← Back
Over six families without stores
2007 CLINTON AVENUE
BRONX · BIN 2012680
💬 Discuss this project
1920Year Built
2Stories
C1Building Class
R7-1Zoning
—Gross Floor Area
10Units
7 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 2007 CLINTON LLC · 1.25 FAR built · Flood zone X
Locations of Work
MechanicalFire ProtectionGeneral
Roof3p · 2 filings · 12 docs
Floor 11p · 1 filing · 7 docs
Basement2p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES507/08/2026
BROOKLYN GRID1207/08/2026
2007 CLINTON LLC303/22/2026
REVAMP NY CORP203/22/2026
LLNY GROUP103/22/2026
GS 2007 CLINTON AVE BX LL603/22/2026
JCM PRO BUILDERS103/22/2026
BENCHMARK DESIGN BUILDERS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES401/08/2026
SHAHRISH SHUVO ENGINEERING P.C.107/07/2025
VASILIOS ARTEMIOU PE102/27/2025
THOMAS C. TUNG, P.E.110/12/2022
CSANAD BODNAR ARCHITECT201/26/2022
PRAMODRAY SHAH, P.E.304/07/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)403/21/2026
WM ARCH203/21/2026
NYC DESIGN FILE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REVAMP NYC CORPGeneral Contractor207/08/2026
BENCHMARK DESIGN BUILDERSGeneral Contractor207/08/2026
RICHARD NEUElectrical103/22/2026
AMOK INCFire Protection107/08/2026
GOTHAM DEMOLITION&CONTAI*General Contractor107/08/2026
LLNY GROUP,LLCGeneral Contractor107/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor107/08/2026
AG POWER ELECTRIC CORPElectrical103/22/2026
AMOK INCPlumbing107/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524601/08/2026
CBA5091101/26/2022
Building Lifecycle
All (135)Filed (11)Permit Issued (9)Signed Off (7)Violation (53)Inspection (6)Objection (19)Special Inspection (30)
07/15/2026
Violation issued (HPD, open)
C
05/28/2026
Violation issued (HPD, open)
A
05/28/2026
Violation issued (HPD, open)
A
05/28/2026
Violation issued (HPD, open)
A
05/28/2026
Violation issued (HPD, open)
A
05/28/2026
Violation issued (HPD, open)
A
05/28/2026
Violation issued (HPD, closed)
B
05/28/2026
Violation issued (HPD, open)
A
04/30/2026
Violation issued (HPD, closed)
A
03/17/2026
Signed off — Alteration
X01177724-I1
02/26/2026
Signed off — Alteration CO
FILING SP PLAN IN CONJUNCTION WITH DOB JOB NUMBER 220703530
X08018212-S1
01/14/2026
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH ALT 1 APPLICATION #220703530
X01186559-I1
01/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
01/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
01/12/2026
Special inspection requirement — Ventilation and air distribution system
Shahrish Shuvo
01/12/2026
Special inspection requirement — Final
Shahrish Shuvo
01/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
01/12/2026
Special inspection requirement — Duct leakage testing, insulation and design
Shahrish Shuvo
01/12/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
01/12/2026
Special inspection requirement — Permanent certificate
Shahrish Shuvo
01/12/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
01/12/2026
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
01/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
01/12/2026
Special inspection requirement — Heating Systems
Shahrish Shuvo
01/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
01/08/2026
Signed off — Alteration
X00498286-I1
01/08/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH ALT 1 APPLICATION #220703530
X01186559-P2
12/10/2025
Signed off — Alteration
X00350649-I1
11/18/2025
Signed off — Alteration
X00382854-I1
08/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/06/2025
Signed off — Alteration
TEMPORARY WOOD CONSTRUCTION FENCE.
X01249012-I1
08/05/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/31/2025
Filed — Alteration
X01177724-P1
07/31/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
07/31/2025
Special inspection requirement — Permanent certificate
Shahrish Shuvo
07/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
07/31/2025
Special inspection requirement — Maintenance information
Shahrish Shuvo
07/11/2025
Permit issued — Construction Fence
X01249012-I1-FN
07/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2025
Filed — Alteration
TEMPORARY WOOD CONSTRUCTION FENCE.
