt 20BC.
On file for this project
2 documents · 9 drawing sheets
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4Jerrick Associates, INC.1 filing · 3 docs
EquipmentGeneralStructural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 3Digby Management5p · 4 filings · 20 docs
ArchitectureEquipmentGeneralStructural
Issued Permit Scope
General Construction · Structural · Supported Scaffold
INSTALLATION OF TEMPORARY SHORING AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 1 drawing sheet
PROPOSED GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 3 drawing sheets
POOL ROOM, PLAZA AND MECHANICAL ROOF REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
37 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 2Digby Management4p · 4 filings · 20 docs
ArchitectureEquipmentGeneralStructural
Issued Permit Scope
General Construction · Structural · Supported Scaffold
INSTALLATION OF TEMPORARY SHORING AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 1 drawing sheet
PROPOSED GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 3 drawing sheets
POOL ROOM, PLAZA AND MECHANICAL ROOF REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
37 documents
Latest 3 of 4 filings on this floor.
Floor 1Dunkin' / Baskin-Robbins12p · 5 filings · 20 docs
ArchitectureEquipmentGeneralStructural
Issued Permit Scope
General Construction · Structural · Supported Scaffold
RENOVATION OF AN EXISTING DUNKIN' DONUTS STORE ON 1ST FLOOR OF AN EXISTING BUILDING. REPLACE EXISTING CEILING & FLOOR TILES, LIGHTING FIXTURES, & WALL FINISHES AS NEEDED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY SHORING AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 1 drawing sheet
PROPOSED GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 5 drawing sheets
Latest 3 of 5 filings on this floor.
MezzanineMonarchcondominium4p · 1 filing · 20 docs
Structural
POOL ROOM, PLAZA AND MECHANICAL ROOF REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
37 documents · 4 drawing sheets
CellarDigby Management7p · 3 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Structural
INSTALLATION OF TEMPORARY SHORING AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 2 drawing sheets
PROPOSED GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 3 drawing sheets
POOL ROOM, PLAZA AND MECHANICAL ROOF REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
37 documents · 2 drawing sheets
Sub-CellarMonarchcondominium1p · 1 filing · 20 docs
Structural
POOL ROOM, PLAZA AND MECHANICAL ROOF REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
37 documents · 1 drawing sheet
Site & exteriorJerrick Associates, INC.Under Construction6 filings · 14 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Sidewalk Shed · Structural · Supported Scaffold
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents · 5 drawing sheets
INSTALLATION OF PIPE SCAFFOLD AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
4 documents · 6 drawing sheets
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 12 drawing sheets
Latest 3 of 6 filings on this floor.
Filed — no permit issued1280 Garage Manager, LLC1 filing · 2 docs
Structural
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet