200 PRESIDENT STREET
BROOKLYN · BIN 3004765
💬 Discuss this project
1900Year Built
4Stories
C6Building Class
R6BZoning
6,360 sfGross Floor Area
4Units
Rent Stabilized0 Active Violations
Walk-up cooperative · Owner of record: 200 President St · 2,275 sf lot · 2.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMechanical work for roof, first floor, and cellar1p · 1 filing · 3 docs
Floor 1Unit 1222p · 4 filings · 20 docs
CellarMechanical work for roof, first floor, and cellar27p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
200 President St603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M.A. Rubiano, P.E405/14/2024
Old Structures Engineering203/09/2022
Aimee Lopez Architect108/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Code1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Palladian ConstructionGeneral Contractor1507/08/2026
Zoom ContractingGeneral Contractor603/21/2026
MCM Plumbing & HeatingPlumbing607/08/2026
Pro ElectricElectrical103/21/2026
Michael Castagliola, JRElectrical103/21/2026
Pro ElectricGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803403/09/2022
Building Lifecycle
All (58)Filed (7)Permit Issued (4)Signed Off (1)Violation (6)Inspection (5)Objection (8)Special Inspection (16)
05/05/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
02/28/2025
Permit expired, never signed off — Structural
The city's record still shows this permit as issued, with no sign-off on its filing
B00568060-I1-ST
07/08/2024
Signed off — Alteration
Installation and modification of plumbing fixtures at existing apartment on floors CEL and 001. Plumbing work. There is to be no change of use, occupancy, or egress.
B00566041-I1
05/14/2024
Filed — Alteration
Installation and modification of plumbing fixtures at existing apartment on floors CEL and 001. Plumbing work. There is to be no change of use, occupancy, or egress.
B00566041-P2
05/02/2024
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B00566039-I1-GC
05/02/2024
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
B00566045-I1-MS
04/11/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
02/28/2024
Permit renewed — Structural
Renewed with changes
B00568060-I1-ST
10/20/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/16/2023
Permit renewed — Plumbing
Renewed without changes
B00566041-I1-PL
05/02/2023
Permit renewed — Mechanical Systems
Renewed with changes
B00566045-I1-MS
05/02/2023
Permit renewed — General Construction
Renewed with changes
B00566039-I1-GC
01/10/2023
Permit renewed — General Construction
Renewed without changes
B00566039-I1-GC
01/09/2023
Permit renewed — General Construction
Renewed without changes
B00566039-I1-GC
01/09/2023
Permit renewed — Mechanical Systems
Renewed without changes
B00566045-I1-MS
10/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/21/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/29/2022
Objection raised — Scope
06/29/2022
Objection resolved — Addressed
06/28/2022
Objection resolved — Addressed
06/27/2022
Objection raised — Other
06/24/2022
Objection raised — Other
06/24/2022
Objection resolved — Addressed
06/23/2022
Filed — Alteration
Installation and modification of plumbing fixtures at existing apartment on floors CEL and 001. Plumbing work. There is to be no change of use, occupancy, or egress.
B00566041-P1
03/16/2022
Permit issued — Structural
B00568060-I1-ST
03/15/2022
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
03/15/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
03/15/2022
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
03/15/2022
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
03/15/2022
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
03/15/2022
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
03/15/2022
Special inspection requirement — Final
SAMI HAJJAR P.E
03/15/2022
Special inspection requirement — Structural Wood Frame
SAMI HAJJAR P.E
03/09/2022
Filed — Alteration
Interior and exterior renovation of existing residence on floors CEL and 001. Structural work. There is to be no change of use, occupancy, or egress.
B00568060-P1
03/01/2022
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
02/24/2022
Permit issued — Mechanical Systems
B00566045-I1-MS
02/11/2022
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
02/11/2022
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
02/11/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
02/11/2022
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
02/11/2022
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
02/11/2022
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
02/11/2022
Special inspection requirement — Final
SAMI HAJJAR P.E
02/11/2022
Special inspection requirement — Structural Wood Frame
SAMI HAJJAR P.E
12/15/2021
Filed — Alteration
Interior and exterior renovation of existing residence on floors CEL and 001. Structural work. There is to be no change of use, occupancy, or egress.