X01249012-I1
07/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/13/2025
Violation issued (ECB, closed)
Unknown
06/13/2025
Violation issued (ECB, closed)
Construction
06/13/2025
Violation issued (ECB, closed)
Construction
06/11/2025
Permit issued — Mechanical Systems
X01186559-I1-MS
06/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/24/2025
Permit issued — Sprinklers
X08018212-S1-EW-SP
04/24/2025
Permit issued — Plumbing
X01177724-I1-PL
03/19/2025
Objection resolved — Addressed
03/19/2025
Objection resolved — Addressed
03/13/2025
Objection raised — Admin
03/12/2025
Objection resolved — Addressed
03/11/2025
Objection raised — Structural
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/05/2025
Objection raised — Fire_Protection
03/05/2025
Objection raised — Fire_Protection
03/05/2025
Objection raised — Fire_Protection
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offREVAMP NYC CORP07/11/2025
DOB NOWMechanical SystemsSigned-offREVAMP NYC CORP06/11/2025
DOB NOWSprinklersSigned-offAMOK INC04/24/2025
DOB NOWPlumbingSigned-offAMOK INC04/24/2025
DOB NOWConstruction FenceSigned-offLLNY GROUP,LLC02/12/2024
DOB NOWConstruction FenceSigned-offGOTHAM DEMOLITION&CONTAI*10/21/2022
DOB NOWStructuralSigned-offBENCHMARK DESIGN BUILDERS05/28/2021
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC08/11/2020
DOB NOWConstruction FenceSigned-offBENCHMARK DESIGN BUILDERS07/20/2020
BIS—ISSUEDREVAMP NYC CORP06/09/2025
BIS—ISSUEDLLNY GROUP,LLC04/04/2023
BIS—ISSUEDJCM PRO BUILDERS LLC02/02/2022
BISPLISSUEDTRI CITY MECHANICAL GROUP CORP11/17/2021
BIS—ISSUEDBENCHMARK DESIGN BUILDERS05/27/2021
1 project · most recent 02/27/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/27/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3C24NAHZ 24,000 BTU · Heat Pump Outdoor ×4
MXZ-4C36NAHZ 36,000 BTU · Heat Pump Outdoor ×2
2 projects · most recent 02/27/2025
FiledStatusContractorScope
02/27/2025Signed-offAMOK INC48 heads
01/26/2022———
5 projects · most recent 01/15/2026
General Wiring
FiledStatusContractorScope
01/15/2026Permit IssuedAG POWER ELECTRIC CORPGeneral Wiring
08/26/2025CompleteAG POWER ELECTRIC CORPGeneral Wiring
10/05/2020CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
10/05/2020CompleteJOSEPH WEINSTEIN ELECTRIC—
08/11/2020CompleteRICHARD NEU—
1 project
Fence
FiledStatusContractorScope
———Fence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/31/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
01/12/2026HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
01/12/2026HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
01/12/2026Ventilation and air distribution systemShahrish Shuvoenergy_progress
01/12/2026FinalShahrish Shuvoprogress
01/12/2026HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
01/12/2026Duct leakage testing, insulation and designShahrish Shuvoenergy_progress
01/12/2026Maintenance informationShahrish Shuvoenergy_progress
01/12/2026Permanent certificateShahrish Shuvoenergy_progress
01/12/2026Post-installed AnchorsShahrish Shuvospecial
01/12/2026Mechanical SystemsShahrish Shuvospecial
01/12/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
01/12/2026Heating SystemsShahrish Shuvospecial
01/12/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
07/31/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/31/2025HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
07/31/2025Permanent certificateShahrish Shuvoenergy_progress
07/31/2025HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
07/31/2025Maintenance informationShahrish Shuvoenergy_progress
10/10/2022Permanent certificate—energy_progress
10/10/2022Mechanical Systems—special
10/10/2022Fire-Resistant Penetrations and Joints—special
10/10/2022Final—progress
10/10/2022Energy Code Compliance Inspections—progress
10/10/2022Fire-Resistance Rated Construction—progress
10/10/2022Fenestration air leakage—energy_progress
Latest 25 of 40.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch6
08/25/2026X00498286-I1Request digital key ↗
08/20/2026X01186559-I1Request digital key ↗
