200 MESEROLE STREET
BROOKLYN · BIN 3327951
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6Zoning
3,250 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · Owner of record: 200 MESEROLE STREET LLC · 2,500 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 1 filing · 11 docs
Floor 32p · 2 filings · 20 docs
Floor 24p · 2 filings · 20 docs
Floor 16p · 3 filings · 20 docs
Cellar3p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KARSON MANAGEMENT2707/08/2026
200 MESEROLE STREET LLC103/22/2026
ELI LEBRON/OR OWNER OF BL403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/03/2023$1.9M—— → —$569/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUSTAINABLE DESIGN ENGINEERING PLLC208/10/2024
MSM ENGINEERING SERVICES, PLLC307/01/2024
NS ENGINEERS, P.C.806/24/2024
ASHRAF CORP212/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YOUBER DESIGN2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEE CONSTRUCTIONS LLCGeneral Contractor1107/08/2026
MNK ENTERPRISES NY INCGeneral Contractor407/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing307/08/2026
UNIVERSAL MASONRY CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUSTAINABLE DESIGN ENGINE1404208/10/2024
MSM ENGINEERING SERVICES,8449107/01/2024
JAY KAVI CORPORATION8500306/24/2024
NS ENGINEERS, P.C.1442309/30/2023
Building Lifecycle
All (107)Filed (15)Permit Issued (11)Signed Off (10)Violation (11)Inspection (7)Objection (23)Special Inspection (30)
06/27/2025
Signed off — Alteration
B01063657-I1
06/27/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01063659-I1
09/24/2024
Signed off — Alteration
B01063660-I1
09/23/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/26/2024
Signed off — Alteration
GENERAL CONSTRUCTION TO RENOVATE 1ST FLOOR COMMERCIAL SPACE AND CELLAR. WORK WILL INCLUDE DEMO OF NON-LOAD-BEARING PARTITIONS, NEW FURRED-OUT WALLS, NEW PLUMBING FIXTURES, & A NEW STOREFRONT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00970284-I1
08/26/2024
Signed off — Alteration
INSTALL NEW SPLIT UNIT SYSTEM TO THE 1ST FLOOR COMMERCIAL, APT 2F ON THE 2ND, AND APT 3F ON THE 3RD FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00933460-I1
08/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
08/20/2024
Special inspection requirement — Maintenance information
Kenny Mak
08/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
Kenny Mak
08/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
Kenny Mak
08/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Kenny Mak
08/20/2024
Special inspection requirement — Mechanical Systems
Kenny Mak
08/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kenny Mak
08/20/2024
Special inspection requirement — Final
Kayan Tse
08/15/2024
Permit issued — General Construction
B01063660-I1-GC
08/14/2024
Signed off — Alteration
GENERAL CONSTRUCTION TO RENOVATE 1ST FLOOR COMMERCIAL SPACE AND CELLAR. WORK WILL INCLUDE DEMO OF NON-LOAD-BEARING PARTITIONS, NEW FURRED-OUT WALLS, NEW PLUMBING FIXTURES, & A NEW STOREFRONT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00970284-S1
08/10/2024
Filed — Alteration
INSTALL NEW SPLIT UNIT SYSTEM TO THE 1ST FLOOR COMMERCIAL, APT 2F ON THE 2ND, AND APT 3F ON THE 3RD FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00933460-P1
08/09/2024
Signed off — Alteration
RELOCATE PLUMBING FIXTURES WITH NEW (1 WC, 1 LAV, 1 SINK); CAP & REMOVE (1 TUB); AND INSTALL NEW PLUMBING FIXTURES (2 SHOWERS, 1 LAV, 1 WC, 1 DW, 1 W/M) AT APT 2F ON THE 2ND FLOOR.
B00903770-I1
08/09/2024
Permit issued — General Construction
B00933460-I1-GC
08/08/2024
Signed off — Alteration
RELOCATE PLUMBING FIXTURES WITH NEW (1 WC, 1 LAV, 1 SINK); CAP & REMOVE (1 TUB); AND INSTALL NEW PLUMBING FIXTURES (2 SHOWERS, 1 LAV, 1 WC, 1 DW, 1 W/M) AT APT 2F ON THE 2ND FLOOR.
