3 Open Violations 2 unresolved · 1 paperwork only▸
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
ECB12/09/2005B4B/50D 32A/50E 19B/50F 50A 50B 50C 50A HOLE ON SIDE OF BUILDING WHERECONSTRUCTION IS BEING DONE CAUSING SAND AND DEBRIS TO FLOW DOWN THE FLUE PIPE FILLING UP THE FIRE CHAMBER AND THE OIL BURNER NOZEL.Nothing owed — awaiting certificate of correction
Three families · 1,800 sf lot · 1.66 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.