| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/06/2026 | Signed-off | JAMES E FITZGERALD INC | Air Conditioning Systems | Cooling Above Air MCW-021S1-4-00000-EC-FE-UF0-1B 87,100 BTU · Crac Unit ×2 |
| 05/13/2026 | Signed-off | STEADFAST DEVELOPMENT AND | Heating Systems, Ventilation Systems | |
| 12/02/2025 | Permit Issued | JAMES E FITZGERALD INC | Air Conditioning Systems | Cooling Above Air CWU-005S1-1-00-00-SC 18,000 BTU · Condensing Unit ×1 WCH-005S1-1-00000-EC-00-DFF-WA 18,000 BTU · Fan Coil Indoor ×1 |
| 04/25/2025 | Signed-off | JRM CONSTRUCTION MGMT LLC | Heating and Air Conditioning Systems | Heat / Cool Anemostat ESTW 23,400 BTU · Exhaust Fan ×22 |
| 09/27/2024 | Signed-off | JAMES E FITZGERALD INC | Air Conditioning Systems | Cooling Florida Heat Pump CL-042 30,000 BTU · Wshp ×1 |
| 08/10/2023 | — | — | Heating Systems | Heating Qmark CPH05 5,120 BTU · Electric Heater ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/23/2026 | Permit Issued | DENKO MECHANICAL INC | — |
| 07/06/2026 | Signed-off | PAR FIRE PROTECTION LLC | Sprinkler System |
| 05/13/2026 | Signed-off | SKINNER PLMNG & HTG CORP | 150 heads |
| 11/25/2025 | Permit Issued | AGGRESSIVE FIRE PROT LLC | Sprinkler System |
| 10/31/2025 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 07/29/2025 | Signed-off | AGGRESSIVE FIRE PROT LLC | 32 heads |
| 04/25/2025 | Signed-off | AGGRESSIVE FIRE PROT LLC | Sprinkler System |
| 09/27/2024 | Signed-off | PAR FIRE PROTECTION LLC | — |
| 06/28/2024 | Signed-off | SIRINA FIRE PROT CORP | 12 heads |
| 08/10/2023 | — | — | 7 heads |
| 08/10/2023 | — | — | 2 outlets |
| 01/27/2023 | Signed-off | EVERGREEN MECHANICAL CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/06/2026 | — | — | — |
| 05/13/2026 | Signed-off | SKINNER PLUMBING & HEATIN | Water/Sanitary |
| 07/29/2025 | — | — | — |
| 04/25/2025 | Signed-off | MAC FELDER INC | Water/Sanitary |
| 06/28/2024 | Signed-off | ASHLAND PLUMBING CORP | Water/Sanitary |
| 02/04/2020 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/15/2026 | Permit Issued | M.C. ELECTRICAL NY INC | General Wiring |
| 11/25/2025 | Complete | ROBERT B SAMUELS, INC | General Wiring |
| 11/07/2025 | Permit Issued | NORCAL ELECTRIC LLC | General Wiring |
| 10/17/2025 | Complete | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 10/08/2025 | Complete | HATZEL AND BUEHLER, INC | General Wiring |
| 09/26/2025 | Complete | FOREST ELECTRIC CORP. | — |
| 12/11/2024 | Complete | PREMIER ELECTRIC, INC | General Wiring |
| 10/15/2024 | Complete | ALLAN BRITEWAY ELECTRICAL | General Wiring |
| 08/06/2024 | Pending Payment | ALLAN BRITEWAY ELECTRICAL | General Wiring |
| 06/19/2024 | Complete | ROBERT B SAMUELS, INC | General Wiring |
| 05/13/2024 | Permit Issued | E-J ELEC. INSTALLATION CO | General Wiring |
| 02/07/2024 | Complete | ABSOLUTE ELEC'L CONTRG OF | General Wiring |
| 01/04/2024 | Complete | TOP SHELF ELECTRIC CORP | — |
| 06/19/2023 | Complete | RAIDEN ELECTRIC LLC | General Wiring |
| 02/18/2023 | Complete | ABSOLUTE ELEC'L CONTRG OF | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/23/2026 | Permit Issued | DENKO MECHANICAL INC | Steel, Concrete |
| 05/13/2026 | Signed-off | STEADFAST DEVELOPMENT AND | Steel |
| 03/18/2022 | Permit Issued | TULLA CONTRACTING CORP | Steel, Concrete |
| Owner | Filings | Most Recent |
|---|---|---|
| CBRE | 388 | 09/30/2026 |
| BROOKFIELD PROPERTIES | 35 | 07/08/2026 |
| SA HOSPITALITY GROUP | 6 | 07/08/2026 |
