Office, 20+ stories, with or without commercial
Brookfield Place
200 VESEY STREET · BIN 1000059
💬 Discuss this project
1986Year Built
54Stories
O4Building Class
BPCZoning
2,233,692 sfGross Floor Area
12Units
LL97 Covered1 Open Violation ▸FISP: SAFEFDNY Report ↗
Office, 20+ stories, with or without commercial · Owner of record: AMERICAN EXPRESS CO · 82,617 sf lot · 27.04 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 19 docs
Penthouse1p · 1 filing · 12 docs
Floor 49Under Construction6p · 2 filings · 20 docs
Floor 48Under Construction5p · 2 filings · 14 docs
Floor 471p · 1 filing · 7 docs
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42Under Construction6p · 4 filings · 20 docs
Floor 41
Floor 40
Floor 391p · 1 filing · 3 docs
Floor 38
Floor 376p · 2 filings · 20 docs
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 282p · 2 filings · 20 docs
Floor 2718p · 6 filings · 20 docs
Floor 262p · 3 filings · 20 docs
Floor 25Under Construction18p · 8 filings · 20 docs
Floor 245p · 4 filings · 20 docs
Floor 231p · 1 filing · 9 docs
Floor 221p · 1 filing · 9 docs
Floor 215p · 2 filings · 20 docs
Floor 201p · 1 filing · 13 docs
Floor 191p · 1 filing · 19 docs
Floor 18
Floor 173p · 1 filing · 11 docs
Floor 163p · 1 filing · 11 docs
Floor 15Under Construction5p · 2 filings · 20 docs
Floor 14Under Construction18p · 2 filings · 20 docs
Floor 13Under Construction9p · 1 filing · 17 docs
Floor 12Under Construction13p · 4 filings · 20 docs
Floor 11
Floor 10Under Construction13p · 3 filings · 14 docs
Floor 9Under Construction31p · 7 filings · 20 docs
Floor 813p · 1 filing · 20 docs
Floor 78p · 1 filing · 20 docs
Floor 63p · 1 filing · 9 docs
Floor 51p · 1 filing · 7 docs
Floor 437p · 20 filings · 20 docs
Floor 328p · 9 filings · 20 docs
Floor 223p · 11 filings · 20 docs
Floor 1Under Construction19p · 7 filings · 20 docs
Mezzanine1p · 1 filing · 9 docs
CellarUnder Construction9p · 2 filings · 12 docs
Basement1p · 1 filing · 20 docs
6 jobs · most recent 07/06/2026
Air Conditioning Systems Heating Systems Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/06/2026Signed-offJAMES E FITZGERALD INCAir Conditioning Systems
Cooling
Above Air MCW-021S1-4-00000-EC-FE-UF0-1B 87,100 BTU · Crac Unit ×2
05/13/2026Signed-offSTEADFAST DEVELOPMENT ANDHeating Systems, Ventilation Systems
Heating
Carrier 35E 10 kW · Vav Box ×2
Ventilation
Carrier 35E 3,500 CFM · Vav Box ×2
12/02/2025Permit IssuedJAMES E FITZGERALD INCAir Conditioning Systems
Cooling
Above Air CWU-005S1-1-00-00-SC 18,000 BTU · Condensing Unit ×1
WCH-005S1-1-00000-EC-00-DFF-WA 18,000 BTU · Fan Coil Indoor ×1
04/25/2025Signed-offJRM CONSTRUCTION MGMT LLCHeating and Air Conditioning Systems
Heat / Cool
Anemostat ESTW 23,400 BTU · Exhaust Fan ×22
09/27/2024Signed-offJAMES E FITZGERALD INCAir Conditioning Systems
Cooling
Florida Heat Pump CL-042 30,000 BTU · Wshp ×1
08/10/2023——Heating Systems
Heating
Qmark CPH05 5,120 BTU · Electric Heater ×2
12 jobs · most recent 07/23/2026
Sprinkler System
FiledStatusContractorScope
07/23/2026Permit IssuedDENKO MECHANICAL INC—
07/06/2026Signed-offPAR FIRE PROTECTION LLCSprinkler System
