← Back
Two stories - detached, small or mid-size
201-05 104 AVENUE
QUEENS · Hollis · BIN 4232370
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3AZoning
1,284 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,800 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/29/2017$539K—SHAN-KOR INC. → Private party$420/sf building
03/21/2017$280K—Private party → SHAN-KOR INC.$218/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC209/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272209/25/2025
Building Lifecycle
All (8)Filed (2)Permit Issued (1)Special Inspection (5)
09/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
09/26/2025
Special inspection requirement — Final
Walid Abdulla
09/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
09/26/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
09/25/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01289662-P1
09/23/2025
Permit issued — Solar
Q01289662-I1-SL
09/19/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01289662-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC09/23/2025
2 projects · most recent 10/04/2025
General Wiring
FiledStatusContractorScope
10/04/2025CompleteCUNNINGHAM ELECTRIC CORPGeneral Wiring
09/19/2025CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 09/25/2025
FiledStatusContractorScope
09/25/2025Signed-offSUNRUN INSTALLATION SVC64 panels, 26.24 kw, 336.36 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/26/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/26/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
09/26/2025FinalWalid Abdullaprogress
09/26/2025Energy Code Compliance InspectionsWalid Abdullaprogress
09/26/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026Q01289662-I1Open ↗
08/28/2026Q01289662-I1Open ↗
08/28/2026Q01289662-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q01289662-I1Open ↗
08/28/2026Q01289662-I1Open ↗