| BANK INDONESIA | 4 | 07/08/2026 |
| AIG GLOBAL REAL ESTATE | 2 | 03/22/2026 |
| GROUP ENTERPRIS BENJAMIN | 3 | 03/22/2026 |
| TO OWNER OF | 1 | 03/22/2026 |
| TO THE OWNER OF 260 VESEY | 1 | 03/22/2026 |
| CELESTIAL CLEANERS, INC | 1 | 03/22/2026 |
| MANAGEMENT BUILDING | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| THORNTON TOMASETTI | 2 | 07/23/2026 |
| WB ENGINEERS & CONSULTANTS PLLC | 41 | 07/22/2026 |
| BELLSEY & ASSOCIATES | 7 | 07/22/2026 |
| ROBERT DERECTOR ASSOCIATES | 18 | 07/06/2026 |
| KLH PROFESSIONAL ENGINEERS, PSC P.C | 4 | 05/13/2026 |
| NEWTEC ENGINEERING | 1 | 05/05/2026 |
| METHOD ARCHITECTS PLLC | 21 | 03/02/2026 |
| ARMOUR UNSDERFER ENGINEERING INC, P | 1 | 02/20/2026 |
| JIM BROWNING, AIA | 1 | 01/02/2026 |
| NELSON ARCHITECTURE &INTERIORS, INC | 5 | 11/24/2025 |
| DEAN MENDEZ RA | 1 | 11/03/2025 |
| HLW INTERNATIONAL | 4 | 10/28/2025 |
| WSP | 10 | 07/14/2025 |
| CHARLES OTIS LOGAN JR | 3 | 03/20/2025 |
| AMA CONSULTING ENGINEERS, PC | 21 | 03/14/2025 |
| TRICARICO ARCHITECTURE AND DESIGN | 1 | 02/07/2025 |
| PERKINS and WILL | 1 | 09/26/2024 |
| EMANUELSON PODAS INC. | 9 | 06/28/2024 |
| ACTIVE DESIGN GROUP ENGINEERING | 1 | 03/26/2024 |
| CARLTON ARCHITECTURE,PC | 2 | 03/22/2024 |
| WELLWORTH CONSULTING LLC | 2 | 01/08/2024 |
| SSM DESIGN LLP D/B/A SPECTOR GROUP | 7 | 12/01/2023 |
| JEFFREY N. BEEDEN | 3 | 09/06/2023 |
| CAPRON DESIGN LLC | 2 | 08/10/2023 |
| WAVIC ENGINEERING PLLC | 3 | 06/30/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| DVA Advisors | 67 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 153 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 26 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 2 | 03/21/2026 |
| AE DESIGN SOLUTION | 4 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 2 | 03/21/2026 |
| NATIONAL MAINTENANCE | 4 | 03/21/2026 |
| BUILDING BROTHERS | 4 | 03/21/2026 |
| UNITED SAFETY CONSULTANTS | 2 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TULLA CONTRACTING CORP | General Contractor | 30 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 29 | 07/08/2026 |
| JAMES E FITZGERALD INC | General Contractor | 21 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 16 | 07/08/2026 |
| H.M. HUGHES CO. INC | General Contractor | 16 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 11 | 07/08/2026 |
| PJP INSTALLERS INC | General Contractor | 9 | 07/08/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 8 | 07/08/2026 |
| WAGER CONTRACTING CO, INC | General Contractor | 7 | 07/25/2026 |
| DONALD R BORG CONSTRUCT | General Contractor | 7 | 07/08/2026 |
| JOHN GALLIN & SON, INC | General Contractor | 6 | 03/21/2026 |
| DENKO MECHANICAL INC | Fire Protection | 6 | 09/30/2026 |
| EVERGREEN MECHANICAL CORP | Plumbing | 6 | 07/29/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 5 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 5 | 07/08/2026 |
| ASHLAR MECHANICAL CORP | Fire Protection | 4 | 07/08/2026 |
| HOLT CONSTRUCTION CORP | General Contractor | 4 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 4 | 07/08/2026 |
| RICHARD WEHNER | Electrical | 4 | 03/21/2026 |
| LAB PLBG & HTG CO INC | Plumbing | 4 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 4 | 07/08/2026 |
| BENJAMIN GROUP ENTERPRIS | General Contractor | 3 | 07/08/2026 |
| JAMES M. BARB CONSTR. INC | General Contractor | 3 | 03/21/2026 |
| MARLIN MECHANICAL INC | General Contractor | 3 | 07/08/2026 |
