← Back
Other college and university
Health and Physical Education Center
2001 ORIENTAL BOULEVARD · BIN 3347725
💬 Discuss this project
1967Year Built
8Stories
W6Building Class
R3-1Zoning
353,600 sfGross Floor Area
1Units
LL97 Covered17 Open Violations 0 unresolved · 17 paperwork only ▸FDNY Report ↗
Other college and university · 2,430,020 sf lot · 0.15 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 2 filings · 18 docs
Floor 2Under Construction27p · 4 filings · 20 docs
Floor 1Under Construction31p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CUNY509/29/2026
DASNY103/22/2026
DEPT OF DESIGN CONSTRUCTION303/21/2026
DORMITORY AUTHORITY STATE OF N Y203/21/2026
DORMITORY AUTHORITY OF NY103/21/2026
DORMITORY AUTHORITY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
P WOLFE CONSULTANTS203/21/2026
JAM CONSULTANTS, INC.403/21/2026
SUPERSTRUCTURES ENG + ARCH203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACS SYSTEM ASSOCIATES INC.General Contractor109/29/2026
DEAN ENERGY SOLUTIONS CORGeneral Contractor107/08/2026
PROJECT EYE CONSULTANTS IGeneral Contractor109/26/2026
LOUIS L.BUTTERMARK & SONSPlumbing107/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983507/21/2026
Building Lifecycle
All (63)Filed (8)Permit Issued (4)Violation (5)Objection (16)Special Inspection (30)
09/28/2026
Permit issued — Mechanical Systems
B01270412-I1-MS
09/25/2026
Permit issued — Structural
B01139047-I1-GC
09/09/2026
Objection resolved — Resolved
08/28/2026
Objection raised — Scope
08/14/2026
Objection resolved — Resolved
08/05/2026
Objection raised — Scope
07/24/2026
Special inspection requirement — Air barrier - visual inspection
MARISA HARTE
07/24/2026
Special inspection requirement — Fenestration areas
MARISA HARTE
07/24/2026
Special inspection requirement — Fenestration air leakage
MARISA HARTE
07/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MARISA HARTE
07/24/2026
Special inspection requirement — Final
Paul Millman
07/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
MARISA HARTE
07/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MARISA HARTE
07/24/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MARISA HARTE
07/24/2026
Special inspection requirement — Masonry
MARISA HARTE
07/24/2026
Special inspection requirement — Post-installed Anchors
MARISA HARTE
07/24/2026
Special inspection requirement — Structural Steel - Details
MARISA HARTE
07/24/2026
Special inspection requirement — Structural Steel - Welding
MARISA HARTE
07/24/2026
Special inspection requirement — Structural Cold-Formed Steel
MARISA HARTE
07/24/2026
Special inspection requirement — Concrete - Cast-In-Place
MARISA HARTE
07/22/2026
Filed — Alteration
Interior plumbing alterations at Physical Education Bldg (Building G): replace DHW heaters & TMV with piping/insulation; replace floor drains and PRVs; replace wall hydrant; install new pool-deck drain/vent piping; new drinking fountain & CW piping.
B01270391-P1
07/21/2026
Filed — Alteration
KBCC G Bldg, Pool Renovation exterior & interior Removal/Replacement/Repairs: masonry, concrete, Ceiling, Door and Pool & deck waterproofing. New structural dunnage for new mech. Equipment. Misc facade repairs (coping, repointing, brick replacement).
B01139047-P2
07/21/2026
Filed — Alteration
Install new AHU-1 w/ DC-1 and AHU-2; modify ductwork & hot/chilled-water piping; add exhaust fans, diffusers/grilles, dampers, controls & duct smoke detector; UV disinfection; seal penetrations; TAB. No structural work or change to use/egress/occupancy.
