RoofUnder Construction35p · 15 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural · Supported Scaffold
Job M01306990Permit Issued · 07/27/2026
Hereby filing roof repairs and terrace enhancement at the 10th Floor and 10th Floor Bulkhead as per Plans. No Change to use, egress, or occupancy.
On file for this job
2 documents · 1 drawing sheet
Hereby filing to Patch and repair existing roofing and modify existing guardrail, for installation of building maintenance unit infrastructure as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this job
21 documents · 6 drawing sheets
Hereby filing Supplemental structural framing for the support of window washing equipment as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
4 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 59Under Construction14p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Structural
Hereby filing to Patch and repair existing roofing and modify existing guardrail, for installation of building maintenance unit infrastructure as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this job
21 documents · 4 drawing sheets
Hereby filing Supplemental structural framing for the support of window washing equipment as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
4 documents
Floor 58Under Construction37p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Standpipe · Structural
Hereby filing to Patch and repair existing roofing and modify existing guardrail, for installation of building maintenance unit infrastructure as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this job
21 documents · 2 drawing sheets
Hereby filing Supplemental structural framing for the support of window washing equipment as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
4 documents
PLUMBING WORK IN CONJUNCTION WITH INTERIOR OFFICE RENOVATION ON THE 58TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
7 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 57Under Construction24p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Standpipe · Structural · Supported Scaffold
Hereby filing to Patch and repair existing roofing and modify existing guardrail, for installation of building maintenance unit infrastructure as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this job
21 documents · 3 drawing sheets
Hereby filing Supplemental structural framing for the support of window washing equipment as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
4 documents
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this job
2 documents
Latest 3 of 8 filings on this floor.
Floor 5618p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Filing herewith interior renovation of existing 56th floor space, Magnitude Capital. No change in use, egress or occupancy.
On file for this job
3 documents · 5 drawing sheets
Filing herewith mechanical work at existing 56th floor space, Magnitude Capital. No change in use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Additions / Modification to existing Sprinkler system and plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
15 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 55
Floor 548p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Modification to existing Sprinkler & Plumbing Systems as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
14 documents · 4 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary loop as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
6 documents · 2 drawing sheets
Floor 534p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Filing herewith Plumbing on the 51st to 53rd FLS. as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
9 documents · 1 drawing sheet
Filing herewith Mechanical Work on the 51st, 52nd and 53rd FLS. as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
21 documents · 1 drawing sheet
Filing herewith modification to the existing sprinkler system on the 51st to 53rd FL. as per plans filed herewith. No change to use, egress occupancy.
On file for this job
10 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 525p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Rebalancing of supply CFM in elevator machine rooms. New temperature sensors in elevator machine rooms. New FCU's added to the 17, 30, 36 and 52 EMRs as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
19 documents · 2 drawing sheets
Filing herewith Plumbing on the 51st to 53rd FLS. as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
9 documents · 1 drawing sheet
Filing herewith Mechanical Work on the 51st, 52nd and 53rd FLS. as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
21 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 516p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Filing herewith Plumbing on the 51st to 53rd FLS. as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
9 documents · 3 drawing sheets
Filing herewith Mechanical Work on the 51st, 52nd and 53rd FLS. as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
21 documents · 2 drawing sheets
Filing herewith modification to the existing sprinkler system on the 51st to 53rd FL. as per plans filed herewith. No change to use, egress occupancy.
On file for this job
10 documents · 1 drawing sheet
Floor 50
Floor 49
Floor 483p · 2 filings · 6 docs
Fire ProtectionPlumbing
MODIFICATION TO THE EXISTING SPRINKLER SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
REMOVAL AND INSTALLATION OF PL FIXTURES AND RELATED FININHES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents · 2 drawing sheets
Floor 471p · 1 filing · 19 docs
Mechanical
Rebalancing of supply CFM in elevator machine rooms. New temperature sensors in elevator machine rooms. New FCU's added to the 17, 30, 36 and 52 EMRs as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
19 documents · 1 drawing sheet
Floor 46Under Construction36p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Hereby filing to remove and install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
23 documents · 11 drawing sheets
Floor 4528p · 11 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Structural
Plumbing modifications taking place on the 45th floor as per plans filed herewith. No change in use, egress nor occupancy.
