Condo, other/miscellaneous [derived]
Carnegie Park Condominium
200 EAST 94 STREET · Upper East Side-Yorkville · BIN 1048916
💬 Discuss this project
1986Year Built
13Stories
RXBuilding Class
C4-6Zoning
349,653 sfGross Floor Area
281Units
LL97 CoveredRent Stabilized5 Open Violations 2 unresolved · 3 paperwork only ▸FISP: SAFE
Condo, other/miscellaneous [derived] · 45,739 sf lot · 7.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof4p · 3 filings · 14 docs
Floor 301 filing · 7 docs
Floor 29
Floor 283 filings · 17 docs
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 181 filing · 3 docs
Floor 17
Floor 163 filings · 17 docs
Floor 15
Floor 141 filing · 7 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 81p · 1 filing · 9 docs
Floor 71p · 1 filing · 4 docs
Floor 61 filing · 4 docs
Floor 5Under Construction7p · 4 filings · 17 docs
Floor 4
Floor 3
Floor 2
Floor 1
Cellar1 filing · 10 docs
Site & exterior4 filings · 13 docs
Filed — no permit issued1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CARNEGIE PARK ASSOCIATES L P30207/08/2026
CARNEGIE PARK CONDOMINIUM1507/08/2026
RELATED MANAGEMENT COMPANY1503/21/2026
KINGS GROUP NY1209/13/2026
GUARDIAN CONTRACTING AND CONSTRUCTI703/22/2026
CARNEGIE PARK ASSOC C O RELATED603/21/2026
COLGATE ENTERPRISES403/21/2026
C O RELATED MANAGEMENT L P303/21/2026
Charter Communications103/22/2026
FRONTIER HEALTHCARE HOLDINGS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SCARANO ARCHITECT403/21/2026
AE DESIGN SOLUTION203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
COMMERCIAL CAPITAL USA803/21/2026
RELATED COMPANIES1003/21/2026
CJCP CONSULTING SERVICES403/21/2026
RIZZO GROUP103/21/2026
DEZIGNPLUS103/21/2026
XINOS CONSTRUCTION203/21/2026
CONVERSANO ASSOCIATES, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS GROUP NY CORPGeneral Contractor807/08/2026
GUARDIAN CONTRACTING.ANDGeneral Contractor603/21/2026
TRIBUTE RESTORATION INCGeneral Contractor407/08/2026
SYNC CONSTRUCTION LLCGeneral Contractor407/08/2026
TRISTATE SUSTAINABLE LLCGeneral Contractor303/21/2026
GILBANE RESIDENTIAL CONSTGeneral Contractor303/21/2026
JAG PLBG & MECH INCPlumbing307/08/2026
SEA-DAR ENTERPRISES, INCGeneral Contractor303/21/2026
LINKED MECHANICAL LLCGeneral Contractor307/08/2026
PUMPING SOL PLBG & MECH IPlumbing207/11/2026
BERNHARDT RENOVATION INCGeneral Contractor203/21/2026
LINVAL BROWNElectrical203/21/2026
SORTINO JOSEPHElectrical203/21/2026
NICHE WATERPROOFING LLCGeneral Contractor206/28/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
PROTO P & H SERVICES CORPPlumbing107/08/2026
KSW MECHANICAL,LLCGeneral Contractor107/08/2026
ECNY ELEC'L CONTR'S, INCElectrical103/22/2026
LARRY ZASSMANElectrical103/21/2026
MILTON PARASKEVADISElectrical103/21/2026
RICHARD GRIMAElectrical103/21/2026
ROBERT CHIMENTIElectrical103/22/2026
SULLIVAN, JAMESElectrical103/21/2026
TODARO JOSEPHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY RESTORATION TECHNOLOGY6187103/24/2026
INTERNATIONAL GEOTEHCNICA1795111/10/2025
LEO Y LEE ASSOCIATES2481111/14/2024
VINCENT J. LIOTTA P. E.1974110/10/2022
ACE STRUCTURAL ENGINEERIN496208/02/2022
MWB ENGINEERING7942109/16/2021
DOMANI INSPECTION SERVICE843108/17/2021
JAMES SCHAEFER ARCHITECT,3763204/01/2021
SOCOTEC, INC.301103/16/2021
JAREK TRESKO ARCHITECT, L1086101/11/2021
Building Lifecycle
All (212)Filed (33)Permit Issued (35)Signed Off (20)Facade (FISP) (18)Violation (60)Inspection (14)Objection (2)Special Inspection (30)
08/26/2026
Cycle 10 facade report signed — SWARMP
08/25/2026
Permit issued — General Construction
M01304804-I1-GC
08/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/11/2026
Cycle 10 facade report submitted
08/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/21/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/10/2026
Permit issued — Plumbing
M01304804-S1-PL
07/01/2026
Cycle 10 facade inspection completed
06/22/2026
Permit issued — General Construction
M01366982-I1-GC
05/21/2026
Permit issued — Sidewalk Shed
M01366982-S1-SH
05/12/2026
Filed — Alteration
Minor facade repairs as per plans; no change to use, egress, or occupancy.
