← Back
Over six families without stores
200 PALMETTO STREET
BROOKLYN · Bushwick (East) · BIN 3326165
💬 Discuss this project
1983Year Built
3Stories
C1Building Class
R6Zoning
99,040 sfGross Floor Area
96Units
LL97 CoveredRent Stabilized18 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: HOPE GARDENS 1 LLC · 120,200 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 31p · 1 filing · 4 docs
Floor 21p · 1 filing · 4 docs
Floor 12p · 1 filing · 4 docs
CellarUnder Construction42p · 2 filings · 20 docs
Site & exteriorUnder Construction31p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PENNROSE, LLC4008/28/2026
NEW YORK CITY HOUSING AUTHORITY803/21/2026
NYCHA303/21/2026
HOPE GARDENS I303/21/2026
HOPE GARDENS 1 LLC103/22/2026
SECURITY MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CAMERON ENGINEERING905/05/2026
IMEG CONSULTANTS CORP103/01/2026
CHRISTOPHER COMPTON405/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECC803/21/2026
JM ZONING, LLC.1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROCIDA CONSTRUCTION CORP.General Contractor504/09/2026
INTERSTATE RESTORATION LLGeneral Contractor303/21/2026
MILLER PLBG & HTG INCPlumbing307/08/2026
DUDLEY JAMALElectrical103/21/2026
JAMAL DUDLEYElectrical103/21/2026
G.M.A. PLUMBING & HEATINGPlumbing107/08/2026
?JOHN SR MARIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1061005/05/2026
ENVIRONMENTAL CODE CONSUL5516405/13/2022
Building Lifecycle
All (73)Filed (14)Permit Issued (8)Signed Off (2)Violation (9)Inspection (10)Special Inspection (30)
06/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/03/2026
Permit issued — Plumbing
B00963163-S1-PL
05/05/2026
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00963163-P7
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
04/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/29/2026
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
03/24/2026
Permit issued — Mechanical Systems
B00963163-I1-MS
03/01/2026
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00963163-S3
02/17/2026
Special inspection requirement — Final
02/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
02/17/2026
Special inspection requirement — Structural Steel - Welding
02/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/17/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
02/17/2026
Special inspection requirement — Footing and Foundation
02/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
02/17/2026
Special inspection requirement — Concrete - Cast-In-Place
02/17/2026
Special inspection requirement — Structural Steel - Details
02/17/2026
Special inspection requirement — Subgrade Inspections
02/17/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
01/08/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/31/2025
Permit issued — Boiler Equipment
B00963163-S2-BE
12/12/2025
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00963163-P6
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
12/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/12/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
12/12/2025
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
12/10/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
12/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
12/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/10/2025
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
09/22/2025
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00963163-P5
09/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
09/17/2025
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
09/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/17/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
05/08/2025
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00963163-P4
05/08/2025
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00963163-S2
05/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
05/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
05/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
03/26/2025
Permit issued — Mechanical Systems
B00963163-I1-MS
03/13/2025
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00963163-P3
02/13/2025
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00963163-P1
01/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/21/2024
Permit issued — Plumbing
B00963163-S1-PL
06/12/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/12/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/03/2024
