← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Raven Hall Condominium
2006 SURF AVENUE · BIN 3424222
💬 Discuss this project
2019Year Built
20Stories
RMBuilding Class
R7DZoning
182,662 sfGross Floor Area
217Units
LL97 CoveredRent Stabilized46 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: RAVEN HALL HOUSING DEVELOPMENT FUND CORP ORATION · 24,411 sf lot · 7.48 FAR built · Flood zone AE
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 13 docs
Floor 1Under Construction34p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP1007/08/2026
RAVEN HALL HOUSING DEVELO603/22/2026
WEST 20TH CONSTRUCTION LL603/22/2026
W. 20TH STREET CONSTRUCTI103/22/2026
RC STRUCTURE INC1503/22/2026
CORE SCAFFOLD SYSTEMS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AIR SOLUTION INC.1002/24/2026
ROBERT GERMAIN JR. PE212/23/2020
PAUL PERDEK, PROF. ENG. PLLC110/29/2020
SCALAR ARCHITECTURE PC207/12/2019
KN3 ENGINEERING LLC103/22/2019
STEPHEN B JACOBS GROUP103/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION803/21/2026
STEPHEN B JACOBS GROUP203/21/2026
RIGGING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor807/08/2026
WEST 20TH CONSTRUCTION LLGeneral Contractor603/22/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor603/21/2026
BUILDER BROTHER GROUP INCGeneral Contractor507/08/2026
VMC PLUMBING & HEATING INPlumbing309/07/2026
VILLAGE P H NYPlumbing203/22/2026
VILLAGE P & H NY INCFire Protection107/08/2026
CASE PLUMBING LLCFire Protection107/08/2026
LIBERTY MECHANICAL CONTPlumbing107/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
AAA TOTAL PLUMBING INCFire Protection109/29/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AIR SOLUTION INC8418908/06/2025
PCS ENGINEERING3745110/07/2024
ROBERT F. GERMAIN JR. PE5100212/23/2020
Building Lifecycle
All (144)Filed (18)Permit Issued (20)Signed Off (8)Violation (60)Inspection (8)Special Inspection (30)
09/28/2026
Permit issued — Sprinklers
B00970280-S4-EW-SP
08/31/2026
Permit issued — Plumbing
B00970280-S3-PL
08/11/2026
Violation issued (HPD, open)
B
08/07/2026
Violation issued (HPD, open)
B
08/07/2026
Violation issued (HPD, open)
A
08/07/2026
Violation issued (HPD, open)
A
08/07/2026
Violation issued (HPD, open)
B
08/07/2026
Violation issued (HPD, open)
B
05/18/2026
Violation issued (ECB, open)
Elevators
05/13/2026
Violation issued (HPD, closed)
I
05/12/2026
Violation issued (HPD, open)
B
05/08/2026
Violation issued (HPD, closed)
C
04/17/2026
Violation issued (HPD, closed)
C
04/17/2026
Violation issued (HPD, open)
A
04/17/2026
Violation issued (HPD, open)
A
04/17/2026
Violation issued (HPD, open)
A
04/14/2026
Violation issued (HPD, closed)
C
04/14/2026
Violation issued (HPD, open)
C
04/10/2026
Violation issued (HPD, closed)
B
04/10/2026
Violation issued (HPD, closed)
B
04/10/2026
Violation issued (HPD, closed)
A
02/24/2026
Filed — No Work
B01323205-I1
02/24/2026
Violation issued (ECB, closed)
Elevators
02/24/2026
Violation issued (ECB, closed)
Elevators
02/24/2026
Violation issued (ECB, closed)
Elevators
01/13/2026
Permit issued — General Construction
B00970280-I1-GC-CX
01/07/2026
Violation issued (HPD, open)
B
01/07/2026
Violation issued (HPD, open)
B
11/10/2025
Violation issued (HPD, open)
A
11/10/2025
Violation issued (HPD, open)
B
11/10/2025
Violation issued (HPD, open)
C
10/16/2025
Signed off — Alteration
PROPOSED PLUMBING AND SPRINKLER WORK FOR INTERIOR RENOVATION IN THE EXISTING COMMERCIAL SPACE#2 ON THE FIRST FLOOR. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01009663-S1
10/08/2025
Violation issued (HPD, open)
C
10/08/2025
Violation issued (HPD, open)
B
09/25/2025
Signed off — Alteration