On file for this job
3 documents · 1 drawing sheet
Sprinkler modifications taking place on the 45th floor as per plans filed herewith. No change in use, egress nor occupancy.
On file for this job
6 documents · 2 drawing sheets
General construction taking place on the 45th floor as per plans filed herewith. No change in use, egress nor occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 44Under Construction59p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
880 SF CONSTRUCTION OF NEW PARTITIONS AND DOORS ON THE 44TH FL EAST MULTI-PURPOSE ROOM AS PER PLANS AND INCREASE IN OCCUPANCY AND PA SPACE. ALL RELATED FILINGS TO BE SUBMITTED INDIVIDUALLY.
On file for this job
11 documents
Structural modifications and related finishes as per plans. There will be no change in use, egress, or occupancy.
On file for this job
24 documents · 5 drawing sheets
Interior tenant fit-out and related finishes as per plans.
On file for this job
3 documents
Floor 431p · 1 filing · 20 docs
Mechanical
Sprinkler modifications and associated piping and related finishes for tenant fit-out as per plans. There will be no change in use, egress, or occupancy.
On file for this job
45 documents · 1 drawing sheet
Floor 424p · 2 filings · 19 docs
MechanicalStructural
mechanical modifications to commercial space located on the 42nd fl
On file for this job
14 documents · 4 drawing sheets
Mechanical Demolition Pertaining to Office Renovations.
On file for this job
5 documents · 1 drawing sheet
Floor 4110p · 2 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Sprinkler modifications and associated piping and related finishes for tenant fit-out as per plans. There will be no change in use, egress, or occupancy.
On file for this job
45 documents · 7 drawing sheets
Interior sprinkler demo and related piping with a sprinkler temp loop install as per plans. There will be no change in use, egress, or occupancy.
On file for this job
24 documents · 3 drawing sheets
Floor 402p · 1 filing · 20 docs
Plumbing
Sprinkler modifications and associated piping and related finishes for tenant fit-out as per plans. There will be no change in use, egress, or occupancy.
On file for this job
45 documents · 2 drawing sheets
Floor 3941p · 5 filings · 20 docs
ArchitectureDMElectricalMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Removal and renovation of interior non-load bearing partitions on 38th & 39th Floors and Construction Floor 2 (Marketing Mezzanine Level) as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
6 documents · 3 drawing sheets
New slab opening & floor reinforcement and new stair (Modification to existing structural system) as per plans filed herewith. No change in use egress, or occupancy under this application.
On file for this job
3 documents · 1 drawing sheet
Modification to existing plumbing & sprinkler systems & installation of new plumbing fixtures & sprinker heads as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
7 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 3834p · 2 filings · 13 docs
ArchitectureDMPlumbing
Issued Permit Scope
General Construction
Removal and renovation of interior non-load bearing partitions on 38th & 39th Floors and Construction Floor 2 (Marketing Mezzanine Level) as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Modification to existing plumbing & sprinkler systems & installation of new plumbing fixtures & sprinker heads as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
7 documents · 3 drawing sheets
Floor 37
Floor 367p · 3 filings · 20 docs
Fire ProtectionMechanical
Rebalancing of supply CFM in elevator machine rooms. New temperature sensors in elevator machine rooms. New FCU's added to the 17, 30, 36 and 52 EMRs as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
19 documents · 2 drawing sheets
Renovation of existing office space with conversion of constant air volume system to a variable air volume within new space as shown on drawings filed herewith. No change in use egress or occupancy.
