← Back
Elevator apt, semi-fireproof without stores
200 WEST 113 STREET
MANHATTAN · Harlem (South) · BIN 1055119
💬 Discuss this project
1920Year Built
7Stories
D1Building Class
R7-2Zoning
43,946 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized51 Open Violations 48 unresolved · 3 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: LISA DAWN APT INC · 7,592 sf lot · 5.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipment
Permit Issued — active, not yet Signed-off
Site & exteriorUnder Construction9p · 4 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LISA DAWN APT INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC109/17/2025
WALSH ENGINEERING PLLC107/30/2025
JOSEPH FARAHNIK CONSULTING ENGINEER104/20/2021
GREEN DESIGN106/04/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIGGING CONSULTANTS203/21/2026
PCS ENGINEERING103/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DOLMEN DEVELOPERS, INCGeneral Contractor303/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
OPTIMUM BUILDING RESTORATIONGeneral Contractor207/05/2026
DIFUSCO, ALFONSOElectrical103/21/2026
DUNN, JEREMYElectrical103/21/2026
JEFFERSON NECKLESElectrical103/21/2026
TOUGH STALLION LLCElectrical103/21/2026
WAYDE GILSTONElectrical103/21/2026
BIRNBAUM, ALANElectrical103/21/2026
YARKS NYC INCGeneral Contractor104/09/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
CRUGNALE, MICHAELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WALSH ENGINEERING PLLC9393209/09/2025
JOSEPH FARAHNIK CONSULTIN3544104/20/2021
Building Lifecycle
All (94)Filed (6)Permit Issued (7)Signed Off (3)Facade (FISP) (10)Violation (60)Inspection (1)Objection (2)Special Inspection (5)
07/08/2026
Permit issued — Suspended Scaffold
M01348510-I1-SC
06/02/2026
Objection raised — Other
06/02/2026
Objection resolved — Resolved
05/20/2026
Filed — Alteration
Suspended Scaffold for Facade Restoration as Shown on Plans
M01348510-I1
05/13/2026
Signed off — Alteration
Suspended Scaffold for Facade Restoration as Shown on Plans
M01274876-I1
03/04/2026
Permit issued — General Construction
M01256628-I1-GC
01/19/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/01/2025
Violation issued (HPD, closed)
B
11/01/2025
Violation issued (HPD, closed)
B
11/01/2025
Violation issued (HPD, closed)
B
11/01/2025
Violation issued (HPD, closed)
B
10/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
B
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
B
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
C
09/22/2025
Permit issued — Suspended Scaffold
M01274876-I1-SC
09/18/2025
Permit issued — Sidewalk Shed
M01285615-I1-SH
09/17/2025
Filed — Alteration
M01285615-I1
09/09/2025
Filed — Alteration
Suspended Scaffold for Facade Restoration as Shown on Plans
M01274876-I1
08/21/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
08/21/2025
Special inspection requirement — Post-installed Anchors
Brennan Walsh
08/20/2025
Permit issued — General Construction
M01256628-I1-GC
07/30/2025
Filed — Alteration
FACADE RESTORATION AS SHOWN ON PLANS
M01256628-I1
06/17/2025
Violation issued (HPD, closed)
C
01/16/2025
Violation issued (HPD, open)
B
06/15/2024
Violation issued (HPD, closed)
A
06/15/2024
Violation issued (HPD, open)
C
06/15/2024
Violation issued (HPD, open)
C
06/15/2024
Violation issued (HPD, open)
B
06/15/2024
Violation issued (HPD, closed)
A
06/15/2024
Violation issued (HPD, closed)
A
05/02/2024
Violation issued (ECB, open)
Local Law
04/01/2024
Violation issued (HPD, closed)
A
02/11/2024
Violation issued (HPD, closed)
C
02/11/2024
Violation issued (HPD, closed)
C
01/13/2024
Violation issued (HPD, open)
B
01/13/2024
Violation issued (HPD, closed)
C
01/13/2024
Violation issued (HPD, open)
B
01/13/2024
Violation issued (HPD, open)
C
10/29/2023
Violation issued (HPD, closed)
B
10/29/2023
Violation issued (HPD, closed)
C
10/29/2023
Violation issued (HPD, closed)
C
10/19/2023
Violation issued (HPD, closed)
C
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedOPTIMUM BUILDING RESTORA07/08/2026
DOB NOWGeneral ConstructionPermit IssuedOPTIMUM BUILDING RESTORAT03/04/2026
DOB NOWSuspended ScaffoldSigned-offSPD CONSTRUCTION CORP09/22/2025
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC09/18/2025
DOB NOWGeneral ConstructionPermit IssuedOPTIMUM BUILDING RESTORAT08/20/2025
DOB NOWGeneral ConstructionSigned-offDOLMEN DEVELOPERS, INC04/29/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC06/08/2020
BISPLISSUEDP.S.I. MECHANICAL01/28/2021
BISOTISSUEDLEMA AND SONS CORPORATION06/15/2020
BISOTISSUEDXINLI.CONSTRUCTION LLC11/19/2019
BISOTISSUEDACE CHIMNEY & FIREPLACE04/05/2019
BISOTISSUEDACE CHIMNEY & FIREPLACE01/02/2019
BISPLISSUEDP.S.I. MECHANICAL01/02/2019
BISOTISSUEDNEW LIFE MASONRY & WATERPROOFING04/24/2008
BISEQISSUEDNEWLIFE MASONRY AND WATERPROOFIN04/18/2008
BISEQISSUEDNEWLIFE MASONRY AND WATERPROOFIN01/09/2008