05/13/2026Signed-offSKINNER PLMNG & HTG CORP150 heads
11/25/2025Permit IssuedAGGRESSIVE FIRE PROT LLCSprinkler System
10/31/2025Permit IssuedABCO-PEERLESS SPRKLR CORPSprinkler System
07/29/2025Signed-offAGGRESSIVE FIRE PROT LLC32 heads
04/25/2025Signed-offAGGRESSIVE FIRE PROT LLCSprinkler System
09/27/2024Signed-offPAR FIRE PROTECTION LLC—
06/28/2024Signed-offSIRINA FIRE PROT CORP12 heads
08/10/2023——7 heads
08/10/2023——2 outlets
01/27/2023Signed-offEVERGREEN MECHANICAL CORP—
6 jobs · most recent 07/06/2026
Water/Sanitary
FiledStatusContractorScope
07/06/2026———
05/13/2026Signed-offSKINNER PLUMBING & HEATINWater/Sanitary
07/29/2025———
04/25/2025Signed-offMAC FELDER INCWater/Sanitary
06/28/2024Signed-offASHLAND PLUMBING CORPWater/Sanitary
02/04/2020——Water/Sanitary
25 jobs · most recent 01/15/2026
General Wiring
FiledStatusContractorScope
01/15/2026Permit IssuedM.C. ELECTRICAL NY INCGeneral Wiring
11/25/2025CompleteROBERT B SAMUELS, INCGeneral Wiring
11/07/2025Permit IssuedNORCAL ELECTRIC LLCGeneral Wiring
10/17/2025CompleteKLEINKNECHT ELEC. CO.,INCGeneral Wiring
10/08/2025CompleteHATZEL AND BUEHLER, INCGeneral Wiring
09/26/2025CompleteFOREST ELECTRIC CORP.—
12/11/2024CompletePREMIER ELECTRIC, INCGeneral Wiring
10/15/2024CompleteALLAN BRITEWAY ELECTRICALGeneral Wiring
08/06/2024Pending PaymentALLAN BRITEWAY ELECTRICALGeneral Wiring
06/19/2024CompleteROBERT B SAMUELS, INCGeneral Wiring
05/13/2024Permit IssuedE-J ELEC. INSTALLATION COGeneral Wiring
02/07/2024CompleteABSOLUTE ELEC'L CONTRG OFGeneral Wiring
01/04/2024CompleteTOP SHELF ELECTRIC CORP—
06/19/2023CompleteRAIDEN ELECTRIC LLCGeneral Wiring
02/18/2023CompleteABSOLUTE ELEC'L CONTRG OFGeneral Wiring
3 jobs · most recent 07/23/2026
Steel Concrete
FiledStatusContractorScope
07/23/2026Permit IssuedDENKO MECHANICAL INCSteel, Concrete
05/13/2026Signed-offSTEADFAST DEVELOPMENT ANDSteel
03/18/2022Permit IssuedTULLA CONTRACTING CORPSteel, Concrete
Building Lifecycle
All (300)Filed (75)Permit Issued (80)Signed Off (32)Facade (FISP) (3)Violation (4)Inspection (60)Objection (16)Special Inspection (30)
09/29/2026
Permit issued — Sprinklers
M01424262-S3-EW-SP
08/25/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2026
Signed off — Alteration
Mechanical work as shown on plans
M01264393-S2
07/28/2026
Permit issued — Plumbing
M01424262-S2-PL
07/24/2026
Permit issued — General Construction
M01424262-I1-GC
07/24/2026
Permit issued — Mechanical Systems
M01424262-S1-MS
07/23/2026
Filed — Alteration
Sprinkler work as shown on plans filed herewith.
M01424262-S4
07/22/2026
Filed — Alteration
Sprinkler work as shown on plans filed herewith.
M01424262-S3
07/22/2026
Filed — Alteration
Sprinkler work as shown on plans filed herewith.
M01424262-S2
07/22/2026
Filed — Alteration
Sprinkler work as shown on plans filed herewith.
M01424262-S1
07/22/2026
Filed — Alteration
Sprinkler work as shown on plans filed herewith.
M01424262-I1
07/09/2026
Signed off — Alteration
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy.
M01308468-S4
07/08/2026
Signed off — Alteration
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy.