B01270412-P1
06/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
MARISA HARTE
06/24/2026
Special inspection requirement — Concrete - Cast-In-Place
MARISA HARTE
06/24/2026
Special inspection requirement — Masonry
MARISA HARTE
06/24/2026
Special inspection requirement — Post-installed Anchors
MARISA HARTE
06/24/2026
Special inspection requirement — Structural Cold-Formed Steel
MARISA HARTE
06/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MARISA HARTE
06/24/2026
Special inspection requirement — Structural Steel - Details
MARISA HARTE
06/24/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MARISA HARTE
06/24/2026
Special inspection requirement — Structural Steel - Welding
MARISA HARTE
06/24/2026
Special inspection requirement — Final
Paul Millman
06/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MARISA HARTE
06/24/2026
Special inspection requirement — Air barrier - visual inspection
MARISA HARTE
06/24/2026
Special inspection requirement — Fenestration areas
MARISA HARTE
06/24/2026
Special inspection requirement — Fenestration air leakage
MARISA HARTE
06/05/2026
Permit issued — Mechanical Systems
B01022943-I1-MS
06/02/2026
Permit issued — Plumbing
B01270391-I1-PL
05/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARISA HARTE
05/27/2026
Special inspection requirement — Mechanical Systems
MARISA HARTE
09/11/2025
Objection resolved — Addressed
09/03/2025
Filed — Alteration
Interior plumbing alterations at Physical Education Bldg (Building G): replace DHW heaters & TMV with piping/insulation; replace floor drains and PRVs; replace wall hydrant; install new pool-deck drain/vent piping; new drinking fountain & CW piping.
B01270391-I1
09/03/2025
Filed — Alteration
Install new AHU-1 w/ DC-1 and AHU-2; modify ductwork & hot/chilled-water piping; add exhaust fans, diffusers/grilles, dampers, controls & duct smoke detector; UV disinfection; seal penetrations; TAB. No structural work or change to use/egress/occupancy.
B01270412-I1
08/26/2025
Filed — No Work
B01267002-I1
05/16/2025
Violation issued (FDNY_ORDER, closed)
05/16/2025
Violation issued (FDNY_ORDER, closed)
04/01/2025
Objection resolved — Addressed
04/01/2025
Objection resolved — Addressed
04/01/2025
Objection resolved — Addressed
04/01/2025
Objection resolved — Addressed
04/01/2025
Objection resolved — Addressed
12/18/2024
Violation issued (FDNY_NOV, closed)
12/12/2024
Objection raised — Fire_Protection
12/12/2024
Objection raised — Scope
12/12/2024
Objection raised — Scope
12/12/2024
Objection raised — Inspections
12/12/2024
Objection raised — Scope
12/12/2024
Objection raised — Admin
12/09/2024
Filed — Alteration
B01022943-I1
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedACS SYSTEM ASSOCIATES INC.09/28/2026
DOB NOWStructuralPermit IssuedPROJECT EYE CONSULTANTS I09/25/2026
DOB NOWMechanical SystemsPermit IssuedDEAN ENERGY SOLUTIONS COR06/05/2026
DOB NOWPlumbingPermit IssuedLOUIS L.BUTTERMARK & SONS06/02/2026
BISOTISSUEDA.T.J. ELECTRICAL CO INC04/19/2019
BISOTISSUEDWHITESTONE CONSTRUCTION CORP01/30/2006
1 project · most recent 07/21/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2026Permit IssuedACS SYSTEM ASSOCIATES INCAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Seresco DEHUMIDIFIER: CWT-061-NB-X-A5EBL243W2E5BF01H DRT COOLER: NG-V-32-EUHSMO-V 862,000 BTU ×2
Ventilation
Loren Cook Cook / FJ-20-B 4,000 CFM · Exhaust Fan ×2
SDN-D-VF 800 CFM · Exhaust Fan ×2
2 projects · most recent 05/12/2026
General Wiring Lighting
FiledStatusContractorScope
05/12/2026Permit IssuedLABCO ELETRT CONTNG CORPGeneral Wiring
02/15/2019CompleteA.T.J. ELECTRICAL CO.INC.Lighting
1 project · most recent 07/21/2026
Concrete
FiledStatusContractorScope
07/21/2026Permit IssuedPROJECT EYE CONSULTANTS IConcrete
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
07/24/2026Air barrier - visual inspectionMARISA HARTEenergy_progress
07/24/2026Fenestration areasMARISA HARTEenergy_progress
07/24/2026Fenestration air leakageMARISA HARTEenergy_progress
07/24/2026Fenestration and door U-factor and product ratingsMARISA HARTEenergy_progress
07/24/2026FinalPaul Millmanprogress
07/24/2026Fire-Resistance Rated ConstructionMARISA HARTEprogress
07/24/2026Structural Stability – Alterations of existing buildingsMARISA HARTEspecial
07/24/2026Structural Steel - High Strength BoltingMARISA HARTEspecial
07/24/2026MasonryMARISA HARTEspecial
07/24/2026Post-installed AnchorsMARISA HARTEspecial
07/24/2026Structural Steel - DetailsMARISA HARTEspecial
07/24/2026Structural Steel - WeldingMARISA HARTEspecial
07/24/2026Structural Cold-Formed SteelMARISA HARTEspecial
07/24/2026Concrete - Cast-In-PlaceMARISA HARTEspecial
06/24/2026Fire-Resistance Rated ConstructionMARISA HARTEprogress
06/24/2026Concrete - Cast-In-PlaceMARISA HARTEspecial
06/24/2026MasonryMARISA HARTEspecial
06/24/2026Post-installed AnchorsMARISA HARTEspecial
06/24/2026Structural Cold-Formed SteelMARISA HARTEspecial
06/24/2026Structural Stability – Alterations of existing buildingsMARISA HARTEspecial
06/24/2026Structural Steel - DetailsMARISA HARTEspecial
06/24/2026Structural Steel - High Strength BoltingMARISA HARTEspecial
06/24/2026Structural Steel - WeldingMARISA HARTEspecial
06/24/2026FinalPaul Millmanprogress
06/24/2026Fenestration and door U-factor and product ratingsMARISA HARTEenergy_progress
Latest 25 of 43.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/23/2026B01139047-P2Request digital key ↗
08/23/2026B01139047-I1Request digital key ↗
08/23/2026B01022943-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/20/2026B01267002-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
04/22/2021321786073Open ↗
02/07/2018321786073Open ↗
12/14/2010320247489Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
09/21/2022321786073Open ↗
▸BISWORK PERMIT APPLICATION1
04/22/2019321786073Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature11
09/19/2026B01022943-I1Open ↗
09/19/2026B01022943-I1Open ↗
09/01/2026B01267002-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026B01139047-I1Open ↗
08/23/2026B01139047-P2Open ↗
08/20/2026B01270391-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/19/2026B01022943-I1Open ↗
08/31/2026B01139047-P2Open ↗
08/29/2026B01139047-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/22/2019321786073Open ↗
02/07/2018321786073Open ↗
12/14/2010320247489Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
04/09/2012320247489Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026B01270391-P1Open ↗
08/13/2026B01270391-I1Open ↗
08/13/2026B01022943-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/22/2019321786073Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/14/2010320247489Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/22/2019321786073Open ↗
02/07/2018321786073Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/19/2022321786073Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/19/2022321786073Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/19/2022321786073Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/23/2026B01139047-P2Open ↗
08/20/2026B01270391-P1Open ↗
08/14/2026B01270412-P1Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/15/2023321786073Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/14/2010320247489Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
02/07/2018321786073Open ↗
12/14/2010320247489Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/19/2022321786073Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
02/07/2018321786073Open ↗
12/14/2010320247489Open ↗
▸BISADDITIONAL INFORMATION1
08/30/2021321786073Open ↗