On file for this job
3 documents · 3 drawing sheets
Modify sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
12 documents · 2 drawing sheets
Floor 35
Floor 34Under Construction52p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Hereby to remove fire hose cabinet as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
27 documents · 16 drawing sheets
Floor 33Under Construction47p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Hereby filing to remove and install new plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
21 documents · 4 drawing sheets
Hereby filing for demo of communicating stair at 32nd floor (32 to 33) and slab infill on the 33rd floor as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this job
3 documents · 1 drawing sheet
Floor 32Under Construction13p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Job M01450585Permit Issued · 09/10/2026
Hereby filing to remove and install plumbing fixtures with related piping for bathroom renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
15 documents
DISCONNECT AND REMOVE EXISTING WATER COOLED CONDENSER UNIT AND AIR HANDLER UNIT ON 32ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
5 documents · 1 drawing sheet
REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES AND CEILINGS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this job
6 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 31Under Construction16p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Removal and renovation of non-load bearing interior partitions
On file for this job
6 documents
Freddie Mac Fit Out - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
27 documents · 3 drawing sheets
Freddie Mac Fit Out - PLUMBING MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 30Under Construction63p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Hereby filing to remove and install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
18 documents
Rebalancing of supply CFM in elevator machine rooms. New temperature sensors in elevator machine rooms. New FCU's added to the 17, 30, 36 and 52 EMRs as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
19 documents · 2 drawing sheets
Floor 29Under Construction38p · 2 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Hereby filing to remove, relocate, and install new sprinkler heads with related piping for office renovation as shown on plans filed herewith.
On file for this job
21 documents · 3 drawing sheets
Hereby filing to remove plumbing fixtures and sprinkler heads with related piping on the 16th floor a shown on plans filed herewith.
On file for this job
7 documents · 1 drawing sheet
Floor 28Under Construction61p · 1 filing · 18 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Hereby filing to remove and install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
18 documents
Floor 27Under Construction75p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Hereby filing to remove and install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
18 documents · 3 drawing sheets
Removal and renovation of interior non-load bearing partitions, fixtures, suspended ceilings, floors and finishes.
On file for this job
10 documents · 5 drawing sheets
Modification to existing HVAC systems on 27th Floor. No change in use, egress or occupancy under this application
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 26Under Construction62p · 1 filing · 18 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Hereby filing to remove and install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
18 documents · 1 drawing sheet
Floor 251p · 1 filing · 3 docs
Plumbing
Modification to existing Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
3 documents · 1 drawing sheet
Floor 242p · 2 filings · 20 docs
MechanicalStructural
Rebalancing of supply CFM in elevator machine rooms. New temperature sensors in elevator machine rooms. New FCU's added to the 17, 30, 36 and 52 EMRs as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
19 documents · 1 drawing sheet
Modification to existing Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
3 documents · 1 drawing sheet
Floor 23Under Construction21p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Filing herewith modification to the existing sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
5 documents
Filing herewith interior demo. and renovations for the 23rd FL. as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
3 documents · 7 drawing sheets
filing herewith Mechanical work on the 23rd FL. as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
16 documents
Floor 22Under Construction18p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Standpipe · Structural
INTERIOR FITOUT RENOVATION, INCLUDING INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
68 documents · 6 drawing sheets
Floor 21Under Construction23p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
INTERIOR FITOUT RENOVATION, INCLUDING INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
68 documents · 1 drawing sheet
INTERIOR FITOUT RENOVATION, INCLUDING INSTALLATION OF INTERIOR NON-BEARING PARTITIONS ANDRELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
58 documents · 6 drawing sheets
Hereby filing a heat rejection system for tenants as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
4 documents · 2 drawing sheets
Floor 20Under Construction19p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
INTERIOR FITOUT RENOVATION, INCLUDING INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
68 documents · 6 drawing sheets
Mechanical changes on the 20th floor as indicated on drawings.