M01366982-S1
05/12/2026
Permit issued — General Construction
M01366982-I1-GC
03/24/2026
Filed — Alteration
Minor facade repairs as per plans; no change to use, egress, or occupancy.
M01366982-I1
03/13/2026
Permit issued — Suspended Scaffold
M01367534-I1-SC
03/09/2026
Filed — Alteration
Installation of IRA during facade inspection.
M01367534-I1
02/02/2026
Permit issued — General Construction
M01304804-I1-GC
01/29/2026
Permit issued — Plumbing
M01304804-S1-PL
11/10/2025
Filed — Alteration
Proposed modification of existing hall closet to install electric stackable washer and dryer, replacement of bathroom fixtures on existing roughing to accomodate W/D unit. No change to use, occupancy or egress under this application.
M01304804-S1
11/10/2025
Filed — Alteration
Proposed modification of existing hall closet to install electric stackable washer and dryer, replacement of bathroom fixtures on existing roughing to accomodate W/D unit. No change to use, occupancy or egress under this application.
M01304804-I1
10/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
10/19/2025
Special inspection requirement — Final
MICHAEL KARANTINIDIS, P.E.
06/13/2025
Signed off — Alteration
REMOVAL, RELOCATION, AND ADDING PLUMBING FIXTURES
M00572721-I1
06/13/2025
Signed off — Alteration
INSTALL DUCTWORK AND EXHAUST FAN IN NEW BATHROOM
M00591443-I1
06/13/2025
Signed off — Alteration
M00589860-I1
06/09/2025
Signed off — Alteration
PROPOSED MINOR INTERIOR RENOVATION TO INSTALL NEW NON-LOAD BEARING PARTITIONS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00549157-I1
01/15/2025
Violation issued (ECB, open)
Construction
01/15/2025
Violation issued (ECB, open)
Signs
01/15/2025
Violation issued (ECB, open)
Signs
12/04/2024
Permit issued — Suspended Scaffold
M01140393-I1-SC
11/27/2024
Objection raised — Other
11/27/2024
Objection resolved — Addressed
11/14/2024
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01140393-I1
11/11/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
11/11/2024
Special inspection requirement — Post-installed Anchors
Leo Lee
03/11/2024
Signed off — Alteration
combine apartments 1809, 1814, apartment renovation, no change to use, exits or occupancy
M00446740-I1
02/06/2024
Permit issued — Plumbing
M00446740-I1-PL
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/24/2023
Signed off — Alteration
proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2014 building codes, chapter 33. no changes in use, egress or occupancy.
M00275888-I1
07/21/2023
Cycle 9 facade report signed — SAFE
06/21/2023
Signed off — Alteration
PLUMBING WORK FOR AN INTERIOR RENOVATION RELATED TO THE COMBINATION OF EXISTING APARTMENTS 1615/1617 AS PER PLANSFILED HEREWITH.
M00689108-I1
06/15/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/14/2023
Signed off — Alteration
M00689070-I1
06/12/2023
Filed — Alteration
PLUMBING WORK FOR AN INTERIOR RENOVATION RELATED TO THE COMBINATION OF EXISTING APARTMENTS 1615/1617 AS PER PLANSFILED HEREWITH.
M00689108-P1
06/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/14/2023
Signed off — Alteration
PROVIDE NEW ROOF MOUNTED KITCHEN EXHAUST FANS & DUCTWORK. PROVIDE NEW DUCTWORK & REROUTE INTAKE DUCTWORK TO EXISTING MAKEUP AIR UNIT AT ROOF. PROVIDE AIR BALANCING OF EXISTING AC-R-1 MAKEUP AIR SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00545901-I1
02/24/2023
Signed off — Alteration
M00493885-I1
02/17/2023
Cycle 9 facade report submitted
02/14/2023
Violation issued (HPD, open)
B
02/14/2023
Violation issued (HPD, closed)
A
02/14/2023
Violation issued (HPD, closed)
A
02/13/2023
Cycle 9 facade inspection completed
01/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/08/2022
Signed off — Alteration
REPLACMENT OF 40 TON UNIT ON THE ROOFTOP. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00773419-I1
11/03/2022
Signed off — Alteration
Facade repair including deteriorated masonry conditions at the building elevations as indicated on the attached drawings.