B00568060-I1
12/03/2021
Permit renewed — General Construction
Renewed without changes
B00566039-I1-GC
11/03/2021
Permit issued — General Construction
B00566039-I1-GC
11/02/2021
Permit issued — Plumbing
B00566041-I1-PL
08/13/2021
Objection resolved — Addressed
08/06/2021
Objection raised — Other
08/05/2021
Filed — Alteration
Installation and modification of plumbing fixtures at existing apartment on floors CEL and 001. Plumbing work. There is to be no change of use, occupancy, or egress.
B00566041-I1
08/05/2021
Filed — Alteration
B00566045-I1
08/05/2021
Filed — Alteration
B00566039-I1
11/28/2017
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
11/14/2016
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
10/13/2015
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedZoom Contracting02/28/2024
DOB NOWPlumbingSigned-offMCM Plumbing & Heating10/16/2023
DOB NOWMechanical SystemsPermit IssuedZoom Contracting05/02/2023
DOB NOWGeneral ConstructionPermit IssuedZoom Contracting05/02/2023
DOB NOWGeneral ConstructionPermit IssuedPalladian Construction01/10/2023
DOB NOWGeneral ConstructionPermit IssuedPalladian Construction01/09/2023
DOB NOWMechanical SystemsPermit IssuedPalladian Construction01/09/2023
DOB NOWStructuralPermit IssuedPalladian Construction03/16/2022
DOB NOWMechanical SystemsPermit IssuedPalladian Construction02/24/2022
DOB NOWGeneral ConstructionPermit IssuedPalladian Construction12/03/2021
DOB NOWGeneral ConstructionPermit IssuedPalladian Construction11/03/2021
DOB NOWPlumbingSigned-offMCM Plumbing & Heating11/02/2021
BISPLISSUEDArmon Mechanical01/25/2008
3 projects · most recent 07/31/2024
General Wiring
FiledStatusContractorScope
07/31/2024CompletePro ElectricGeneral Wiring
08/28/2023CompleteAMC Electrical Services—
04/27/2022CompletePro ElectricGeneral Wiring
1 project · most recent 03/09/2022
Steel Concrete Wood
FiledStatusContractorScope
03/09/2022Permit IssuedZoom ContractingSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
03/15/2022Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
03/15/2022Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
03/15/2022Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
03/15/2022Structural Steel - DetailsSAMI HAJJAR P.Especial
03/15/2022Structural Steel - WeldingSAMI HAJJAR P.Especial
03/15/2022Post-installed AnchorsSAMI HAJJAR P.Especial
03/15/2022FinalSAMI HAJJAR P.Eprogress
03/15/2022Structural Wood FrameSAMI HAJJAR P.Eprogress
02/11/2022Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
02/11/2022Post-installed AnchorsSAMI HAJJAR P.Especial
02/11/2022Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
02/11/2022Structural Steel - DetailsSAMI HAJJAR P.Especial
02/11/2022Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
02/11/2022Structural Steel - WeldingSAMI HAJJAR P.Especial
02/11/2022FinalSAMI HAJJAR P.Eprogress
02/11/2022Structural Wood FrameSAMI HAJJAR P.Eprogress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/01/2026B00566045-I1Request the plans ↗
09/01/2026B00566039-I1Request the plans ↗
09/01/2026B00566041-P2Request the plans ↗
Showing 3 of 7 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
01/25/2008310007202Open ↗
11/29/2007310007202Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
06/16/2008310007202Open ↗
05/06/2008310007202Open ↗
▸Seals & Professional Certifications26
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026B00568060-I1Open ↗
09/01/2026B00568060-I1Open ↗
09/01/2026B00568060-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00566045-I1Open ↗
09/01/2026B00566039-I1Open ↗
09/01/2026B00566041-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00568060-I1Open ↗
09/01/2026B00568060-I1Open ↗
08/26/2026B00568060-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT1
08/21/2007310007202Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY1
08/21/2007310007202Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/24/2009310007202Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
06/16/2008310007202Open ↗
05/07/2008310007202Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
10/29/2008310007202Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00566045-I1Open ↗
09/01/2026B00566039-I1Open ↗
09/01/2026B00566041-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/21/2007310007202Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/24/2009310007202Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/21/2007310007202Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/24/2009310007202Open ↗
01/25/2008310007202Open ↗
11/29/2007310007202Open ↗