M01308468-S3
07/06/2026
Filed — Alteration
Mechanical work as shown on plans
M01264393-P2
07/06/2026
Special inspection requirement — Interior lighting power
Young Suh
07/06/2026
Special inspection requirement — Lighting controls
Young Suh
07/06/2026
Special inspection requirement — Shutoff dampers
Young Suh
07/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
Young Suh
07/06/2026
Special inspection requirement — Final
Young Suh
07/06/2026
Special inspection requirement — Mechanical Systems
Young Suh
07/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
07/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
07/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
07/06/2026
Special inspection requirement — Maintenance information
Young Suh
06/29/2026
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
06/29/2026
Special inspection requirement — Final
JONAR MADRIAGA
06/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
06/29/2026
Special inspection requirement — Final
JONAR MADRIAGA
06/29/2026
Special inspection requirement — Structural Steel - High Strength Bolting
JONAR MADRIAGA
06/29/2026
Special inspection requirement — Structural Steel - Details
JONAR MADRIAGA
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
06/29/2026
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
06/29/2026
Special inspection requirement — Structural Steel - Welding
JONAR MADRIAGA
06/29/2026
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
06/29/2026
Special inspection requirement — Sprayed fire-resistant materials
JONAR MADRIAGA
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
06/29/2026
Special inspection requirement — Concrete - Cast-In-Place
JONAR MADRIAGA
06/29/2026
Special inspection requirement — Final
JONAR MADRIAGA
06/29/2026
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
06/22/2026
Signed off — Alteration
Air conditioning unit replacement on the 26th floor. No change in use egress and occupancy.
M01353120-I1
06/16/2026
Special inspection requirement — Shutoff dampers
Young Suh
06/16/2026
Special inspection requirement — Lighting controls
Young Suh
06/16/2026
Special inspection requirement — Interior lighting power
Young Suh
06/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
06/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
06/09/2026
Signed off — Alteration
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy.
M01308468-I1
06/08/2026
Signed off — Alteration
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy.
M01308468-S1
06/04/2026
Signed off — Alteration
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy.
M01308468-S2
05/21/2026
Permit issued — Structural
M01308468-S4-ST
05/13/2026
Filed — Alteration
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy.
M01308468-P1
05/05/2026
Filed — Alteration
Air conditioning unit replacement on the 26th floor. No change in use egress and occupancy.
M01353120-I1
05/05/2026
Permit issued — Mechanical Systems
M01353120-I1-MS
04/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/23/2026
Signed off — Alteration
Mechanical work as show on plans
M01139162-S2
04/21/2026
Filed — Alteration
Mechanical work as shown on plans
M01264393-P1
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/07/2026
Signed off — Alteration
Mechanical work as show on plans
M01139162-S1
03/20/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/05/2026
Permit issued — General Construction
M01324895-I1-GC
03/05/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CBRE38809/30/2026
BROOKFIELD PROPERTIES3507/08/2026
SA HOSPITALITY GROUP607/08/2026
BANK INDONESIA407/08/2026
AIG GLOBAL REAL ESTATE203/22/2026
GROUP ENTERPRIS BENJAMIN303/22/2026
TO OWNER OF103/22/2026
TO THE OWNER OF 260 VESEY103/22/2026
CELESTIAL CLEANERS, INC103/22/2026
MANAGEMENT BUILDING103/22/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TULLA CONTRACTING CORPGeneral Contractor3007/08/2026
JRM CONSTRUCTION MGMT LLCGeneral Contractor2907/08/2026
JAMES E FITZGERALD INCGeneral Contractor2107/08/2026
JT MAGEN & COMPANY INCGeneral Contractor1607/08/2026
H.M. HUGHES CO. INCGeneral Contractor1607/08/2026
SIRINA FIRE PROT CORPFire Protection1107/08/2026
PJP INSTALLERS INCGeneral Contractor907/08/2026
AGGRESSIVE FIRE PROT LLCFire Protection807/08/2026
WAGER CONTRACTING CO, INCGeneral Contractor707/25/2026
DONALD R BORG CONSTRUCTGeneral Contractor707/08/2026
JOHN GALLIN & SON, INCGeneral Contractor603/21/2026
DENKO MECHANICAL INCFire Protection609/30/2026
EVERGREEN MECHANICAL CORPPlumbing607/29/2026
ABCO-PEERLESS SPRKLR CORPFire Protection507/08/2026
PAR FIRE PROTECTION LLCFire Protection507/08/2026
ASHLAR MECHANICAL CORPFire Protection407/08/2026