PROPOSED PLUMBING AND SPRINKLER WORK FOR INTERIOR RENOVATION IN THE EXISTING COMMERCIAL SPACE#2 ON THE FIRST FLOOR. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01009663-I1
09/02/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/22/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
08/19/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/14/2025
Violation issued (HPD, closed)
B
08/11/2025
Special inspection requirement — Mechanical Systems
Tianchen Hu
08/11/2025
Special inspection requirement — Interior lighting power
Tianchen Hu
08/11/2025
Special inspection requirement — Lighting controls
Tianchen Hu
08/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
Tianchen Hu
08/11/2025
Special inspection requirement — Final
Tianchen Hu
08/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Tianchen Hu
08/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Tianchen Hu
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tianchen Hu
08/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Tianchen Hu
08/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Tianchen Hu
08/11/2025
Special inspection requirement — Shutoff dampers
Tianchen Hu
08/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Tianchen Hu
08/06/2025
Filed — Alteration
PROPOSED PLUMBING AND SPRINKLER WORK FOR INTERIOR RENOVATION IN THE EXISTING COMMERCIAL SPACE#2 ON THE FIRST FLOOR. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01009663-P4
08/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
Tianchen Hu
08/04/2025
Special inspection requirement — Lighting controls
Tianchen Hu
08/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Tianchen Hu
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tianchen Hu
08/04/2025
Special inspection requirement — Interior lighting power
Tianchen Hu
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Tianchen Hu
08/04/2025
Special inspection requirement — Final
Tianchen Hu
08/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Tianchen Hu
Latest 60 of 144 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedAAA TOTAL PLUMBING INC09/28/2026
DOB NOWPlumbingPermit IssuedVMC PLUMBING & HEATING IN08/31/2026
DOB NOWGeneral ConstructionPermit IssuedBUILDER BROTHER GROUP INC01/13/2026
DOB NOWSprinklersPermit IssuedS & L PLUMBING INC04/04/2025
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC03/31/2025
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC03/31/2025
DOB NOWGeneral ConstructionSigned-offBUILDER BROTHER GROUP INC03/06/2025
DOB NOWPlumbingPermit IssuedM. SPINELLI PLB & HTG INC02/18/2025
DOB NOWSuspended ScaffoldSigned-offEASI CAULKING INC10/18/2024
DOB NOWPlumbingPermit IssuedM. SPINELLI PLB & HTG INC02/28/2024
DOB NOWMechanical SystemsPermit IssuedBUILDER BROTHER GROUP INC01/18/2024
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC11/17/2020
DOB NOWConstruction FenceSigned-offSKYLINE SCAFFOLDING GROUP11/09/2020
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/30/2020
DOB NOWBoiler EquipmentSigned-offLIBERTY MECHANICAL CONT08/27/2020
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/13/2020
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC11/12/2019
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/15/2019
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC07/15/2019
DOB NOWConstruction FenceSigned-offSKYLINE SCAFFOLDING GROUP03/22/2019
BIS—ISSUEDWEST 20TH CONSTRUCTION LL03/25/2024
BIS—ISSUEDWEST 20TH CONSTRUCTION LL03/15/2023
BIS—ISSUEDWEST 20TH CONSTRUCTION LL10/13/2022
BIS—ISSUEDWEST 20TH CONSTRUCTION LL11/17/2021
BISPLISSUEDLIBERTY MECHANICAL CONT07/06/2021
BISSDISSUEDLIBERTY MECHANICAL CONT03/18/2021
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.12/15/2020