BISEQISSUEDSTEEL INDUSTRIES, INC.12/04/2007
BISOTISSUEDNEW LIFE MASONRY & WATERPROOFING10/03/2007
BISEQISSUEDSTEEL INDUSTRIES, INC.10/02/2007
BISPLISSUEDG.B. & SON, INC10/24/2005
BISOTISSUEDALL COUNTY RESTORATION06/13/2005
BISPLISSUEDSEAVIEW PLUMBING, INC.04/15/2005
BISOTISSUEDALL COUNTY REST. INC.04/27/2004
BISOTISSUEDALL COUNTY RESTORATION04/14/2004
BISEQISSUEDCOLGATE SCAFFOLDING AND EQUIP01/15/2004
BISFBISSUEDCOURT OIL HEATING CORP12/05/1996
3 projects · most recent 10/03/2025
FiledStatusContractorScope
10/03/2025Permit IssuedSPICE ELECTRIC COMPANY—
01/26/2023CompleteGILSTON BROTHERS ELECT'L1 meters
06/04/2020CompleteBOROWIDE ELECT'L CONTR'S—
2 projects · most recent 05/20/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/20/2026Permit IssuedOPTIMUM BUILDING RESTORASuspended Scaffold (SC)
09/09/2025Signed-offSPD CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/19/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
08/21/2025Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
08/21/2025Post-installed AnchorsBrennan Walshspecial
04/16/2021Structural Stability – Alterations of existing buildingsJoseph Farahnikspecial
05/27/2020FinalBRIAN T. O'CONNORprogress
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/03/2026M00505129-I1Request digital key ↗
08/22/2026M01256628-I1Request digital key ↗
08/21/2026M01274876-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00352149-I1Request digital key ↗
▸Applications & Permits16
▸BISWORK PERMIT APPLICATION9
01/29/2021140824730Open ↗
06/15/2020140889108Open ↗
11/19/2019123097353Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
11/19/2019123097353Open ↗
06/03/2019140824730Open ↗
04/15/2019140824730Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications22
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
11/19/2019123097353Open ↗
03/21/2019140824730Open ↗
03/20/2019140824730Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026M01285615-I1Open ↗
08/13/2026M01256628-I1Open ↗
08/13/2026M00505129-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00505129-I1Open ↗
08/31/2026M01348510-I1Open ↗
08/29/2026M01274876-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
11/19/2019123097353Open ↗
01/08/2008110042329Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/19/2019123097353Open ↗
12/31/2018140824730Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/08/2008110042329Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/31/2018140824730Open ↗
▸BISPC FULL REPORT1
01/08/2008110042329Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/09/2020140889108Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/31/2018140824730Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026M00352149-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING1
12/31/2018140824730Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/31/2018140824730Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
06/03/2019140824730Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
03/09/2020140889108Open ↗
11/19/2019123097353Open ↗
12/31/2018140824730Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00352149-I1Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/09/2020140889108Open ↗
12/31/2018140824730Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M00505129-I1Open ↗
08/13/2026M01256628-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/08/2008110042329Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/15/2020123097353Open ↗
06/15/2020140889108Open ↗
03/09/2020140889108Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
12/15/2020123097353Open ↗
11/18/2020140889108Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/16/2020140889108Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/19/2019123097353Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/31/2018140824730Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
12/15/2020123097353Open ↗
12/15/2020123097353Open ↗
11/18/2020140889108Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/15/2020123097353Open ↗
11/18/2020140889108Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/08/2008110042329Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
12/15/2020123097353Open ↗
11/18/2020140889108Open ↗
03/09/2020140889108Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/16/2020140889108Open ↗
▸Filing & Intake Forms8
▸BISBOROUGH INTAKE FORM5
01/29/2021140824730Open ↗
11/19/2019140874935Open ↗
06/03/2019140824730Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
03/09/2020140889108Open ↗
12/31/2018140824730Open ↗
▸BISEFILING COVER SHEET1
11/19/2019123097353Open ↗
▸Other Documents5
▸DOB NOWManufacturer's Specifications2
08/15/2026M01348510-I1Open ↗
08/13/2026M01274876-I1Open ↗
▸DOB NOWCalculations2
08/15/2026M01348510-I1Open ↗
08/13/2026M01274876-I1Open ↗
▸BISSIDEWALK SHED AND SCAFFOLDING.1
06/15/2020140889108Open ↗