Roof92p · 9 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
STRUCTURAL MODIFICATIONS OF A (6) STORY BUILDING.
On file for this project
124 documents · 16 drawing sheets
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
On file for this project
2 documents
Filing for the Extension of a Elevator Bulkhead on the Roof, Elevator Machine Room has been raised to the Bulkhead Level,, refer to plans filed herewith.
On file for this project
11 documents · 2 drawing sheets
Latest 3 of 9 filings on this floor.
Bulkhead2p · 3 filings · 20 docs
ArchitectureDM
Replacement of South, east and west facade of existing six-story building on floors 001-006, including roof bulkheads and elevator shaft.
On file for this project
8 documents · 1 drawing sheet
Herewith filing interior renovations as per plans - associated demolition filed separately under application X0799181. No change in use, egress or occupancy proposed under this application.
On file for this project
6 documents · 1 drawing sheet
FILING HEREWITH APPLICATION FOR DEMO SEQUENCING @ EXPOSURE 1 ALONG WEST TREMONT AVENUE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
11 documents · 1 drawing sheet
Floor 694p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
STRUCTURAL MODIFICATIONS OF A (6) STORY BUILDING.
On file for this project
124 documents · 8 drawing sheets
MECHANICAL MODIFICATIONS AS SHOWN PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY IS PROPOSED.
On file for this project
4 documents · 1 drawing sheet
Replacement of South, east and west facade of existing six-story building on floors 001-006, including roof bulkheads and elevator shaft.
On file for this project
8 documents
Latest 3 of 6 filings on this floor.
Floor 513p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
STRUCTURAL MODIFICATIONS OF A (6) STORY BUILDING.
On file for this project
124 documents · 9 drawing sheets
MECHANICAL MODIFICATIONS AS SHOWN PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY IS PROPOSED.
On file for this project
4 documents · 2 drawing sheets
Replacement of South, east and west facade of existing six-story building on floors 001-006, including roof bulkheads and elevator shaft.
On file for this project
8 documents
Latest 3 of 8 filings on this floor.
Floor 4138p · 7 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
STRUCTURAL MODIFICATIONS OF A (6) STORY BUILDING.
On file for this project
124 documents · 9 drawing sheets
MECHANICAL MODIFICATIONS AS SHOWN PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY IS PROPOSED.
On file for this project
4 documents · 2 drawing sheets
Replacement of South, east and west facade of existing six-story building on floors 001-006, including roof bulkheads and elevator shaft.
On file for this project
8 documents
Latest 3 of 7 filings on this floor.
Floor 3137p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
STRUCTURAL MODIFICATIONS OF A (6) STORY BUILDING.
On file for this project
124 documents · 8 drawing sheets
MECHANICAL MODIFICATIONS AS SHOWN PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY IS PROPOSED.
On file for this project
4 documents · 2 drawing sheets
Replacement of South, east and west facade of existing six-story building on floors 001-006, including roof bulkheads and elevator shaft.
On file for this project
8 documents
Latest 3 of 7 filings on this floor.
Floor 2142p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
STRUCTURAL MODIFICATIONS OF A (6) STORY BUILDING.
On file for this project
124 documents · 9 drawing sheets
MECHANICAL MODIFICATIONS AS SHOWN PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY IS PROPOSED.
On file for this project
4 documents · 2 drawing sheets
Replacement of South, east and west facade of existing six-story building on floors 001-006, including roof bulkheads and elevator shaft.
On file for this project
8 documents
Latest 3 of 8 filings on this floor.
Floor 1138p · 7 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
STRUCTURAL MODIFICATIONS OF A (6) STORY BUILDING.
On file for this project
124 documents · 9 drawing sheets
MECHANICAL MODIFICATIONS AS SHOWN PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY IS PROPOSED.
On file for this project
4 documents · 2 drawing sheets
Replacement of South, east and west facade of existing six-story building on floors 001-006, including roof bulkheads and elevator shaft.
On file for this project
8 documents
Latest 3 of 7 filings on this floor.
Cellar11p · 1 filing · 20 docs
Plumbing
Issued Permit Scope
Plumbing
STRUCTURAL MODIFICATIONS OF A (6) STORY BUILDING.
On file for this project
124 documents
Site & exterior74p · 10 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
Construction Fence · General Construction · Protection and Mechanical Methods · Sidewalk Shed · Structural · Supported Scaffold
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 200 WEST TREMONT AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
4 documents · 8 drawing sheets
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
2 documents · 6 drawing sheets
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
10 documents · 5 drawing sheets
Latest 3 of 10 filings on this floor.