M00465758-I1
11/03/2022
Permit issued — Mechanical Systems
M00773419-I1-MS
10/10/2022
Filed — Alteration
REPLACMENT OF 40 TON UNIT ON THE ROOFTOP. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00773419-I1
Latest 60 of 212 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedZICO CONSTRUCTION CORP08/25/2026
DOB NOWPlumbingSigned-offPUMPING SOL PLBG & MECH I07/10/2026
DOB NOWGeneral ConstructionSigned-offNICHE WATERPROOFING LLC06/22/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP05/21/2026
DOB NOWGeneral ConstructionSigned-offNICHE WATERPROOFING LLC05/12/2026
DOB NOWSuspended ScaffoldPermit IssuedJC SANTANA CONTRACTING CO03/13/2026
DOB NOWGeneral ConstructionPermit IssuedCATHEDRA02/02/2026
DOB NOWPlumbingSigned-offGOT PIPES INC01/29/2026
DOB NOWSuspended ScaffoldPermit IssuedCITILINE RESTORATION LLC12/04/2024
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I02/06/2024
DOB NOWMechanical SystemsPermit IssuedKSW MECHANICAL,LLC11/03/2022
DOB NOWGeneral ConstructionSigned-offTRIBUTE RESTORATION INC09/26/2022
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC09/08/2022
DOB NOWGeneral ConstructionSigned-offGILBANE RESIDENTIAL CONST09/01/2022
DOB NOWMechanical SystemsSigned-offLINKED MECHANICAL06/01/2022
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP03/25/2022
DOB NOWPlumbingSigned-offPROTO P & H SERVICES CORP10/14/2021
DOB NOWMechanical SystemsSigned-offSYNC CONSTRUCTION LLC10/14/2021
DOB NOWGeneral ConstructionSigned-offSYNC CONSTRUCTION LLC10/08/2021
DOB NOWGeneral ConstructionSigned-offTRIBUTE RESTORATION INC09/30/2021
DOB NOWPlumbingSigned-offJAG PLUMBING & MECHANICAL09/03/2021
DOB NOWMechanical SystemsSigned-offLINKED MECHANICAL08/30/2021
DOB NOWGeneral ConstructionSigned-offSEA-DAR ENTERPRISES, INC08/24/2021
DOB NOWGeneral ConstructionSigned-offTRIBUTE RESTORATION INC07/13/2021
DOB NOWPlumbingSigned-offCOCHRANE PLBG & HTG04/07/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP03/31/2021
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC03/26/2021
DOB NOWGeneral ConstructionSigned-offBERNHARDT RENOVATION03/25/2021
DOB NOWGeneral ConstructionSigned-offTRISTATE SUSTAINABLE LLC03/01/2021
DOB NOWPlumbingSigned-offJAG PLBG & MECH INC10/15/2020
DOB NOWSidewalk ShedSigned-offGUARDIAN CONTRACT CONSTRU02/12/2020
DOB NOWPlumbingSigned-offJAG PLBG & MECH INC01/23/2020
DOB NOWSidewalk ShedSigned-offGUARDIAN CONTRACT CONSTRU12/05/2019
DOB NOWPlumbingSigned-offJAG PLBG & MECH INC11/14/2019
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP03/22/2019
BISOTISSUEDBRADY CONSTRUCTION INC01/11/2022
BISOTISSUEDL & N CONSTRUCTION INTERI03/12/2021
BISOTISSUEDBRADY CONSTRUCTION INC01/12/2021
BISOTISSUEDBRADY CONSTRUCTION INC07/28/2020
BISOTISSUEDBRADY CONSTRUCTION INC07/08/2020
+ 45 more permits on file
25 projects · most recent 06/22/2026
General Wiring
FiledStatusContractorScope
06/22/2026Permit IssuedWISE ELECTRICAL SVCS INCGeneral Wiring
03/27/2026Permit IssuedHIGH QUALITY ELECTRIC OF—
01/07/2026CancelledP.S. MARCATO ELEV. CO INC—
12/23/2024CompleteACCURATE ELEC'L CORP.—
12/09/2024Permit IssuedP.S. MARCATO ELEV. CO INC—
02/08/2024Permit IssuedPM ELEC'L MAINTENANCE INCGeneral Wiring
01/30/2024Permit IssuedPM ELEC'L MAINTENANCE INCGeneral Wiring
01/02/2024CompleteKET ELECTRIC LLCGeneral Wiring
10/16/2023Permit IssuedPM ELEC'L MAINTENANCE INCGeneral Wiring
03/21/2023CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
03/21/2023CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
03/21/2023CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
03/21/2023CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
11/30/2022CompleteENTERPRISE ELEC'L SYSTEMS—
09/08/2022Permit IssuedRX ELECTRIC INCGeneral Wiring
1 project · most recent 05/12/2026
Sidewalk Shed
FiledStatusContractorScope
05/12/2026Signed-offNICHE WATERPROOFING LLCSidewalk Shed
1 project · most recent 11/10/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
11/10/2025Permit IssuedZICO CONSTRUCTION CORPTenant Protection Plan 72 Hour
2 projects · most recent 03/09/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/09/2026Permit IssuedJC SANTANA CONTRACTING CO—