08/20/2026X01186559-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/26/2026X00313744-I1Request digital key ↗
08/26/2026X00350649-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/24/2026X00281525-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00382854-I1Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION16
12/04/2025220703530Open ↗
12/03/2025220703530Open ↗
11/28/2025220703530Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION6
06/17/2025220703530Open ↗
04/05/2023220703530Open ↗
02/03/2022220703530Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/12/2025220703530Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISVERIFY TAX LOT1
08/05/2025220703530Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/19/2025220703530Open ↗
▸BISZONING DIAGRAM1
02/26/2020220703530Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/25/2020220703530Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/25/2020220703530Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026X00313744-I1Open ↗
08/26/2026X00350649-I1Open ↗
08/24/2026X00281525-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/22/2026X01186559-I1Open ↗
08/31/2026X01177724-P1Open ↗
08/27/2026X00281525-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/22/2026X01186559-I1Open ↗
09/22/2026X01186559-I1Open ↗
08/31/2026X01177724-P1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/08/2019220703530Open ↗
05/08/2019220703530Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/20/2019220722591Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/20/2019220722591Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/08/2019220703530Open ↗
▸BISSPRINKLER SYSTEMS1
10/21/2025220703530Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
12/20/2019220722591Open ↗
05/08/2019220703530Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/09/2020220703530Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00382854-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026X01186559-I1Open ↗
08/18/2026X01177724-P1Open ↗
08/18/2026X01177724-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
05/08/2019220703530Open ↗
▸Energy Compliance9
▸BISINSULATION PLACEMENT & R VALUES1
08/20/2025220703530Open ↗
▸BISLIGHTING IN DWELLING UNITS1
08/20/2025220703530Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/20/2025220703530Open ↗
▸BISLIGHTING CONTROLS1
08/20/2025220703530Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/20/2025220703530Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/08/2019220703530Open ↗
▸BISEXTERIOR LIGHTING POWER1
08/20/2025220703530Open ↗
▸BISINTERIOR LIGHTING POWER1
08/20/2025220703530Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/20/2025220703530Open ↗
▸Inspections & Test Reports5
▸BISMASONRY1
08/20/2025220703530Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
10/21/2025220703530Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/20/2025220703530Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/20/2025220703530Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
10/21/2025220703530Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSCHEDULE A - OCCUPANCY / USE6
02/19/2025220703530Open ↗
12/13/2024220703530Open ↗
12/10/2024220703530Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER3
04/05/2023220703530Open ↗
04/05/2023220703530Open ↗
02/03/2022220703530Open ↗
▸Cost, Insurance & Ownership8
▸BISPROJECT-SPECIFIC GL INSURANCE4
06/17/2025220703530Open ↗
04/05/2023220703530Open ↗
02/03/2022220703530Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT3
04/30/2025220703530Open ↗
03/06/2025220703530Open ↗
01/24/2020220703530Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/12/2025220703530Open ↗
▸Filing & Intake Forms8
▸BISBOROUGH INTAKE FORM4
04/05/2023220703530Open ↗
02/03/2022220703530Open ↗
06/04/2021220703530Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
12/20/2019220722591Open ↗
05/08/2019220703530Open ↗
▸BISADDITIONAL INFORMATION2
12/03/2024220703530Open ↗
02/26/2020220703530Open ↗
▸Other Documents2
▸BISSTRUCTURAL COLD-FORMED STEEL1
08/20/2025220703530Open ↗
▸BISPLOT DIAGRAM1
05/08/2019220703530Open ↗