HOLT CONSTRUCTION CORPGeneral Contractor403/21/2026
SPRING SCAFFOLDING LLCGeneral Contractor407/08/2026
RICHARD WEHNERElectrical403/21/2026
LAB PLBG & HTG CO INCPlumbing407/08/2026
PAR PLUMBING CO., INCPlumbing407/08/2026
BENJAMIN GROUP ENTERPRISGeneral Contractor307/08/2026
JAMES M. BARB CONSTR. INCGeneral Contractor303/21/2026
MARLIN MECHANICAL INCGeneral Contractor307/08/2026
RETAIL PROJECT MANGEMENTGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT28273107/23/2026
ALAN MARGOLIN & ASSOC4236807/06/2026
SKYLINE ENGINEERING, PLLC2671605/13/2026
OBAID MIAN849105/05/2026
METRIC CONSULTING AND INS1803102/20/2026
MEP INSPECTIONS, INC1102301/06/2026
CATALPA SPECIAL INSPECTIO20041101/06/2026
MILROSE CONSULTANTS LLC2003612/29/2025
ATLANTIC ENGINEERINGLABOR1381101/27/2023
AUTOGRAPHIC CO1579101/04/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedDENKO MECHANICAL INC09/29/2026
DOB NOWPlumbingPermit IssuedEVERGREEN MECHANICAL CORP07/28/2026
DOB NOWMechanical SystemsPermit IssuedWAGER CONTRACTING CO, INC07/24/2026
DOB NOWGeneral ConstructionPermit IssuedWAGER CONTRACTING CO, INC07/24/2026
DOB NOWStructuralSigned-offSTEADFAST DEVELOPMENT AND05/21/2026
DOB NOWMechanical SystemsSigned-offDONNELLY MECHANICAL CORP05/05/2026
DOB NOWGeneral ConstructionPermit IssuedJAMES E FITZGERALD INC03/05/2026
DOB NOWMechanical SystemsPermit IssuedHM HUGHES CO INC01/16/2026
DOB NOWSprinklersSigned-offSKINNER PLMNG & HTG CORP01/14/2026
DOB NOWMechanical SystemsSigned-offSTEADFAST DEVELOPMENT AND01/14/2026
DOB NOWGeneral ConstructionSigned-offSTEADFAST DEVELOPMENT AND01/14/2026
DOB NOWPlumbingSigned-offSKINNER PLUMBING & HEATIN01/14/2026
DOB NOWSprinklersPermit IssuedAGGRESSIVE FIRE PROT LLC12/22/2025
DOB NOWGeneral ConstructionPermit IssuedJT MAGEN & COMPANY INC12/18/2025
DOB NOWMechanical SystemsPermit IssuedJT MAGEN & COMPANY INC12/18/2025
DOB NOWStructuralPermit IssuedHM HUGHES CO INC12/11/2025
DOB NOWGeneral ConstructionPermit IssuedHM HUGHES CO INC12/11/2025
DOB NOWGeneral ConstructionPermit IssuedHM HUGHES CO INC12/11/2025
DOB NOWMechanical SystemsPermit IssuedJAMES E FITZGERALD INC12/04/2025
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC11/06/2025
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP11/06/2025
DOB NOWGeneral ConstructionPermit IssuedBRENER CONSTRUCTION 21211/05/2025
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC11/05/2025
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE09/23/2025
DOB NOWGeneral ConstructionSigned-offJAMES E FITZGERALD INC09/23/2025
DOB NOWMechanical SystemsSigned-offJAMES E FITZGERALD INC09/22/2025
DOB NOWMechanical SystemsSigned-offTULLA CONTRACTING CORP07/23/2025
DOB NOWGeneral ConstructionSigned-offTULLA CONTRACTING CORP07/23/2025
DOB NOWSprinklersSigned-offAGGRESSIVE FIRE PROT LLC07/21/2025
DOB NOWGeneral ConstructionPermit IssuedHM HUGHES CO INC05/06/2025
DOB NOWGeneral ConstructionSigned-offFINALY GENL CONTR03/24/2025
DOB NOWSprinklersSigned-offAGGRESSIVE FIRE PROT LLC02/27/2025
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC02/24/2025
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC02/24/2025
DOB NOWGeneral ConstructionSigned-offJAMES M. BARB CONSTR. INC02/18/2025
DOB NOWSprinklersSigned-offABCO-PEERLESS SPRKLR CORP01/30/2025
DOB NOWGeneral ConstructionPermit IssuedHM HUGHES CO INC12/12/2024
DOB NOWStructuralPermit IssuedHM HUGHES CO INC12/12/2024
DOB NOWGeneral ConstructionSigned-offJAMES E FITZGERALD INC10/03/2024
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE10/01/2024
+ 60 more permits on file
▾Field Inspections (DOB CAP) — 106
DateTypeResultReport
08/25/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/05/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/27/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/03/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/11/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
09/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/28/2025Certified Sprinkler-SP-Piping Dry/Wet-UndergroundCertifiedView ↗
08/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 106.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/06/2026Mechanical SystemsYoung Suhspecial
07/06/2026Interior lighting powerYoung Suhenergy_progress
07/06/2026Lighting controlsYoung Suhenergy_progress
07/06/2026FinalYoung Suhprogress
07/06/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
07/06/2026Duct leakage testing, insulation and designYoung Suhenergy_progress
07/06/2026Shutoff dampersYoung Suhenergy_progress
07/06/2026HVAC-R and service water heating system controlsYoung Suhenergy_progress
07/06/2026Maintenance informationYoung Suhenergy_progress
