| Owner | Filings | Most Recent |
|---|---|---|
| RHODES BUILDING MANAGEMENT | 31 | 09/08/2026 |
| 200 WEST 72ND OWNER | 426 | 08/29/2026 |
| SKYLINE SCAFFOLDING GROUP | 8 | 07/08/2026 |
| DOUGLAS ELLIMAN PROPERTY MANAGEMENT | 6 | 03/22/2026 |
| WALGREENS COMPANY | 3 | 03/22/2026 |
| 200-212 WEST 72ND ST COND | 6 | 03/22/2026 |
| MANHATTAN D ENTERPRISES | 1 | 03/22/2026 |
| 200-212 WEST 72ND ST. CON | 7 | 03/22/2026 |
| GOTHAM CONSTRUCTION COMPA | 29 | 03/22/2026 |
| COTHAN CONSTRUCTION COMPA | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| MG ENGINEERING D.P.C. | 111 | 08/26/2026 |
| FREDERICK TAYLOR ASSOC - ARCH, PC | 2 | 08/25/2026 |
| WSP | 2 | 07/22/2026 |
| DAVID CHAGNON ARCHITECTURAL DESIGN | 1 | 05/01/2026 |
| HITE STUDIO ARCHITECTURE PC | 3 | 10/29/2025 |
| CETRARUDDY ARCHITECTURE DPC | 20 | 09/16/2024 |
| NELSON ARCHITECTURE &INTERIORS, INC | 2 | 03/26/2024 |
| AECOM USA, INC. | 2 | 01/22/2024 |
| LUKE LICALZI, P.E., P.C. | 3 | 10/11/2023 |
| INFINITY ENGINEERING GROUP, LLC. | 1 | 07/24/2023 |
| HPL ENGINEERING P.C. | 2 | 06/19/2023 |
| OPENSHOP ARCHITECTURE | 1 | 05/25/2023 |
| MARTOS ENGINEERING | 1 | 01/03/2023 |
| SHAABAN ENGINEERING, LLC | 4 | 03/23/2022 |
| JOEL PHAGOO P.E. PLLC | 3 | 10/08/2021 |
| PATUXENT ENGINEERING LLC | 3 | 08/31/2021 |
| LEON SKVIRSKY PE | 1 | 05/16/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| PATUXENT ENGINEERING | 6 | 03/21/2026 |
| KAZAM CONSULTANTS | 8 | 03/21/2026 |
| DYNAMIC BUILDING CONSULTANTS | 6 | 03/21/2026 |
| PROJECT EXPEDITERS CONSULTING CO. | 6 | 03/21/2026 |
| JM ZONING, LLC. | 43 | 03/21/2026 |
| L & J DESIGN GROUP | 6 | 03/21/2026 |
| JM CONSULTANT STUDIO | 4 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 6 | 03/21/2026 |
| BUILDING BROTHERS | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| EG MUNOZ CONSTRUCTION.LLC | General Contractor | 81 | 07/08/2026 |
| DOWNTOWN PLBG & HTG INC | Plumbing | 47 | 07/08/2026 |
| A & E MECHANICAL CORP | Fire Protection | 13 | 07/08/2026 |
| SKYLINE SCAFFOLDING GROUP | General Contractor | 8 | 07/08/2026 |
| MANHATTAN D ENTERPRISES | General Contractor | 5 | 07/08/2026 |
| MLB ELECTRICAL CORP | Electrical | 4 | 03/22/2026 |
| ELITE PAINTING & MAINTENANCE | General Contractor | 4 | 03/21/2026 |
| GREGOR INDUSTRIES INC | General Contractor | 4 | 07/08/2026 |
| BALATON CONSULTING LLC | Scaffold | 4 | 07/08/2026 |
| URBAN INTELLIGENCE, INC | General Contractor | 3 | 03/21/2026 |
| TOWN & GARDENS LTD | General Contractor | 2 | 03/21/2026 |
| H DIAS INC | General Contractor | 2 | 03/21/2026 |
| M.T.ELECTRIC CORP | Electrical | 1 | 03/22/2026 |
| INTERCITY PLBG & HTG CORP | Plumbing | 1 | 07/08/2026 |
| KAPNAG HTG & PLBG CORP | Plumbing | 1 | 07/08/2026 |
| PAUL SIGNS | Scaffold | 1 | 07/08/2026 |
| RETAIL PROJECT MANGEMENT | General Contractor | 1 | 07/08/2026 |
| REMODELING SPACE NY LLC | General Contractor | 1 | 06/28/2026 |
| VALNICK | General Contractor | 1 | 07/08/2026 |
| A.M.N. CORPORATION | Plumbing | 1 | 06/28/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| QUALITY TESTING, LLC | 7344 | 137 | 08/26/2026 |
| GREGORY V. PEROTTO, P.E. | 947 | 2 | 08/25/2026 |