B00903770-S1
07/30/2024
Signed off — Alteration
RELOCATE PLUMBING FIXTURES WITH NEW (1 WC, 1 LAV, 1 SINK); CAP & REMOVE (1 TUB); INSTALL NEW PLUMBING (1 WC, 1 LAV, 1 DW, 2 SHOWER, 1 W/M) AT APT 3F ON THE 3RD FL.
B00852047-S1
07/30/2024
Signed off — Alteration
RELOCATE PLUMBING FIXTURES WITH NEW (1 WC, 1 LAV, 1 SINK); CAP & REMOVE (1 TUB); INSTALL NEW PLUMBING (1 WC, 1 LAV, 1 DW, 2 SHOWER, 1 W/M) AT APT 3F ON THE 3RD FL.
B00852047-I1
07/01/2024
Filed — Alteration
B01063660-I1
07/01/2024
Permit issued — Supported Scaffold
B01063659-I1-SF
06/26/2024
Permit issued — General Construction
B00933460-I1-MS
06/25/2024
Filed — Alteration
B01063657-I1
06/25/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01063659-I1
06/25/2024
Permit issued — Sidewalk Shed
B01063657-I1-SH
06/24/2024
Filed — Alteration
RELOCATE PLUMBING FIXTURES WITH NEW (1 WC, 1 LAV, 1 SINK); CAP & REMOVE (1 TUB); AND INSTALL NEW PLUMBING FIXTURES (2 SHOWERS, 1 LAV, 1 WC, 1 DW, 1 W/M) AT APT 2F ON THE 2ND FLOOR.
B00903770-P1
06/24/2024
Filed — Alteration
RELOCATE PLUMBING FIXTURES WITH NEW (1 WC, 1 LAV, 1 SINK); CAP & REMOVE (1 TUB); AND INSTALL NEW PLUMBING FIXTURES (2 SHOWERS, 1 LAV, 1 WC, 1 DW, 1 W/M) AT APT 2F ON THE 2ND FLOOR.
B00903770-P2
06/24/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jay Kavi
06/24/2024
Special inspection requirement — Energy Code Compliance Inspections
Jay Kavi
06/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
06/24/2024
Special inspection requirement — Lighting in dwelling units
Jay Kavi
06/24/2024
Special inspection requirement — Final
Shamsul Siddique
05/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/10/2024
Objection resolved — Addressed
04/10/2024
Objection resolved — Addressed
03/20/2024
Objection resolved — Addressed
03/19/2024
Objection resolved — Addressed
03/08/2024
Objection raised — Admin
03/08/2024
Objection raised — Scope
03/08/2024
Objection raised — Inspections
03/08/2024
Objection raised — Other
03/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/29/2024
Filed — Alteration
INSTALL NEW SPLIT UNIT SYSTEM TO THE 1ST FLOOR COMMERCIAL, APT 2F ON THE 2ND, AND APT 3F ON THE 3RD FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00933460-I1
02/29/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/14/2024
Permit issued — Plumbing
B00970284-S1-PL
02/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jay Kavi
02/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
02/09/2024
Special inspection requirement — Final
Shamsul Siddique
02/09/2024
Special inspection requirement — Lighting in dwelling units
Jay Kavi
02/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Jay Kavi
01/19/2024
Permit issued — General Construction
B00970284-I1-GC
12/20/2023
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE 1ST FLOOR COMMERCIAL SPACE AND CELLAR. WORK WILL INCLUDE DEMO OF NON-LOAD-BEARING PARTITIONS, NEW FURRED-OUT WALLS, NEW PLUMBING FIXTURES, & A NEW STOREFRONT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00970284-S1
12/13/2023
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE 1ST FLOOR COMMERCIAL SPACE AND CELLAR. WORK WILL INCLUDE DEMO OF NON-LOAD-BEARING PARTITIONS, NEW FURRED-OUT WALLS, NEW PLUMBING FIXTURES, & A NEW STOREFRONT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00970284-I1
11/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/02/2023
Objection resolved — Resolved
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offUNIVERSAL MASONRY CORP08/15/2024
DOB NOWGeneral ConstructionSigned-offBEE CONSTRUCTIONS LLC08/09/2024
DOB NOWSupported ScaffoldSigned-offMNK ENTERPRISES NY INC07/01/2024
DOB NOWGeneral ConstructionSigned-offBEE CONSTRUCTIONS LLC06/26/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC06/25/2024
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG02/14/2024
DOB NOWGeneral ConstructionSigned-offBEE CONSTRUCTIONS LLC01/19/2024
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG08/25/2023
DOB NOWGeneral ConstructionSigned-offBEE CONSTRUCTIONS LLC08/09/2023
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG07/28/2023