07/06/2026HVAC-R and service water heating equipmentYoung Suhenergy_progress
06/29/2026Structural Steel - High Strength BoltingJONAR MADRIAGAspecial
06/29/2026Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
06/29/2026Mechanical SystemsJONAR MADRIAGAspecial
06/29/2026Sprayed fire-resistant materialsJONAR MADRIAGAspecial
06/29/2026FinalJONAR MADRIAGAprogress
06/29/2026Sprinkler SystemsJONAR MADRIAGAspecial
06/29/2026FinalJONAR MADRIAGAprogress
06/29/2026Post-installed AnchorsJONAR MADRIAGAspecial
06/29/2026Post-installed AnchorsJONAR MADRIAGAspecial
06/29/2026Structural Steel - WeldingJONAR MADRIAGAspecial
06/29/2026FinalJONAR MADRIAGAprogress
06/29/2026Structural Steel - DetailsJONAR MADRIAGAspecial
06/29/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
06/29/2026Concrete - Cast-In-PlaceJONAR MADRIAGAspecial
06/29/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
Latest 25 of 150.
▾Documents — 10,383 on file (BIS + DOB NOW)
▸Plans & Drawings220
▸DOB NOWPlans/Sketch158
09/06/2026M00016783-I1Request digital key ↗
09/06/2026M00080943-I1Request digital key ↗
09/06/2026M00081659-I1Request digital key ↗
Showing 3 of 158 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler15
09/05/2026M00258420-I1Request digital key ↗
09/05/2026M00296623-P1Request digital key ↗
09/05/2026M00296623-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems15
09/05/2026M00202118-I1Request digital key ↗
09/05/2026M00214629-I1Request digital key ↗
09/05/2026M00238369-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Plumbing13
09/05/2026M00202355-I1Request digital key ↗
09/05/2026M00214672-I1Request digital key ↗
09/05/2026M00258404-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly12
09/05/2026M00145127-I1Request digital key ↗
09/05/2026M00272950-I1Request digital key ↗
Showing 2 of 12 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00457384-I1Request digital key ↗
09/04/2026M00457384-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00192703-I1Request digital key ↗
09/05/2026M00192711-I1Request digital key ↗
▸Applications & Permits1,916
▸BISPLAN / WORK APPROVAL APPLICATION1,197
10/22/2025100606621Open ↗
12/14/2023140985281Open ↗
12/08/2023123699293Open ↗
Showing 3 of 1,197 on file for this type
▸BISWORK PERMIT APPLICATION693
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 693 on file for this type
▸BISPLACE OF ASSEMBLY16
05/24/2024103353933Open ↗
03/08/2024103353933Open ↗
03/06/2024103353933Open ↗
Showing 3 of 16 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications5
01/27/2023103064336Open ↗
01/27/2023103115013Open ↗
11/25/2022103048998Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
10/04/2022123853179Open ↗
Showing 1 of 5 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISFLOOD ZONE DESIGN CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWFlood Zone Design Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFlood Zone Compliance1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications2,806
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1,491
05/24/2024103353933Open ↗
05/24/2024103353933Open ↗
Showing 2 of 1,491 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST298
10/04/2022123853179Open ↗
Showing 1 of 298 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT247
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 247 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature221
09/06/2026M00016783-I1Open ↗
09/05/2026M00145127-I1Open ↗
09/05/2026M00202355-I1Open ↗
Showing 3 of 221 on file for this type
▸DOB NOWProgress Inspector Seal & Signature194
09/30/2026M00296605-P1Open ↗
09/28/2026M08046187-P1Open ↗
09/28/2026M08046187-P1Open ↗
Showing 3 of 194 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM175
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 175 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature155
09/29/2026M00683808-P1Open ↗
09/29/2026M00683808-P1Open ↗
09/28/2026M08046187-P1Open ↗
Showing 3 of 155 on file for this type
▸BISPC FULL REPORT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Trade Schedules & Equipment780
▸BISSELF-CERT PLUMBING NOTICE207
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 207 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE202
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 202 on file for this type
▸BISSCHEDULE B - PLUMBING141
04/20/2023123853179Open ↗
09/16/2022123853179Open ↗
Showing 2 of 141 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA125
08/15/2023123252737Open ↗
04/12/2023122780605Open ↗
Showing 2 of 125 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8555
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 55 on file for this type