Permit issued — Mechanical Systems
B00963163-I1-MS
01/10/2024
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00963163-S1
01/10/2024
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00963163-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/31/2023
Violation issued (FDNY_NOV, closed)
03/29/2023
Violation issued (HPD, closed)
A
03/21/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/10/2022
Violation issued (HPD, closed)
I
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMILLER PLBG & HTG INC06/03/2026
DOB NOWMechanical SystemsPermit IssuedPROCIDA CONSTRUCTION CORP.03/24/2026
DOB NOWBoiler EquipmentSigned-offMILLER PLBG & HTG INC12/31/2025
DOB NOWMechanical SystemsPermit IssuedPROCIDA CONSTRUCTION CORP.03/26/2025
DOB NOWPlumbingPermit IssuedMILLER PLBG & HTG INC11/21/2024
DOB NOWMechanical SystemsPermit IssuedPROCIDA CONSTRUCTION CORP.04/03/2024
DOB NOWGeneral ConstructionSigned-offINTERSTATE RESTORATION LL05/04/2022
DOB NOWBoiler EquipmentSigned-offG.M.A. PLUMBING & HEATING01/12/2022
BISBLISSUEDJ-J PLUMBING CORP03/24/2022
BISPLISSUEDJ-J PLUMBING CORP02/07/2022
BISBLISSUEDJ-J PLUMBING CORP03/30/2021
BISPLISSUEDJ-J PLUMBING CORP01/19/2021
BISOTISSUEDPROCIDA CONSTRUCTION CORP.12/10/2020
BISMHISSUEDPROCIDA CONSTRUCTION CORP.12/10/2020
BISBLISSUEDJ-J PLUMBING CORP11/30/2020
BISOTISSUEDBRIGHT POWER INSTALLATION06/26/2020
BISOTISSUEDPROCIDA CONSTRUCTION CORP.05/05/2020
BISMHISSUEDPROCIDA CONSTRUCTION CORP.05/05/2020
BISBLISSUEDJ-J PLUMBING CORP01/21/2020
BISPLISSUEDJ-J PLUMBING CORP01/21/2020
BISOTRE-ISSUEDPROCIDA CONSTRUCTION CORP.10/03/2019
BISMHISSUEDPROCIDA CONSTRUCTION CORP.10/03/2019
BISPLISSUEDNYC HOUSING AUTHORITY11/26/2014
BISPLISSUEDNYC HOUSING AUTHORITY11/14/2012
BISBLISSUEDNYC HOUSING AUTHORITY11/14/2012
1 project · most recent 05/05/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/05/2026Permit IssuedPROCIDA CONSTRUCTION CORPHeating Systems
Heating
Raypak H7-1000B 1,000,000 BTU · Boiler ×6
1 project · most recent 05/05/2026
FiledStatusContractorScope
05/05/2026——25 heads
1 project · most recent 05/05/2026
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
05/05/2026Permit IssuedMILLER PLBG & HTG INCGas, Plumbing-Sprinkler, Storm, Water/Sanitary
4 projects · most recent 05/20/2026
General Wiring
FiledStatusContractorScope
05/20/2026Permit IssuedHI-LIGHTS ELECTRICAL—
06/29/2024Permit IssuedSNB ELECTRICAL CONTNG COR1 meters, 1 new_meters
05/28/2020CompleteVENTURE HOME SOLAR LLC—
02/26/2020CompleteRAMDEEN'S ELEC. CONTR.CORGeneral Wiring
1 project · most recent 05/05/2026
Steel
FiledStatusContractorScope
05/05/2026Permit IssuedMILLER PLBG & HTG INCSteel
1 project · most recent 05/05/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
05/05/2026Permit IssuedMILLER PLBG & HTG INCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/12/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/12/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/21/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/01/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
04/29/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
04/29/2026Sprinkler SystemsGEORGE GHEBRYALspecial
04/29/2026Tenant Protection Plan Compliance—special
02/17/2026Subgrade Inspections—special
02/17/2026Final—progress
02/17/2026Footing and Foundation—progress
02/17/2026Structural Steel - Details—special
02/17/2026Structural Steel - High Strength Bolting—special
02/17/2026Structural Steel - Welding—special
02/17/2026Subsurface Conditions – Fill Placement & In-Place Density—special
02/17/2026Tenant Protection Plan Compliance—special
02/17/2026Subsurface Investigations (Borings/Test Pits)—special
02/17/2026Concrete - Cast-In-Place—special
02/17/2026Excavations - Sheeting, Shoring, and Bracing—special
02/17/2026Structural Stability – Alterations of existing buildings—special
12/12/2025Tenant Protection Plan Compliance—special
12/12/2025Sprinkler SystemsGEORGE GHEBRYALspecial
12/12/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/12/2025Post-installed AnchorsGEORGE GHEBRYALspecial
12/10/2025Tenant Protection Plan Compliance—special
12/10/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/10/2025Post-installed AnchorsGEORGE GHEBRYALspecial
12/10/2025Sprinkler SystemsGEORGE GHEBRYALspecial
09/17/2025Post-installed AnchorsGEORGE GHEBRYALspecial
09/17/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
Latest 25 of 64.