On file for this job
7 documents · 1 drawing sheet
Floor 19Under Construction45p · 1 filing · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
INTERIOR FITOUT RENOVATION, INCLUDING INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
25 documents · 10 drawing sheets
Floor 183p · 2 filings · 20 docs
PlumbingStructural
FILING STRUCTURAL WORK FOR INSTALLATION OF ADDITIONAL STEEL FOR EXISTING FRAMING REINFORCEMENT AND MOVEABLE PARTITIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
43 documents · 2 drawing sheets
Hereby filing to remove, relocate, and install plumbing fixtures and sprinkler heads with related piping for renovation of the southeast suite as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
8 documents · 1 drawing sheet
Floor 1714p · 8 filings · 20 docs
ArchitectureElectricalGeneralMechanicalPlumbingStructural
FILING STRUCTURAL WORK FOR INSTALLATION OF ADDITIONAL STEEL FOR EXISTING FRAMING REINFORCEMENT AND MOVEABLE PARTITIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
43 documents · 5 drawing sheets
FILING IN ORDER TO REMOVE AND REPLACE FIRE HOSE STANDPIPE AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
6 documents · 1 drawing sheet
Hereby filing to replace and install new fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
19 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 1628p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Hereby filing to replace and install new fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
19 documents · 8 drawing sheets
Installation of interior, non-load bearing partitions, doors, ceilings, and related finishes as per plans filed herewith. No change in use, egress, or occupancy under this application.
On file for this job
8 documents · 12 drawing sheets
Hereby filing to remove, relocate, and install plumbing fixtures and sprinkler heads with related piping for renovation of the southeast suite as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
8 documents · 5 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 1537p · 5 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
interior renovations and modifications to existing partitions, fixtures, and finishes as per plans filed herewith. no change to use egress or occupancy.
On file for this job
8 documents · 6 drawing sheets
modifications to the existing plumbing, sprinkler, standpipe systems as per plans filed herewith. no change to use egress or occupancy.
On file for this job
9 documents · 18 drawing sheets
Modifications to mechanical systems. No change in use, occupancy, or egress.
On file for this job
12 documents · 11 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1412p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanical
Issued Permit Scope
Sprinklers
General construction work in conjunction with partial Floor interior fit out. No change to use, egress, or occupancy.
On file for this job
8 documents · 5 drawing sheets
Mechanical work filed in conjunction with partial Floor interior fit out. No change to use, egress, or occupancy.
On file for this job
15 documents · 2 drawing sheets
Filing herewith interior renovation to the 14th FL. as per plans filed herewith. No Change to use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 131p · 1 filing · 5 docs
DM
Demolition of interior partitions, finishes, ceilings, doors and restrooms as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Floor 1213p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Removal of interior partitions, fixtures, suspended ceilings, floors and finishes.
On file for this job
5 documents
Filing herewith plumbing work on the 12th FL. space as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
13 documents · 2 drawing sheets
Filing herewith interior renovation to the 12th FL. space as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
12 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1115p · 4 filings · 17 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Filing herewith plumbing work on existing 11th floor space. No change in use, egress or occupancy.
On file for this job
3 documents · 4 drawing sheets
Filing herewith sprinkler work on existing 11th floor space. No change in use, egress or occupancy.
On file for this job
8 documents · 4 drawing sheets
Filing herewith interior renovation to existing 11 floor space. No change in use, egress or occupancy.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 10Under Construction56p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Standpipe · Structural
Hereby filing to install new streel framing for raised deck as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
12 documents · 3 drawing sheets
Job M01306990Permit Issued · 07/27/2026
Hereby filing roof repairs and terrace enhancement at the 10th Floor and 10th Floor Bulkhead as per Plans. No Change to use, egress, or occupancy.
On file for this job
2 documents
FILING HEREWITH SPRINKLER AND STANDPIPE WORK AS PER PLANS.
On file for this job
4 documents
Latest 3 of 6 filings on this floor.
Floor 9Under Construction37p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Modification to existing plumbing and sprinkler systems and fixtures and head. No changes in use, egress or occupancy.
On file for this job
4 documents · 3 drawing sheets
Modification to existing HVAC systems as per plans filed. No change in use, egress or occupancy.