| THE RAJIV INC | 9613 | 1 | 09/22/2025 |
| JOSEPH MARTINES PE, PLLC | 1428 | 3 | 03/26/2024 |
| HPL ENGINEERING PC | 5613 | 2 | 06/19/2023 |
| CHRISTIAN L. MARTOS ENGIN | 5965 | 1 | 01/03/2023 |
| DOKA ENGINEERING PC | 1158 | 12 | 12/13/2022 |
| JOEL PHAGOO ,PE, PLLC | 2416 | 1 | 10/08/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | VALNICK LLC | 06/09/2026 |
| DOB NOW | Plumbing | Permit Issued | A.M.N. CORPORATION | 06/02/2026 |
| DOB NOW | General Construction | Permit Issued | REMODELING SPACE NY LLC | 05/21/2026 |
| DOB NOW | General Construction | Signed-off | RETAIL PROJECT MANGEMENT | 05/12/2026 |
| DOB NOW | Plumbing | Permit Issued | DOWNTOWN PLBG & HTG INC | 03/26/2025 |
| DOB NOW | Plumbing | Permit Issued | DOWNTOWN PLBG & HTG INC | 09/16/2024 |
| DOB NOW | General Construction | Permit Issued | EG MUNOZ CONSTRUCTION.LLC | 08/07/2024 |
| DOB NOW | General Construction | Signed-off | EG MUNOZ CONSTRUCTION.LLC | 06/17/2024 |
| DOB NOW | Sprinklers | Signed-off | A&E MECHANICAL CORP | 06/06/2024 |
| DOB NOW | Sprinklers | Signed-off | A&E MECHANICAL CORP | 04/16/2024 |
| DOB NOW | Plumbing | Signed-off | DOWNTOWN PLBG & HTG INC | 03/21/2024 |
| DOB NOW | Plumbing | Signed-off | DOWNTOWN PLBG & HTG INC | 03/20/2024 |
| DOB NOW | Plumbing | Permit Issued | DOWNTOWN PLBG & HTG INC | 03/20/2024 |
| DOB NOW | Plumbing | Permit Issued | DOWNTOWN PLBG & HTG INC | 03/15/2024 |
| DOB NOW | Plumbing | Permit Issued | DOWNTOWN PLBG & HTG INC | 03/14/2024 |
| DOB NOW | Mechanical Systems | Signed-off | EG MUNOZ CONSTRUCTION.LLC | 01/04/2024 |
| DOB NOW | Plumbing | Permit Issued | DOWNTOWN PLBG & HTG INC | 10/11/2023 |
| DOB NOW | Mechanical Systems | Signed-off | GREGOR INDUSTRIES INC | 10/03/2023 |
| DOB NOW | General Construction | Signed-off | ELITE PAINTING MAINTENA | 09/22/2023 |
| DOB NOW | Plumbing | Signed-off | INTERCITY PLBG & HTG CORP | 09/19/2023 |
| DOB NOW | General Construction | Signed-off | GREGOR INDUSTRIES INC | 08/30/2023 |
| DOB NOW | Structural | Signed-off | TOWN & GARDENS LTD | 08/22/2023 |
| DOB NOW | Structural | Signed-off | EG MUNOZ CONSTRUCTION.LLC | 08/15/2023 |
| DOB NOW | General Construction | Signed-off | ELITE PAINTING MAINTENA | 07/19/2023 |
| DOB NOW | Plumbing | Signed-off | KAPNAG HTG & PLBG CORP | 05/25/2023 |
| DOB NOW | General Construction | Signed-off | EG MUNOZ CONSTRUCTION.LLC | 05/24/2023 |
| DOB NOW | General Construction | Signed-off | H DIAS INC | 05/22/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | URBAN INTELLIGENCE, INC | 05/19/2023 |
| DOB NOW | General Construction | Signed-off | EG MUNOZ CONSTRUCTION.LLC | 05/04/2023 |
| DOB NOW | General Construction | Signed-off | EG MUNOZ CONSTRUCTION.LLC | 05/04/2023 |
| DOB NOW | General Construction | Signed-off | EG MUNOZ CONSTRUCTION.LLC | 05/03/2023 |
| DOB NOW | Plumbing | Signed-off | DOWNTOWN PLBG & HTG INC | 04/20/2023 |
| DOB NOW | Plumbing | Signed-off | DOWNTOWN PLBG & HTG INC | 04/14/2023 |
| DOB NOW | Plumbing | Permit Issued | DOWNTOWN PLBG & HTG INC | 04/13/2023 |
| DOB NOW | Plumbing | Permit Issued | DOWNTOWN PLBG & HTG INC | 04/13/2023 |