BIS—ISSUEDWEST 20TH CONSTRUCTION LL11/18/2020
BISEQISSUEDWEST 20TH CONSTRUCTION LL11/17/2020
BISEQISSUEDDECO BUILDING GROUP CORP11/17/2020
BISOTISSUEDWEST 20TH CONSTRUCTION LL11/09/2020
BISOTISSUEDWEST 20TH CONSTRUCTION LL09/01/2020
BISPLISSUEDLIBERTY MECHANICAL CONT07/07/2020
BISSDISSUEDALESSANDRO PLUMBING, INC06/20/2020
BISOTISSUEDR.C. STRUCTURES INC01/27/2020
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.12/23/2019
BIS—ISSUEDWEST 20TH CONSTRUCTION LL12/18/2019
BISSDISSUEDLIBERTY MECHANICAL CONT11/26/2019
BISEQISSUEDSURF AVENUE CONSTRUCTION11/13/2019
BIS—ISSUEDWEST 20TH CONSTRUCTION LL10/29/2019
+ 7 more permits on file
1 project · most recent 01/22/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/22/2025Permit IssuedBUILDER BROTHER GROUP INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric outdoor units: PUHY-P168YNU-A 14 tons · Vrf Outdoor ×2
Ventilation
Captiveaire CFA-S110-CA 100 CFM · Exhaust Fan ×2
CFA-S50-CA 50 CFM · Exhaust Fan ×2
SIF24DD-HE 13,000 CFM · Kitchen Exhaust ×2
SIF13DD 2,000 CFM · Exhaust Fan ×1
SIF18DD 4,000 CFM · Kitchen Exhaust ×1
1 project · most recent 01/22/2025
Sprinkler System
FiledStatusContractorScope
01/22/2025Permit IssuedAAA TOTAL PLUMBING INCSprinkler System
1 project · most recent 01/22/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/22/2025Permit IssuedVMC PLUMBING & HEATING INGas, Water/Sanitary
8 projects · most recent 03/18/2024
General Wiring
FiledStatusContractorScope
03/18/2024Permit IssuedCL ELECTRICAL CORPGeneral Wiring
11/17/2022CompleteKNIGHT ELEC'L SERV. CORP.General Wiring
06/07/2022CompleteM F ELEC'L SVC CO., INCGeneral Wiring
03/05/2020CompleteCONTROL SPEC ELECL SYSTEM—
02/10/2020CompleteTHYSSENKRUPP ELEVATOR CO—
11/12/2019CompleteM F ELEC'L SVC CO., INC—
07/10/2019CompleteV. VASS ELECTRIC CORP—
07/10/2019CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/02/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/22/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
08/19/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
08/11/2025Interior lighting powerTianchen Huenergy_progress
08/11/2025Energy Code Compliance InspectionsTianchen Huprogress
08/11/2025FinalTianchen Huprogress
08/11/2025Fire-Resistance Rated ConstructionTianchen Huprogress
08/11/2025Mechanical SystemsTianchen Huspecial
08/11/2025Tenant Protection Plan ComplianceTianchen Huspecial
08/11/2025Fire-Resistant Penetrations and JointsTianchen Huspecial
08/11/2025Lighting controlsTianchen Huenergy_progress
08/11/2025HVAC-R and service water heating equipmentTianchen Huenergy_progress
08/11/2025HVAC-R and service water piping design and insulationTianchen Huenergy_progress
08/11/2025HVAC-R and service water heating system controlsTianchen Huenergy_progress
08/11/2025Shutoff dampersTianchen Huenergy_progress
08/04/2025FinalTianchen Huprogress
08/04/2025Fire-Resistance Rated ConstructionTianchen Huprogress
08/04/2025Interior lighting powerTianchen Huenergy_progress
08/04/2025HVAC-R and service water heating system controlsTianchen Huenergy_progress
08/04/2025Lighting controlsTianchen Huenergy_progress
08/04/2025HVAC-R and service water heating equipmentTianchen Huenergy_progress
08/04/2025HVAC-R and service water piping design and insulationTianchen Huenergy_progress
08/04/2025Shutoff dampersTianchen Huenergy_progress
08/04/2025Fire-Resistant Penetrations and JointsTianchen Huspecial
08/04/2025Mechanical SystemsTianchen Huspecial
08/04/2025Tenant Protection Plan ComplianceTianchen Huspecial
08/04/2025Energy Code Compliance InspectionsTianchen Huprogress
07/28/2025HVAC-R and service water piping design and insulationTianchen Huenergy_progress
Latest 25 of 74.