11/14/2024Permit IssuedCITILINE RESTORATION LLCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
08/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/31/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/21/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/27/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/24/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
10/19/2025Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
10/19/2025FinalMICHAEL KARANTINIDIS, P.E.progress
11/11/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
11/11/2024Post-installed AnchorsLeo Leespecial
08/03/2022Energy Code Compliance InspectionsFLORINELA MURESANprogress
08/03/2022Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
07/12/2022Mechanical SystemsVincent Liottaspecial
07/12/2022FinalVincent Liottaprogress
07/11/2022Energy Code Compliance InspectionsFLORINELA MURESANprogress
07/11/2022Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
02/28/2022FinalANTHONY MRKICprogress
09/16/2021Post-installed AnchorsFLORINELA MURESANspecial
09/10/2021Mechanical SystemsFLORINELA MURESANspecial
09/10/2021FinalFLORINELA MURESANprogress
09/01/2021FinalGregory Shunickprogress
06/29/2021FinalPeter Chiangprogress
06/23/2021Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/23/2021Mechanical SystemsJOHN MCMONAGLEspecial
06/23/2021Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
06/23/2021FinalJOHN MCMONAGLEprogress
04/02/2021FinalJAMES SCHAEFERprogress
04/02/2021Fire-Resistant Penetrations and JointsJAMES SCHAEFERspecial
04/02/2021Interior lighting powerJAMES SCHAEFERenergy_progress
04/02/2021Lighting controlsJAMES SCHAEFERenergy_progress
04/02/2021Lighting in dwelling unitsJAMES SCHAEFERenergy_progress
Latest 25 of 31.
▾Documents — 2,083 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch19
09/03/2026M00493885-I1Request digital key ↗
09/03/2026M00549157-I1Request digital key ↗
09/03/2026M00545901-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Plumbing8
09/05/2026M00292681-I1Request digital key ↗
09/04/2026M00255383-I1Request digital key ↗
09/04/2026M00411119-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
09/04/2026M00446688-I1Request digital key ↗
09/04/2026M00465758-I1Request digital key ↗
09/03/2026M00457552-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00144026-I1Request digital key ↗
09/05/2026M00275888-I1Request digital key ↗
▸Applications & Permits392
▸BISPLAN / WORK APPROVAL APPLICATION231
05/16/2025140101752Open ↗
03/19/2025120334423Open ↗
07/16/2024140986342Open ↗
Showing 3 of 231 on file for this type
▸BISWORK PERMIT APPLICATION161
03/12/2021140986342Open ↗
09/18/2019140868871Open ↗
09/18/2019140863803Open ↗
Showing 3 of 161 on file for this type
▸Seals & Professional Certifications452
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION145
04/12/2019123861570Open ↗
04/03/2019121732189Open ↗
01/18/2019121730724Open ↗
Showing 3 of 145 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT66
09/18/2019140868871Open ↗
09/18/2019140863803Open ↗
06/24/2019140855705Open ↗
Showing 3 of 66 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION61
09/18/2019140868871Open ↗
09/18/2019140863803Open ↗
06/24/2019140855705Open ↗
Showing 3 of 61 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY60
09/18/2019140868871Open ↗
09/18/2019140863803Open ↗
06/24/2019140855705Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/05/2026M00144026-I1Open ↗
09/05/2026M00292681-I1Open ↗
09/04/2026M00255383-I1Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST30
04/12/2019123861570Open ↗
Showing 1 of 30 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026M00689070-I1Open ↗
08/31/2026M00545901-I1Open ↗
08/31/2026M00545901-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026M01140393-I1Open ↗
09/01/2026M01140393-I1Open ↗
08/31/2026M00545901-I1Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE6
01/04/2021140986342Open ↗
Showing 1 of 6 on file for this type
▸Trade Schedules & Equipment182
▸BISSELF-CERT PLUMBING NOTICE80
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 80 on file for this type