▸BISEQUIPMENT USE PERMITS27
10/04/2023123715685Open ↗
Showing 1 of 27 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT16
10/04/2023123715685Open ↗
Showing 1 of 16 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-847
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos707
▸BISASBESTOS: CERTIFICATION (DEP ACP5)335
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 335 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report196
09/06/2026M00016783-I1Open ↗
09/05/2026M00202355-I1Open ↗
09/05/2026M00214672-P1Open ↗
Showing 3 of 196 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'161
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 161 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance455
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS252
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 252 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS100
10/04/2023123715685Open ↗
Showing 1 of 100 on file for this type
▸BISTECHNICAL REPORT: ENERGY29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY25
10/04/2023123715685Open ↗
Showing 1 of 25 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.24
09/04/2026M00457384-I1Open ↗
09/03/2026M00535186-I1Open ↗
09/03/2026M00561782-I1Open ↗
Showing 3 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)12
11/06/2023123715685Open ↗
10/11/2023140985281Open ↗
04/10/2023140919978Open ↗
Showing 3 of 12 on file for this type
▸BISTR8: Energy Code Progress Inspections9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Inspections & Test Reports147
▸BISTECHNICAL REPORT: RESPONSIBILITY105
02/09/2024103353933Open ↗
01/08/2024103353933Open ↗
11/21/2023121775622Open ↗
Showing 3 of 105 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)4
11/21/2023121775622Open ↗
Showing 1 of 4 on file for this type
▸Approvals, Objections & Sign-offs967
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST465
02/12/2025123252737Open ↗
02/12/2025123723177Open ↗
12/15/2023140985281Open ↗
Showing 3 of 465 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION197
05/24/2024103353933Open ↗
05/24/2024103353933Open ↗
05/24/2024103353933Open ↗
Showing 3 of 197 on file for this type
▸BISADMINISTRATIVE OBJECTIONS174
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 174 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)34
09/05/2026M00202355-I1Open ↗
09/05/2026M00258420-I1Open ↗
09/04/2026M00202397-I1Open ↗
Showing 3 of 34 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE30
11/27/2023123699293Open ↗
11/08/2023104494307Open ↗
11/08/2023123699293Open ↗
Showing 3 of 30 on file for this type
▸BISSUPERSEDING LETTER23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)22
09/05/2026M00202355-I1Open ↗
09/05/2026M00258420-I1Open ↗
09/04/2026M00202397-I1Open ↗
Showing 3 of 22 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFINAL7
10/11/2023140985281Open ↗
04/10/2023140919978Open ↗
Showing 2 of 7 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWNYS DEC Tidal Wetlands Approval1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership1,054
▸BISCOST AFFIDAVIT1,028
10/13/2023123715685Open ↗
10/04/2023123715685Open ↗
Showing 2 of 1,028 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW326
09/19/2024121775622Open ↗
03/29/2024123723177Open ↗
03/29/2024123252737Open ↗
Showing 3 of 26 on file for this type
▸Filing & Intake Forms1,146
▸BISEFILING COVER SHEET553
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 553 on file for this type
▸BISADDITIONAL INFORMATION339
12/08/2023123699293Open ↗
12/04/2023103353933Open ↗
11/17/2023104494307Open ↗
Showing 3 of 339 on file for this type
▸BISBOROUGH INTAKE FORM230
05/24/2024103353933Open ↗
Showing 1 of 230 on file for this type
▸BISeFiling Job Application Cover Sheet24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸Other Documents79
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION57
12/13/2022102617401Open ↗
12/13/2022102617401Open ↗
Showing 2 of 57 on file for this type
▸BISSupporting Document: Fee Exempt5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWAlternate Plan 111
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWNYS DEC Tidal Wetlands Map1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 91
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 71
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 131
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 81
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 61
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 101
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 121
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type