▾Documents — 503 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch11
09/02/2026B00024333-I1Request digital key ↗
08/25/2026B01009663-P1Request digital key ↗
08/25/2026B01009663-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00141683-I1Request digital key ↗
09/02/2026B00191244-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/02/2026B00367280-I1Request digital key ↗
08/15/2026B00367280-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00191225-I1Request digital key ↗
09/02/2026B00420543-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/18/2026B01323205-I1Request digital key ↗
▸Applications & Permits72
▸BISPLAN / WORK APPROVAL APPLICATION50
01/27/2025321725282Open ↗
01/17/2025321725282Open ↗
12/26/2024321725282Open ↗
Showing 3 of 50 on file for this type
▸BISWORK PERMIT APPLICATION22
11/18/2021321725282Open ↗
11/18/2021321725282Open ↗
11/04/2021321725282Open ↗
Showing 3 of 22 on file for this type
▸Zoning, Tax Lot & Property Records12
▸BISFLOOD ZONE COMPLIANCE5
09/11/2023321793341Open ↗
08/30/2022340713044Open ↗
01/01/2022321793350Open ↗
Showing 3 of 5 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
04/01/2021322094443Open ↗
Showing 1 of 2 on file for this type
▸BISFLOOD ZONE DESIGN CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/01/2021322094443Open ↗
▸DOB NOWFlood Zone Design Certification1
08/13/2026B00024333-I1Open ↗
▸DOB NOWFlood Zone Compliance1
08/13/2026B00024333-I1Open ↗
▸Seals & Professional Certifications115
▸DOB NOWProgress Inspector Seal & Signature50
09/02/2026B01009663-P4Open ↗
09/02/2026B01009663-P4Open ↗
09/02/2026B01009663-P4Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/02/2026B01009663-P4Open ↗
09/02/2026B01009663-P4Open ↗
09/02/2026B01009663-P4Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/02/2026B00024333-I1Open ↗
09/02/2026B00141683-I1Open ↗
09/02/2026B00420543-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment20
▸BISSCHEDULE B - PLUMBING7
07/08/2021321793369Open ↗
06/03/2021321793369Open ↗
05/27/2021321793369Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
01/17/2025321725282Open ↗
Showing 1 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
08/30/2023321793341Open ↗
Showing 1 of 2 on file for this type
▸BISSTANDPIPE SYSTEMS2
01/01/2022321793350Open ↗
12/29/2021321793369Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/16/2021321725282Open ↗
▸BISEQUIPMENT USE PERMITS1
05/27/2022321725282Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
08/29/2023321725282Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE SIGNOFF2
08/29/2023321725282Open ↗
09/19/2022321795303Open ↗
▸Environmental & Asbestos16
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION6
09/19/2022321795303Open ↗
09/14/2022340756444Open ↗
08/30/2022340713044Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed4
09/02/2026B00420543-I1Open ↗
08/13/2026B00191244-I1Open ↗
08/13/2026B00141683-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
09/02/2026B00420543-I1Open ↗
08/13/2026B00141683-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/02/2022321725282Open ↗
07/21/2021321725282Open ↗
▸BISINTERIOR LIGHTING POWER1
12/16/2021321725282Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/14/2022340756444Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/16/2021321725282Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00367280-I1Open ↗
▸Inspections & Test Reports40
▸BISTECHNICAL REPORT: RESPONSIBILITY18
09/21/2022340756444Open ↗
09/19/2022340756444Open ↗
09/16/2022340756444Open ↗
Showing 3 of 18 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
01/31/2022321725282Open ↗
01/31/2022321725282Open ↗
01/31/2022321725282Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISHYDRO FLOW TEST LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF1
08/29/2023321725282Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/16/2021321725282Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/16/2021321725282Open ↗
▸Approvals, Objections & Sign-offs46
▸BISLETTERS - SUPPORTING DOCUMENTATION24
07/17/2025321725282Open ↗
01/27/2022321725282Open ↗
12/02/2021321725282Open ↗
Showing 3 of 24 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
01/27/2025321725282Open ↗
01/17/2025321725282Open ↗
12/26/2024321725282Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
09/22/2023321793341Open ↗
09/23/2022340756444Open ↗
09/09/2022321793369Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER3
10/18/2022321725282Open ↗
Showing 1 of 3 on file for this type
▸BISFINAL2
09/07/2022321495707Open ↗
08/30/2022340713044Open ↗
▸BISCURB CUT (CC) SIGNOFF1
08/29/2023321725282Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT5
09/14/2022340756444Open ↗
Showing 1 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
09/06/2023321793341Open ↗
08/30/2022340713044Open ↗
08/18/2022321793350Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms46
▸BISADDITIONAL INFORMATION30
08/11/2023321725282Open ↗
10/18/2022321725282Open ↗
01/27/2022321725282Open ↗
Showing 3 of 30 on file for this type
▸BISEFILING COVER SHEET12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents29
▸BISLOWEST FLOOR ELEVATION6
09/11/2023321793341Open ↗
09/11/2023321793341Open ↗
08/30/2022340713044Open ↗
Showing 3 of 6 on file for this type
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)5
08/31/2022321793341Open ↗
08/31/2022340713044Open ↗
08/31/2022321793350Open ↗
Showing 3 of 5 on file for this type
▸BISTCO - Supporting Documents4
01/28/2022321725282Open ↗
01/27/2022321725282Open ↗
01/27/2022321725282Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
01/27/2022321725282Open ↗
01/27/2022321725282Open ↗
06/24/2021321820151Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM3
04/01/2021322094443Open ↗
Showing 1 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
09/09/2022321793369Open ↗
09/09/2022321793350Open ↗
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)1
12/16/2021321725282Open ↗
▸BISSITE CONNECTION:DEP1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFEMA FORM (81-31): ELEVATION CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026B01116881-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01116881-I1Open ↗