▸BISSCHEDULE B - PLUMBING38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISEQUIPMENT USE PERMITS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA9
08/14/2020122551951Open ↗
Showing 1 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection21
▸BISTENANT PROTECTION PLAN AND NOTES13
09/18/2019140868871Open ↗
09/18/2019140863803Open ↗
06/24/2019140855705Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWTenant Protection Plan6
09/05/2026M00292681-I1Open ↗
09/04/2026M00411119-I1Open ↗
08/13/2026M00292681-P1Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
01/04/2021140986342Open ↗
▸Environmental & Asbestos134
▸BISASBESTOS: CERTIFICATION (DEP ACP5)82
01/04/2021140986342Open ↗
04/12/2019123861570Open ↗
04/12/2019123863809Open ↗
Showing 3 of 82 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
09/05/2026M00292681-I1Open ↗
09/04/2026M00255383-P1Open ↗
09/04/2026M00255383-I1Open ↗
Showing 3 of 20 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)4
09/18/2019140868871Open ↗
09/18/2019140863803Open ↗
Showing 2 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
09/18/2019140868871Open ↗
09/18/2019140863803Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M00591443-I1Open ↗
08/13/2026M00457624-I1Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance175
▸BISAS-BUILT ENERGY ANALYSIS62
10/26/2018121779405Open ↗
10/25/2018121831795Open ↗
07/18/2018123146130Open ↗
Showing 3 of 62 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS59
09/18/2019140868871Open ↗
09/18/2019140863803Open ↗
Showing 2 of 59 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS27
04/12/2019123861570Open ↗
10/26/2018121779405Open ↗
10/25/2018121831795Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY14
01/04/2021140986342Open ↗
Showing 1 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
03/19/2024140986342Open ↗
11/18/2020140863803Open ↗
06/24/2020140868871Open ↗
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00457552-I1Open ↗
08/13/2026M00589860-I1Open ↗
08/13/2026M00446688-I1Open ↗
▸BISLIGHTING IN DWELLING UNITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports84
▸BISTECHNICAL REPORT: RESPONSIBILITY80
03/19/2024140986342Open ↗
01/04/2021140986342Open ↗
01/04/2021140986342Open ↗
Showing 3 of 80 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Approvals, Objections & Sign-offs187
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST130
03/20/2025120334423Open ↗
07/17/2024140986342Open ↗
01/05/2023140855705Open ↗
Showing 3 of 130 on file for this type
▸BISADMINISTRATIVE OBJECTIONS27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
04/01/2021123740773Open ↗
04/01/2021123740773Open ↗
04/01/2021123740773Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
07/22/2022120862726Open ↗
07/08/2022120862726Open ↗
06/07/2022120862726Open ↗
Showing 3 of 10 on file for this type
▸BISFINAL4
03/19/2025120334423Open ↗
03/19/2025120334423Open ↗
03/19/2024140986342Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership208
▸BISCOST AFFIDAVIT201
01/04/2021140986342Open ↗
08/26/2020122551951Open ↗
06/24/2020140868871Open ↗
Showing 3 of 201 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
03/19/2025120334423Open ↗
03/19/2024140986342Open ↗
01/05/2023140855705Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms200
▸BISEFILING JOB APPLICATION COVER SHEET69
01/04/2021140986342Open ↗
09/18/2019140868871Open ↗
09/18/2019140863803Open ↗
Showing 3 of 69 on file for this type
▸BISEFILING COVER SHEET50
04/01/2021123740773Open ↗
04/01/2021123740773Open ↗
04/12/2019123861570Open ↗
Showing 3 of 50 on file for this type
▸BISADDITIONAL INFORMATION48
05/24/2021140986342Open ↗
03/24/2021140986342Open ↗
03/24/2021140986342Open ↗
Showing 3 of 48 on file for this type
▸BISBOROUGH INTAKE FORM33
03/06/2020120862726Open ↗
01/21/2020140863803Open ↗
12/10/2019120862726Open ↗
Showing 3 of 33 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
04/13/2021123740773Open ↗
Showing 1 of 5 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01140393-I1Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01367534-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01140393-I1Open ↗