DOB NOWGeneral ConstructionSigned-offBEE CONSTRUCTIONS LLC06/13/2023
BISOTISSUEDBOLTECH BUILDING SOLUT CP02/04/2009
BISOTISSUEDNAVACO INC09/30/1996
1 project · most recent 10/01/2023
Water/Sanitary
FiledStatusContractorScope
10/01/2023——Water/Sanitary
3 projects · most recent 08/11/2025
General Wiring
FiledStatusContractorScope
08/11/2025CompleteAMOR ELECTRIC CORPGeneral Wiring
06/25/2024CompleteRICHARD NEU—
06/23/2024CancelledAMOR ELECTRIC CORP6 meters
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/23/2024Pass-Final General Construction Non-Directive 14PassView ↗
06/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
08/20/2024Energy Code Compliance InspectionsKenny Makprogress
08/20/2024Maintenance informationKenny Makenergy_progress
08/20/2024HVAC-R and service water heating system controlsKenny Makenergy_progress
08/20/2024HVAC-R and service water heating equipmentKenny Makenergy_progress
08/20/2024HVAC-R and service water piping design and insulationKenny Makenergy_progress
08/20/2024Mechanical SystemsKenny Makspecial
08/20/2024Fire-Resistant Penetrations and JointsKenny Makspecial
08/20/2024FinalKayan Tseprogress
06/24/2024Fire-Resistance Rated ConstructionJay Kaviprogress
06/24/2024Energy Code Compliance InspectionsJay Kaviprogress
06/24/2024Fire-Resistant Penetrations and JointsJay Kavispecial
06/24/2024Lighting in dwelling unitsJay Kavienergy_progress
06/24/2024FinalShamsul Siddiqueprogress
02/09/2024Fire-Resistance Rated ConstructionJay Kaviprogress
02/09/2024Fire-Resistant Penetrations and JointsJay Kavispecial
02/09/2024FinalShamsul Siddiqueprogress
02/09/2024Lighting in dwelling unitsJay Kavienergy_progress
02/09/2024Energy Code Compliance InspectionsJay Kaviprogress
09/27/2023Energy Code Compliance InspectionsShamsul Siddiqueprogress
09/27/2023Fire-Resistant Penetrations and JointsShamsul Siddiquespecial
09/27/2023Air barrier - visual inspectionShamsul Siddiqueenergy_progress
09/27/2023Interior lighting powerShamsul Siddiqueenergy_progress
05/15/2023Energy Code Compliance InspectionsShamsul Siddiqueprogress
05/15/2023Fire-Resistant Penetrations and JointsShamsul Siddiquespecial
05/11/2023Structural Stability – Alterations of existing buildingsShamsul Siddiquespecial
Latest 25 of 30.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/27/2026B00852047-I1Request digital key ↗
08/27/2026B00852047-S1Request digital key ↗
08/27/2026B00903770-P2Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
12/17/2024310296532Open ↗
12/03/2024300542937Open ↗
09/12/2022310296532Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
02/04/2009310296532Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature19
09/23/2026B00903770-I1Open ↗
09/23/2026B00903770-I1Open ↗
09/23/2026B00903770-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/27/2026B00852047-S1Open ↗
08/27/2026B00852047-I1Open ↗
08/26/2026B00850724-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026B00903770-I1Open ↗
09/01/2026B00850724-I1Open ↗
09/01/2026B00903770-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/03/2009310296532Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/03/2009310296532Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/03/2009310296532Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
02/03/2009310296532Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/27/2026B00852047-I1Open ↗
08/27/2026B00852047-S1Open ↗
08/26/2026B00970284-S1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/03/2009310296532Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/15/2025310296532Open ↗
01/14/2025310296532Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/14/2025310296532Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/15/2025310296532Open ↗
▸BISFINAL1
01/14/2025310296532Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/03/2009310296532Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/02/2025310296532Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
02/03/2009310296532Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/09/2025310296532Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
02/03/2009310296532Open ↗