| DOB NOW | Plumbing | Permit Issued | DOWNTOWN PLBG & HTG INC | 04/13/2023 |
| DOB NOW | Sprinklers | Signed-off | A&E MECHANICAL CORP | 01/06/2023 |
| DOB NOW | Sprinklers | Signed-off | A&E MECHANICAL CORP | 01/05/2023 |
| DOB NOW | Sprinklers | Signed-off | A&E MECHANICAL CORP | 01/05/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | MANHATTAN D ENTERPRISES | 10/18/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 12/08/2020 | Signed-off | EG MUNOZ CONSTRUCTION.LLC | Air Conditioning Systems, Heating Systems | |
| 10/18/2019 | Signed-off | EG MUNOZ CONSTRUCTION.LLC | Air Conditioning Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/29/2025 | — | — | 3 heads |
| 12/08/2020 | — | — | 99 heads |
| 12/08/2020 | — | — | 60 heads |
| 12/08/2020 | — | — | 98 heads |
| 10/17/2019 | — | — | 900 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Permit Issued | DOWNTOWN PLBG & HTG INC | Gas, Water/Sanitary |
| 08/25/2026 | — | — | Water/Sanitary |
| 06/19/2026 | Permit Issued | DOWNTOWN PLBG & HTG INC | Gas, Water/Sanitary |
| 06/19/2026 | Permit Issued | DOWNTOWN PLBG & HTG INC | Gas, Water/Sanitary |
| 06/15/2026 | Permit Issued | DOWNTOWN PLBG & HTG INC | Gas, Storm |
| 06/15/2026 | Permit Issued | DOWNTOWN PLBG & HTG INC | Gas, Water/Sanitary |
| 05/18/2026 | Signed-off | DOWNTOWN PLBG & HTG INC | Gas, Water/Sanitary |
| 05/18/2026 | Signed-off | DOWNTOWN PLBG & HTG INC | Gas, Water/Sanitary |
| 10/29/2025 | Permit Issued | DOWNTOWN PLBG & HTG INC | Gas, Water/Sanitary |
| 10/29/2025 | Permit Issued | DOWNTOWN PLBG & HTG INC | Gas, Water/Sanitary |
| 10/29/2025 | Permit Issued | A.M.N. CORPORATION | Gas, Water/Sanitary |
| 10/05/2022 | Permit Issued | DOWNTOWN PLBG & HTG INC | Gas, Storm, Water/Sanitary |
| 09/13/2022 | Permit Issued | DOWNTOWN PLBG & HTG INC | Gas, Storm, Water/Sanitary |
| 09/13/2022 | Permit Issued | DOWNTOWN PLBG & HTG INC | Gas, Water/Sanitary |
| 06/20/2022 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2026 | Permit Issued | TUXEDO ELEC'L CONTR'G INC | General Wiring |
| 06/05/2026 | Permit Issued | P & Z ELECTRIC CORP | General Wiring |
| 06/03/2026 | Permit Issued | TUXEDO ELEC'L CONTR'G INC | — |
| 06/03/2026 | Permit Issued | TUXEDO ELEC'L CONTR'G INC | — |
| 05/18/2026 | Permit Issued | ECS ELEC'L CONTG SERV INC | General Wiring |
| 05/01/2025 | Complete | GRAMERCY ELECTRIC INC | — |
| 09/23/2024 | Complete | MLB ELECTRICAL CORP | General Wiring |
| 08/07/2024 | Complete | MLB ELECTRICAL CORP | General Wiring |
| 08/02/2024 | Complete | MLB ELECTRICAL CORP | General Wiring |
| 06/25/2024 | Complete | MLB ELECTRICAL CORP | General Wiring |
| 06/25/2024 | Complete | MLB ELECTRICAL CORP | General Wiring |
| 06/25/2024 | Complete | MLB ELECTRICAL CORP | General Wiring |
| 06/25/2024 | Complete | MLB ELECTRICAL CORP | — |
| 06/25/2024 | Complete | MLB ELECTRICAL CORP | General Wiring |