On file for this job
6 documents
Renovation of existing tenant space to add additional offices / meeting rooms into a vacant portion of their floor area. No change in use, egress or occupancy.
On file for this job
3 documents
Latest 3 of 7 filings on this floor.
Floor 812p · 25 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Hereby filing to modify/install new plumbing piping for future tenants as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
3 documents · 1 drawing sheet
Modification and restoration of 8th floor roof and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
9 documents · 2 drawing sheets
Hereby filing to construct interior partitions, ceilings and doors for future tenant fit outs as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 772p · 16 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification and restoration of 8th floor roof and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
9 documents · 4 drawing sheets
Demolition on interior partitions, finishes, ceilings, doors and restrooms as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Modify mechanical ductwork as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
5 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 648p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 3-6th Floor as per plans (Metlife Demise and Separation Project.) No change to use, egress or occupancy.
On file for this job
11 documents · 11 drawing sheets
Hereby filing Concrete spall and crack repairs and local slab replacement as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
13 documents · 2 drawing sheets
Filing herewith for the modifications of existing plumbing systems.
On file for this job
12 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 567p · 10 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 3-6th Floor as per plans (Metlife Demise and Separation Project.) No change to use, egress or occupancy.
On file for this job
11 documents · 9 drawing sheets
Modifications to the existing HVAC System on the 3-6th Floor as per plans (Metlife Demise and Separation Project.) No change to use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Hereby filing Concrete spall and crack repairs and local slab replacement as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
13 documents · 5 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 486p · 13 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 3-6th Floor as per plans (Metlife Demise and Separation Project.) No change to use, egress or occupancy.
On file for this job
11 documents · 9 drawing sheets
hereby filing to install new meter for retail spaces as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
6 documents · 1 drawing sheet
Hereby filing Concrete spall and crack repairs and local slab replacement as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
13 documents · 6 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3102p · 9 filings · 20 docs
ArchitectureCivilGeneralMechanicalStructural
Issued Permit Scope
General Construction
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 3-6th Floor as per plans (Metlife Demise and Separation Project.) No change to use, egress or occupancy.
On file for this job
11 documents · 11 drawing sheets
hereby filing to install new meter for retail spaces as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
6 documents · 1 drawing sheet
Hereby filing a heat rejection system for tenants as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 213p · 17 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 2nd Floor as per plans (Metlife Welcome Center.) No change to use, egress or occupancy.
On file for this job
3 documents · 3 drawing sheets
Modifications to the existing HVAC System: remove and install new ductwork and associated controls on the 2nd Floor as per plans (Metlife Welcome Center.) No change to use, egress or occupancy.
On file for this job
12 documents · 2 drawing sheets
Install new Plumbing Fixtures: (2) Coffeemakers, (1) Water Dispenser/ Ice Maker, (1) Water Dispenser and associated CW/sanitary piping on the 2nd Floor as per plans (MetLife Welcome Center.) No change to use, egress or occupancy.
On file for this job
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 19p · 35 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Provide new exhaust fan and associated ductwork and connect to existing louver as per drawings filed herewith. No change in use, egress or occupancy.
On file for this job
13 documents · 1 drawing sheet
Hereby filing to install new plumbing fixtures with related piping for retail fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
3 documents · 1 drawing sheet
Hereby filing to renovate lobby lounge as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Mezzanine104p · 16 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems
Provide new exhaust fan and associated ductwork and connect to existing louver as per drawings filed herewith. No change in use, egress or occupancy.
On file for this job
13 documents · 1 drawing sheet
Hereby filing to install new ac units with associated ductwork for lobby lounge renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
14 documents · 6 drawing sheets
Hereby filing to install new plumbing fixtures with related piping for lobby lounge renovation as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Cellar5p · 1 filing · 14 docs
ElectricalMechanicalPlumbing
Modification to existing HVAC system as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
14 documents · 5 drawing sheets