Two family frame
200 MYRTLE AVENUE
STATEN ISLAND · BIN 5005909
💬 Discuss this project
1920Year Built
2.5Stories
B2Building Class
R3AZoning
2,597 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 7,910 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAVID J DARCY, ARCHITECT312/05/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TROOST BROS INCGeneral Contractor403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738212/05/2022
Building Lifecycle
All (24)Filed (3)Permit Issued (2)Signed Off (2)Violation (1)Special Inspection (16)
07/26/2024
Signed off — Alteration
PROPOSED ALTERATION AND HORIZONTAL ENLARGEMENT TO THE FIRST FLOOR OF THE RESIDENCE
S00752047-I1
12/14/2022
Special inspection requirement — Permanent certificate
anthony santoro
12/14/2022
Special inspection requirement — Insulation placement and R values
anthony santoro
12/14/2022
Special inspection requirement — Air barrier - visual inspection
anthony santoro
12/14/2022
Special inspection requirement — Fenestration air leakage
anthony santoro
12/14/2022
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
12/14/2022
Special inspection requirement — Fenestration areas
anthony santoro
12/14/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
12/14/2022
Special inspection requirement — Interior lighting power
anthony santoro
12/14/2022
Special inspection requirement — Air barrier — testing
anthony santoro
12/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
12/06/2022
Special inspection requirement — Subgrade Inspections
anthony santoro
12/06/2022
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
12/06/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
12/06/2022
Special inspection requirement — Footing and Foundation
anthony santoro
12/06/2022
Special inspection requirement — Final
anthony santoro
12/06/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
12/05/2022
Filed — Alteration
PROPOSED ALTERATION AND HORIZONTAL ENLARGEMENT TO THE FIRST FLOOR OF THE RESIDENCE
S00752047-P1
12/02/2022
Signed off — Alteration
8 FOOT HIGH WOOD CONSTRUCTION FENCE
S00772000-I1
09/06/2022
Violation issued (ECB, closed)
Construction
08/09/2022
Permit issued — General Construction
S00752047-I1-GC-CX
07/28/2022
Permit issued — Construction Fence
S00772000-I1-FN
07/12/2022
Filed — Alteration
PROPOSED ALTERATION AND HORIZONTAL ENLARGEMENT TO THE FIRST FLOOR OF THE RESIDENCE
S00752047-I1
07/12/2022
Filed — Alteration
8 FOOT HIGH WOOD CONSTRUCTION FENCE
S00772000-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTROOST BROS INC08/09/2022
DOB NOWConstruction FenceSigned-offTROOST BROS INC07/28/2022
BISOTISSUEDVENTURE HOME SOLAR LLC08/20/2018
2 projects · most recent 09/13/2022
General Wiring
FiledStatusContractorScope
09/13/2022CompleteRIDGE ELECTRIC CORP.General Wiring
08/21/2018CompleteVENTURE HOME SOLAR LLC—
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
12/14/2022Permanent certificateanthony santoroenergy_progress
12/14/2022Insulation placement and R valuesanthony santoroenergy_progress
12/14/2022Air barrier - visual inspectionanthony santoroenergy_progress
12/14/2022Fenestration air leakageanthony santoroenergy_progress
12/14/2022Electric vehicle service equipment requirementsanthony santoroenergy_progress
12/14/2022Fenestration areasanthony santoroenergy_progress
12/14/2022Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
12/14/2022Interior lighting poweranthony santoroenergy_progress
12/14/2022Air barrier — testing anthony santoroenergy_progress
12/06/2022Fire-Resistant Penetrations and Jointsanthony santorospecial
12/06/2022Subgrade Inspectionsanthony santorospecial
12/06/2022Concrete - Cast-In-Placeanthony santorospecial
12/06/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
12/06/2022Footing and Foundationanthony santoroprogress
12/06/2022Finalanthony santoroprogress
12/06/2022Structural Stability – Alterations of existing buildingsanthony santorospecial
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026S00772000-I1Request digital key ↗
08/24/2026S00752047-P1Request digital key ↗
08/24/2026S00752047-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/15/2018540152617Open ↗
▸BISWORK PERMIT APPLICATION1
08/15/2018540152617Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00752047-I1Open ↗
08/13/2026S00752047-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00752047-I1Open ↗
08/13/2026S00752047-P1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature11
08/27/2026S00752047-I1Open ↗
08/27/2026S00752047-I1Open ↗
08/27/2026S00752047-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026S00752047-I1Open ↗
08/27/2026S00752047-I1Open ↗
08/27/2026S00752047-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026S00772000-I1Open ↗
08/13/2026S00752047-I1Open ↗
08/13/2026S00752047-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/15/2018540152617Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/15/2018540152617Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/15/2018540152617Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
08/15/2018540152617Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/15/2018540152617Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026S00752047-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
02/20/2019540152617Open ↗
08/15/2018540152617Open ↗
08/15/2018540152617Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/15/2018540152617Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/20/2019540152617Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
02/20/2019540152617Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/15/2018540152617Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00752047-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/20/2019540152617Open ↗
02/20/2019540152617Open ↗
08/15/2018540152617Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT2
08/13/2026S00752047-P1Open ↗
08/13/2026S00752047-I1Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/15/2018540152617Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00752047-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00752047-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
02/20/2019540152617Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/20/2019540152617Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/20/2019540152617Open ↗
08/15/2018540152617Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/15/2018540152617Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026S00752047-P1Open ↗
08/13/2026S00752047-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00752047-I1Open ↗
08/13/2026S00752047-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026S00752047-P1Open ↗
08/13/2026S00752047-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/15/2018540152617Open ↗