| 09/20/2023 | Complete | JOSEPH WEINSTEIN ELECTRIC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/22/2026 | — | — | 1 scope_items |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/20/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/26/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/22/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/22/2024 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 07/12/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/28/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/17/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/28/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/23/2024 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 12/29/2023 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 11/13/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/13/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Water Test | Certified | View ↗ |
| 10/10/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/03/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/09/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/03/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/31/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/12/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/12/2023 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 01/12/2023 | Pass-Final PL - Underground | Pass | View ↗ |
| 01/05/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/05/2023 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 12/14/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/01/2022 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/02/2022 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/18/2026 | Post-installed Anchors | KEVIN SNEDEKER | special |
| 08/18/2026 | Energy Code Compliance Inspections | KEVIN SNEDEKER | progress |
| 07/10/2026 | Final | — | progress |
| 07/10/2026 | Tenant Protection Plan Compliance | — | special |
| 07/09/2026 | Post-installed Anchors | KEVIN SNEDEKER | special |
| 05/18/2026 | Post-installed Anchors | KEVIN SNEDEKER | special |
| 05/14/2026 | Final | Jeffrey Taylor | progress |
| 05/14/2026 | Tenant Protection Plan Compliance | Gregory Perotto | special |
| 05/14/2026 | Fire-Resistance Rated Construction | Jeffrey Taylor | progress |
| 05/05/2026 | Energy Code Compliance Inspections | KEVIN SNEDEKER | progress |
| 05/05/2026 | Post-installed Anchors | KEVIN SNEDEKER | special |
| 04/28/2026 | Tenant Protection Plan Compliance | Gregory Perotto | special |
| 04/28/2026 | Fire-Resistance Rated Construction | Jeffrey Taylor | progress |
| 04/25/2026 | Final | Jeffrey Taylor | progress |
| 11/17/2025 | Post-installed Anchors | KEVIN SNEDEKER | special |
| 11/06/2025 | Energy Code Compliance Inspections | KEVIN SNEDEKER | progress |
| 11/06/2025 | Post-installed Anchors | KEVIN SNEDEKER | special |
| 11/06/2025 | Fire-Resistant Penetrations and Joints | KEVIN SNEDEKER | special |
| 10/28/2025 | Post-installed Anchors | KEVIN SNEDEKER | special |
| 10/17/2025 | Energy Code Compliance Inspections | KEVIN SNEDEKER | progress |
| 10/17/2025 | Post-installed Anchors | KEVIN SNEDEKER | special |
| 10/17/2025 | Post-installed Anchors | KEVIN SNEDEKER | special |
| 10/17/2025 | Fire-Resistant Penetrations and Joints | KEVIN SNEDEKER | special |
| 09/18/2025 | Lighting in dwelling units | Greta Hansen | energy_progress |
| 09/18/2025 | Final | Greta Hansen | progress |