← Back
Two family converted from one family
201-20 120TH AVENUE
QUEENS · St. Albans · BIN 4273530
💬 Discuss this project
1935Year Built
2Stories
B3Building Class
R3AZoning
2,080 sfGross Floor Area
2Units
Two family converted from one family · 3,502 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
Site & exterior2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CASH CARRY PROPERTY1707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/04/2023$1.2M—CASH AND CARRY PROPERTY CORP. → Private party$561/sf building
04/01/2022$950K—Private party → CASH & CARRY CORP$457/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES303/09/2023
TABRIZ DESIGN GROUP208/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ DESIGN GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor407/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275403/09/2023
TRIANGLE INSPECTION & TES7495108/15/2022
Building Lifecycle
All (51)Filed (5)Permit Issued (3)Signed Off (2)Inspection (9)Objection (2)Special Inspection (30)
08/01/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/21/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/14/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/06/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/21/2023
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT 1 APP# Q00730779.
Q00750694-I1
03/20/2023
Signed off — Alteration
Q00719798-I1
03/17/2023
Objection resolved — Addressed
03/17/2023
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Final
HARI SONI
03/17/2023
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Mechanical Systems
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Heating Systems
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Structural Wood Frame
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Duct leakage testing, insulation and design
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
03/17/2023
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
03/14/2023
Objection raised — Scope
03/09/2023
Filed — Alteration CO
PROPOSED VERTICAL ENLARGEMENT, PARTIAL DEMOLITION, FULL RENOVATION, CHANGE TO METES AND BOUNDS, AND CONVERSION TO 2-FAMILY.
Q00730779-P2
03/01/2023
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
03/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BAKHTIAR SHAMLOO
03/01/2023
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
03/01/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
03/01/2023
Special inspection requirement — Duct leakage testing, insulation and design
BAKHTIAR SHAMLOO
02/24/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/24/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/24/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/24/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/24/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/18/2022
Permit issued — Plumbing
Q00750694-I1-PL
08/15/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT 1 APP# Q00730779.
Q00750694-I1
08/12/2022
Filed — Alteration CO
PROPOSED VERTICAL ENLARGEMENT, PARTIAL DEMOLITION, FULL RENOVATION, CHANGE TO METES AND BOUNDS, AND CONVERSION TO 2-FAMILY.
Q00730779-P1
08/01/2022
Permit issued — Structural
Q00730779-I1-GC-CX
05/09/2022
Permit issued — Construction Fence
Q00719798-I1-FN
05/06/2022
Filed — Alteration CO
PROPOSED VERTICAL ENLARGEMENT, PARTIAL DEMOLITION, FULL RENOVATION, CHANGE TO METES AND BOUNDS, AND CONVERSION TO 2-FAMILY.
Q00730779-I1
05/04/2022
Filed — Alteration
Q00719798-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR08/18/2022
DOB NOWStructuralPermit IssuedPRECISION HOME DEV INC08/01/2022
DOB NOWConstruction FenceSigned-offPRECISION HOME DEV INC05/09/2022
1 project · most recent 03/09/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/09/2023Permit IssuedPRECISION HOME DEV INCVentilation Systems
Ventilation
1 project · most recent 02/06/2023
General Wiring
FiledStatusContractorScope
02/06/2023CompleteC & A ELECTRICAL CORPGeneral Wiring
1 project · most recent 03/09/2023
Wood
FiledStatusContractorScope
03/09/2023Permit IssuedPRECISION HOME DEV INCWood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/01/2023Fail-Final General Construction Non-Directive 14FailView ↗
07/21/2023Fail-Final General Construction Non-Directive 14FailView ↗
07/14/2023Fail-Final General Construction Non-Directive 14FailView ↗
07/06/2023Fail-Final General Construction Non-Directive 14FailView ↗
02/24/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/24/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/24/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/24/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
03/17/2023Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
03/17/2023Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
03/17/2023Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
03/17/2023Mechanical SystemsBAKHTIAR SHAMLOOspecial
03/17/2023Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
03/17/2023Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
03/17/2023MasonryBAKHTIAR SHAMLOOspecial
03/17/2023Heating SystemsBAKHTIAR SHAMLOOspecial
03/17/2023FinalHARI SONIprogress
03/17/2023Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
03/17/2023Structural Wood FrameBAKHTIAR SHAMLOOprogress
03/17/2023Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
03/17/2023HVAC-R and service water heating equipmentBAKHTIAR SHAMLOOenergy_progress
03/17/2023Duct leakage testing, insulation and designBAKHTIAR SHAMLOOenergy_progress
03/17/2023MeteringBAKHTIAR SHAMLOOenergy_progress
03/17/2023Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
03/17/2023Fenestration areasBAKHTIAR SHAMLOOenergy_progress
03/17/2023Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
03/17/2023Permanent certificateBAKHTIAR SHAMLOOenergy_progress
03/17/2023HVAC-R and service water heating system controlsBAKHTIAR SHAMLOOenergy_progress
03/17/2023Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
03/17/2023Maintenance informationBAKHTIAR SHAMLOOenergy_progress
03/17/2023Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
03/17/2023Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
03/17/2023HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
Latest 25 of 77.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00719798-I1Request digital key ↗
08/26/2026Q00730779-I1Request digital key ↗
08/26/2026Q00730779-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
06/27/2022421809895Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00730779-I1Open ↗
08/13/2026Q00730779-P1Open ↗
08/13/2026Q00730779-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00730779-P2Open ↗
08/13/2026Q00730779-I1Open ↗
08/13/2026Q00730779-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/02/2022421809895Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/02/2022421809895Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/02/2022421809895Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00730779-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026Q00730779-P1Open ↗
09/02/2026Q00730779-P1Open ↗
09/02/2026Q00730779-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026Q00730779-P1Open ↗
09/01/2026Q00750694-I1Open ↗
09/01/2026Q00750694-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026Q00730779-P2Open ↗
08/26/2026Q00730779-P1Open ↗
08/26/2026Q00730779-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00730779-P2Open ↗
08/13/2026Q00730779-P1Open ↗
08/13/2026Q00730779-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00730779-P1Open ↗
08/26/2026Q00730779-I1Open ↗
08/14/2026Q00730779-P2Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00730779-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/27/2022421809895Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial3
08/13/2026Q00730779-P1Open ↗
08/13/2026Q00730779-I1Open ↗
08/13/2026Q00730779-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00730779-P1Open ↗
08/13/2026Q00730779-P2Open ↗
08/13/2026Q00730779-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00730779-I1Open ↗
08/13/2026Q00730779-P1Open ↗
08/13/2026Q00730779-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/26/2026Q00730779-P1Open ↗
08/26/2026Q00730779-I1Open ↗
08/14/2026Q00730779-P2Open ↗
▸BISPLOT DIAGRAM1
06/02/2022421809895Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/02/2022421809895Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00730779-I1Open ↗