| RETAIL PROJECT MANGEMENT | General Contractor | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| OUTSOURCE SPECIAL INSPECT | 2827 | 31 | 07/23/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 68 | 07/06/2026 |
| SKYLINE ENGINEERING, PLLC | 267 | 16 | 05/13/2026 |
| OBAID MIAN | 849 | 1 | 05/05/2026 |
| METRIC CONSULTING AND INS | 1803 | 1 | 02/20/2026 |
| MEP INSPECTIONS, INC | 1102 | 3 | 01/06/2026 |
| CATALPA SPECIAL INSPECTIO | 2004 | 11 | 01/06/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 6 | 12/29/2025 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 1 | 01/27/2023 |
| AUTOGRAPHIC CO | 1579 | 1 | 01/04/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | DENKO MECHANICAL INC | 09/29/2026 |
| DOB NOW | Plumbing | Permit Issued | EVERGREEN MECHANICAL CORP | 07/28/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | WAGER CONTRACTING CO, INC | 07/24/2026 |
| DOB NOW | General Construction | Permit Issued | WAGER CONTRACTING CO, INC | 07/24/2026 |
| DOB NOW | Structural | Signed-off | STEADFAST DEVELOPMENT AND | 05/21/2026 |
| DOB NOW | Mechanical Systems | Signed-off | DONNELLY MECHANICAL CORP | 05/05/2026 |
| DOB NOW | General Construction | Permit Issued | JAMES E FITZGERALD INC | 03/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | HM HUGHES CO INC | 01/16/2026 |
| DOB NOW | Sprinklers | Signed-off | SKINNER PLMNG & HTG CORP | 01/14/2026 |
| DOB NOW | Mechanical Systems | Signed-off | STEADFAST DEVELOPMENT AND | 01/14/2026 |
| DOB NOW | General Construction | Signed-off | STEADFAST DEVELOPMENT AND | 01/14/2026 |
| DOB NOW | Plumbing | Signed-off | SKINNER PLUMBING & HEATIN | 01/14/2026 |
| DOB NOW | Sprinklers | Permit Issued | AGGRESSIVE FIRE PROT LLC | 12/22/2025 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 12/18/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 12/18/2025 |
| DOB NOW | Structural | Permit Issued | HM HUGHES CO INC | 12/11/2025 |
| DOB NOW | General Construction | Permit Issued | HM HUGHES CO INC | 12/11/2025 |
| DOB NOW | General Construction | Permit Issued | HM HUGHES CO INC | 12/11/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | JAMES E FITZGERALD INC | 12/04/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JRM CONSTRUCTION MGMT LLC | 11/06/2025 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 11/06/2025 |
| DOB NOW | General Construction | Permit Issued | BRENER CONSTRUCTION 212 | 11/05/2025 |
| DOB NOW | General Construction | Signed-off | JRM CONSTRUCTION MGMT LLC | 11/05/2025 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 09/23/2025 |
| DOB NOW | General Construction | Signed-off | JAMES E FITZGERALD INC | 09/23/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JAMES E FITZGERALD INC | 09/22/2025 |
| DOB NOW | Mechanical Systems | Signed-off | TULLA CONTRACTING CORP | 07/23/2025 |
| DOB NOW | General Construction | Signed-off | TULLA CONTRACTING CORP | 07/23/2025 |
| DOB NOW | Sprinklers | Signed-off | AGGRESSIVE FIRE PROT LLC | 07/21/2025 |
| DOB NOW | General Construction | Permit Issued | HM HUGHES CO INC | 05/06/2025 |
| DOB NOW | General Construction | Signed-off | FINALY GENL CONTR | 03/24/2025 |
| DOB NOW | Sprinklers | Signed-off | AGGRESSIVE FIRE PROT LLC | 02/27/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JRM CONSTRUCTION MGMT LLC | 02/24/2025 |
| DOB NOW | General Construction | Signed-off | JRM CONSTRUCTION MGMT LLC | 02/24/2025 |
| DOB NOW | General Construction | Signed-off | JAMES M. BARB CONSTR. INC | 02/18/2025 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 01/30/2025 |