▾Documents — 211 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/31/2026B00606710-P1Request digital key ↗
08/31/2026B00606710-P2Request digital key ↗
08/31/2026B00606710-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION17
08/30/2022321823372Open ↗
12/06/2021321823372Open ↗
11/29/2021321823372Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION7
06/26/2020340730944Open ↗
01/31/2020321823372Open ↗
01/31/2020321823372Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications54
▸DOB NOWSpecial Inspector Seal & Signature19
09/23/2026B00606710-I1Open ↗
08/26/2026B00606710-P2Open ↗
08/26/2026B00606710-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/31/2026B00606710-I1Open ↗
08/31/2026B00606710-P1Open ↗
08/31/2026B00606710-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/22/2026B00963163-I1Open ↗
08/22/2026B00963163-I1Open ↗
08/22/2026B00963163-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
09/24/2019321823372Open ↗
09/24/2019321823372Open ↗
06/26/2019321823372Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/01/2020340730944Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/01/2020340730944Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/01/2020340730944Open ↗
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
06/26/2019321823372Open ↗
05/16/2019321823372Open ↗
04/05/2017320547262Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
12/06/2021321823372Open ↗
11/29/2021321823372Open ↗
10/04/2012320547262Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
05/16/2019321823372Open ↗
10/04/2012320547262Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
06/10/2015320547262Open ↗
03/25/2015320547262Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
08/17/2022321823372Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/17/2022321823372Open ↗
▸BISSPRINKLER SYSTEMS1
08/17/2022321823372Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
06/10/2015320547262Open ↗
▸BISHEATING SYSTEMS1
08/17/2022321823372Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
06/26/2019321823372Open ↗
05/16/2019321823372Open ↗
07/19/2020340730944Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/31/2026B00606710-I1Open ↗
08/31/2026B00606710-P1Open ↗
08/31/2026B00606710-P2Open ↗
Showing 3 of 12 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/03/2019321823372Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/04/2012320547262Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/03/2019321823372Open ↗
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
09/24/2019321823372Open ↗
09/24/2019321823372Open ↗
06/26/2019321823372Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/25/2021340730944Open ↗
06/19/2020340730944Open ↗
06/01/2020340730944Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
08/17/2022321823372Open ↗
08/25/2021340730944Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/03/2017320547262Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/17/2022321823372Open ↗
▸BISFENESTRATION AREAS1
08/17/2022321823372Open ↗
▸BISLIGHTING IN DWELLING UNITS1
08/17/2022321823372Open ↗
▸BISELECTRIC MOTORS1
08/17/2022321823372Open ↗
▸BISLIGHTING CONTROLS1
08/17/2022321823372Open ↗
▸BIS* HVAC INSULATION AND SEALING1
08/17/2022321823372Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/17/2022321823372Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/01/2020340730944Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
08/17/2022321823372Open ↗
▸BISEXTERIOR LIGHTING POWER1
08/17/2022321823372Open ↗
▸BISFENESTRATION AIR LEAKAGE1
08/17/2022321823372Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/17/2022321823372Open ↗
▸BISINTERIOR LIGHTING POWER1
08/17/2022321823372Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/25/2021340730944Open ↗
06/19/2020340730944Open ↗
06/01/2020340730944Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/17/2022321823372Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/17/2022321823372Open ↗
▸BISMECHANICAL SYSTEMS1
08/17/2022321823372Open ↗
▸BISHIGH TEMPERATURE HOT WATER PIPING (WELDING)1
08/17/2022321823372Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
08/17/2022321823372Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00963163-S3Open ↗
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/31/2026B00606710-I1Open ↗
08/31/2026B00606710-P1Open ↗
08/31/2026B00606710-P2Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/30/2022321823372Open ↗
08/25/2021340730944Open ↗
05/03/2017320547262Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/16/2019321823372Open ↗
10/24/2012320547262Open ↗
▸BISFINAL1
08/17/2022321823372Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/04/2012320547262Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT11
09/28/2022321823372Open ↗
09/14/2022321823372Open ↗
07/09/2021340730944Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
09/29/2022321823372Open ↗
08/25/2021340730944Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION9
11/20/2021321823372Open ↗
11/20/2021321823372Open ↗
07/08/2019321823372Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET3
05/16/2019321823372Open ↗
05/16/2019321823372Open ↗
10/27/2012320547262Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/01/2020340730944Open ↗
▸BISBOROUGH INTAKE FORM1
02/20/2020301556689Open ↗
▸Other Documents2
▸BISMAINTENANCE INFORMATION1
08/17/2022321823372Open ↗
▸BISSHUTOFF DAMPERS1
08/17/2022321823372Open ↗