← Back
Other college and university
2001 ORIENTAL BOULEVARD
BROOKLYN · BIN 3397343
💬 Discuss this project
1967Year Built
8Stories
W6Building Class
R3-1Zoning
353,600 sfGross Floor Area
1Units
LL97 Covered17 Open Violations 0 unresolved · 17 paperwork only ▸FDNY Report ↗
Other college and university · 2,430,020 sf lot · 0.15 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingGeneralOther
Roof10p · 3 filings · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASNY1607/08/2026
CUNY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUPERSTRUCTURES ENG. + ARCH.308/14/2025
ASHRAF CORP208/06/2025
RAMBOLL103/14/2023
MARK JONES207/09/2021
O'BRIEN AND GERE ENGINEERS INC.201/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS503/21/2026
BK CONSTRUCTIONDBA SRT CONSTRUCTION203/21/2026
SUPERSTRUCTURES ENG + ARCH303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M & J ELECTRICAL CONTRACGeneral Contractor303/21/2026
G-SQUARED ELECTRIC, LLCElectrical203/22/2026
APOLLON GROUP LLCGeneral Contractor204/09/2026
BK CONSTRUCTION SVCS INCGeneral Contractor207/08/2026
VARSITY PLBG AND HTG INCPlumbing207/08/2026
ALEXANDER EUGENEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106308/14/2025
FUTURE TECH CONSULTANTS O589207/09/2021
Building Lifecycle
All (56)Filed (10)Permit Issued (7)Signed Off (6)Inspection (3)Special Inspection (30)
07/24/2026
Signed off — Alteration
KBCC T7 Bldg, Exterior roof repairs as per the plans filed including: Removal and replacement of the existing roof membrane, flashings, etc. (for roofs requiring additional thermal insulation pursuant to requirements of NYC ECC).
B08038958-S1
07/24/2026
Signed off — Alteration
KBCC T7 Bldg, Exterior roof repairs as per the plans filed including: Removal and replacement of the existing roof membrane, flashings, etc. (for roofs requiring additional thermal insulation pursuant to requirements of NYC ECC).
B08038958-I1
06/01/2026
Signed off — Alteration
Installation of a temporary construction fence as indicated on plans.
B01259615-I1
06/01/2026
Signed off — Alteration
Installation of a temporary construction fence as indicated on plans.
B01259615-S1
09/23/2025
Permit issued — General Construction
B08038958-I1-GC
09/22/2025
Permit issued — General Construction
B08038958-S1-GC-CX
08/15/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
08/15/2025
Special inspection requirement — Insulation placement and R values
Paul Millman
08/15/2025
Special inspection requirement — Final
Paul Millman
08/14/2025
Filed — Alteration
KBCC T7 Bldg, Exterior roof repairs as per the plans filed including: Removal and replacement of the existing roof membrane, flashings, etc. (for roofs requiring additional thermal insulation pursuant to requirements of NYC ECC).
B08038958-P1
08/08/2025
Special inspection requirement — Insulation placement and R values
Paul Millman
08/08/2025
Special inspection requirement — Final
Paul Millman
08/08/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
08/07/2025
Permit issued — Construction Fence
B01259615-S1-FN
08/07/2025
Permit issued — Sidewalk Shed
B01259615-I1-SH
08/06/2025
Filed — Alteration
Installation of a temporary construction fence as indicated on plans.
B01259615-I1
08/06/2025
Filed — Alteration
Installation of a temporary construction fence as indicated on plans.
B01259615-S1
12/13/2024
Filed — Alteration
KBCC T7 Bldg, Exterior roof repairs as per the plans filed including: Removal and replacement of the existing roof membrane, flashings, etc. (for roofs requiring additional thermal insulation pursuant to requirements of NYC ECC).
B08038958-S1
12/11/2024
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
12/11/2024
Special inspection requirement — Final
Paul Millman
12/11/2024
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
03/01/2024
Signed off — Alteration
KCC intends to upgrade the HVAC equipment in the T7 Building. The project will replace the existing HVAC equipment which is comprised of outdated absorbers equaling approximately 94-ton capacity and will be replaced with updated equipment.
B00248433-I1
09/01/2023
Signed off — Alteration
Installation of plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy.
B00255447-I1
07/14/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/14/2023
Filed — Alteration
Installation of plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy.
B00255447-P3
11/14/2022
Filed — Alteration
KBCC T7 Bldg, Exterior roof repairs as per the plans filed including: Removal and replacement of the existing roof membrane, flashings, etc. (for roofs requiring additional thermal insulation pursuant to requirements of NYC ECC).
B08038958-I1
08/02/2022
Permit issued — Plumbing
B00255447-I1-PL
09/28/2021
Permit issued — Mechanical Systems
B00248433-I1-MS
08/10/2021
Permit issued — Plumbing
B00255447-I1-PL
07/20/2021
Special inspection requirement — Fire-Resistance Rated Construction
Stephen Marchese
07/20/2021
Special inspection requirement — Mechanical Systems
Stephen Marchese
07/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Marchese
07/20/2021
Special inspection requirement — Final
Stephen Marchese
07/20/2021
Special inspection requirement — Energy Code Compliance Inspections
Stephen Marchese
07/20/2021
Special inspection requirement — Maintenance information
Stephen Marchese
07/20/2021
Special inspection requirement — Duct leakage testing
Stephen Marchese
07/20/2021
Special inspection requirement — HVAC insulation and sealing
Stephen Marchese
07/20/2021
Special inspection requirement — Shutoff dampers
Stephen Marchese
07/20/2021
Special inspection requirement — Electrical motors
Stephen Marchese
07/20/2021
Special inspection requirement — HVAC and service water heating system controls
Stephen Marchese
07/20/2021
Special inspection requirement — HVAC and service water heating equipment
Stephen Marchese
07/09/2021
Filed — Alteration
KCC intends to upgrade the HVAC equipment in the T7 Building. The project will replace the existing HVAC equipment which is comprised of outdated absorbers equaling approximately 94-ton capacity and will be replaced with updated equipment.
B00248433-P1
07/09/2021
Filed — Alteration
Installation of plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy.
B00255447-P1
05/27/2021
Special inspection requirement — Energy Code Compliance Inspections
Stephen Marchese
05/27/2021
Special inspection requirement — HVAC and service water heating equipment
Stephen Marchese
05/27/2021
Special inspection requirement — HVAC and service water heating system controls
Stephen Marchese
05/27/2021
Special inspection requirement — Final
Stephen Marchese
05/27/2021
Special inspection requirement — Mechanical Systems
Stephen Marchese
05/27/2021
Special inspection requirement — Duct leakage testing
Stephen Marchese
05/27/2021
Special inspection requirement — Electrical motors
Stephen Marchese
05/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Marchese
05/27/2021
Special inspection requirement — Maintenance information
Stephen Marchese
01/16/2020
Filed — Alteration
KCC intends to upgrade the HVAC equipment in the T7 Building. The project will replace the existing HVAC equipment which is comprised of outdated absorbers equaling approximately 94-ton capacity and will be replaced with updated equipment.
B00248433-I1
01/16/2020
Filed — Alteration
Installation of plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy.
B00255447-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAPOLLON GROUP LLC09/23/2025
DOB NOWGeneral ConstructionSigned-offAPOLLON GROUP LLC09/22/2025
DOB NOWConstruction FenceSigned-offBK CONSTRUCTION SVCS INC08/07/2025
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC08/07/2025
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC08/02/2022
DOB NOWMechanical SystemsSigned-offM & J ELECTRICAL CONTRAC09/28/2021
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC08/10/2021
BISOTISSUEDM & J ELECTRICAL CONTRAC11/12/2021
BISOTISSUEDM & J ELECTRICAL CONTRAC11/12/2021
BISOTISSUEDM & J ELECTRICAL CONTRAC10/06/2021
BISOTISSUEDM & J ELECTRICAL CONTRAC12/10/2020
BISOTISSUEDM & J ELECTRICAL CONTRAC09/17/2020
2 projects · most recent 07/22/2025
General Wiring
FiledStatusContractorScope
07/22/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
01/06/2025CompleteG-SQUARED ELECTRIC, LLCGeneral Wiring
1 project · most recent 08/14/2025
FiledStatusContractorScope
08/14/2025Signed-offAPOLLON GROUP LLC1 scope_items
1 project · most recent 08/06/2025
Fence Sidewalk Shed
FiledStatusContractorScope
08/06/2025Signed-offBK CONSTRUCTION SVCS INCFence, Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
08/15/2025Post-installed AnchorsGEORGE GHEBRYALspecial
08/15/2025Insulation placement and R valuesPaul Millmanenergy_progress
08/15/2025FinalPaul Millmanprogress
08/08/2025Insulation placement and R valuesPaul Millmanenergy_progress
08/08/2025FinalPaul Millmanprogress
08/08/2025Post-installed AnchorsGEORGE GHEBRYALspecial
12/11/2024Structural Steel - DetailsGEORGE GHEBRYALspecial
12/11/2024FinalPaul Millmanprogress
12/11/2024Structural Steel - WeldingGEORGE GHEBRYALspecial
07/20/2021Fire-Resistance Rated ConstructionStephen Marcheseprogress
07/20/2021Mechanical SystemsStephen Marchesespecial
07/20/2021Fire-Resistant Penetrations and JointsStephen Marchesespecial
07/20/2021FinalStephen Marcheseprogress
07/20/2021Energy Code Compliance InspectionsStephen Marcheseprogress
07/20/2021Maintenance informationStephen Marcheseenergy_progress
07/20/2021Duct leakage testing Stephen Marcheseenergy_progress
07/20/2021HVAC insulation and sealing Stephen Marcheseenergy_progress
07/20/2021Shutoff dampersStephen Marcheseenergy_progress
07/20/2021Electrical motorsStephen Marcheseenergy_progress
07/20/2021HVAC and service water heating system controls Stephen Marcheseenergy_progress
07/20/2021HVAC and service water heating equipment Stephen Marcheseenergy_progress
05/27/2021Energy Code Compliance InspectionsStephen Marcheseprogress
05/27/2021HVAC and service water heating equipment Stephen Marcheseenergy_progress
05/27/2021HVAC and service water heating system controls Stephen Marcheseenergy_progress
05/27/2021FinalStephen Marcheseprogress
Latest 25 of 33.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Kingsborough Community CollegeEducationFloor 1
Project B00255447 Alteration · LOC Issued · 01/16/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch5
08/28/2026B08038958-S1Request digital key ↗
08/28/2026B08038958-P1Request digital key ↗
08/28/2026B08038958-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00255447-I1Request digital key ↗
08/15/2026B00255447-P1Request digital key ↗
08/15/2026B00255447-P3Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00248433-I1Request digital key ↗
08/15/2026B00248433-P1Request digital key ↗
▸Applications & Permits11
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
12/30/2020322071486Open ↗
04/15/2020322071486Open ↗
04/08/2020322031868Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
10/05/2021322071486Open ↗
10/04/2021322071486Open ↗
03/04/2020322071486Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
10/06/2021322071486Open ↗
12/11/2020322031868Open ↗
09/17/2020322031868Open ↗
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026B08038958-P1Open ↗
09/01/2026B08038958-P1Open ↗
08/28/2026B00248433-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B08038958-I1Open ↗
08/28/2026B08038958-P1Open ↗
08/28/2026B08038958-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B08038958-P1Open ↗
08/28/2026B00248433-I1Open ↗
08/28/2026B00248433-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/04/2020322071486Open ↗
01/28/2020322031868Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
03/04/2020322071486Open ↗
01/28/2020322031868Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/28/2026B08038958-I1Open ↗
08/13/2026B00255447-I1Open ↗
08/13/2026B00248433-I1Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)2
10/06/2021322071486Open ↗
09/17/2020322031868Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU1539BK191
10/05/2021322071486Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/04/2020322071486Open ↗
01/28/2020322031868Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/17/2020322031868Open ↗
▸Inspections & Test Reports4
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
10/06/2021322071486Open ↗
09/17/2020322031868Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/06/2021322071486Open ↗
12/30/2020322071486Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/13/2026B08038958-I1Open ↗
08/13/2026B08038958-S1Open ↗
08/13/2026B01259615-S1Open ↗
Showing 3 of 10 on file for this type
▸BISFINAL1
09/17/2020322031868Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/04/2020322071486Open ↗
01/28/2020322031868Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION7
10/05/2021322071486Open ↗
10/04/2020322031868Open ↗
10/04/2020322031868Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET2
03/04/2020322071486Open ↗
01/28/2020322031868Open ↗
▸BISBOROUGH INTAKE FORM1
12/11/2020322031868Open ↗