| DOB NOW | General Construction | Permit Issued | HM HUGHES CO INC | 12/12/2024 |
| DOB NOW | Structural | Permit Issued | HM HUGHES CO INC | 12/12/2024 |
| DOB NOW | General Construction | Signed-off | JAMES E FITZGERALD INC | 10/03/2024 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 10/01/2024 |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/25/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/30/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/20/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 03/05/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/27/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/27/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 02/03/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 12/11/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 09/04/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/28/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/28/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Underground | Certified | View ↗ |
| 08/14/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/08/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/08/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/06/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/01/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/18/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/18/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/03/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/03/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/19/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/26/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/22/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/06/2026 | Mechanical Systems | Young Suh | special |
| 07/06/2026 | Interior lighting power | Young Suh | energy_progress |
| 07/06/2026 | Lighting controls | Young Suh | energy_progress |
| 07/06/2026 | Final | Young Suh | progress |
| 07/06/2026 | HVAC-R and service water piping design and insulation | Young Suh | energy_progress |
| 07/06/2026 | Duct leakage testing, insulation and design | Young Suh | energy_progress |
| 07/06/2026 | Shutoff dampers | Young Suh | energy_progress |
| 07/06/2026 | HVAC-R and service water heating system controls | Young Suh | energy_progress |
| 07/06/2026 | Maintenance information | Young Suh | energy_progress |
| 07/06/2026 | HVAC-R and service water heating equipment | Young Suh | energy_progress |
| 06/29/2026 | Structural Steel - High Strength Bolting | JONAR MADRIAGA | special |
| 06/29/2026 | Structural Stability – Alterations of existing buildings | JONAR MADRIAGA | special |
| 06/29/2026 | Mechanical Systems | JONAR MADRIAGA | special |
| 06/29/2026 | Sprayed fire-resistant materials | JONAR MADRIAGA | special |
| 06/29/2026 | Final | JONAR MADRIAGA | progress |
| 06/29/2026 | Sprinkler Systems | JONAR MADRIAGA | special |
| 06/29/2026 | Final | JONAR MADRIAGA | progress |
| 06/29/2026 | Post-installed Anchors | JONAR MADRIAGA | special |
| 06/29/2026 | Post-installed Anchors | JONAR MADRIAGA | special |
| 06/29/2026 | Structural Steel - Welding | JONAR MADRIAGA | special |
| 06/29/2026 | Final | JONAR MADRIAGA | progress |
| 06/29/2026 | Structural Steel - Details | JONAR MADRIAGA | special |
| 06/29/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 06/29/2026 | Concrete - Cast-In-Place | JONAR MADRIAGA | special |
| 06/29/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |