2019Year Built
3.5Stories
R1Building Class
R6BZoning
11,176 sfGross Floor Area
6Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential unit in 2-10 unit building · Owner of record: 201 23RD STREET CONDOMINIUM · 5,008 sf lot · 2.23 FAR built · Flood zone X
Locations of Work
Structural
Penthouse2p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
49 EAST 4TH LLC703/22/2026
AROUND ELECTRIC CORP.103/22/2026
AVO CONSTRUCTION1203/22/2026
201 23RD ST2303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENTHINK ENGINEERS LLC109/02/2021
RAS PE CONSULTING ENGINEERS205/28/2021
GREEN DESIGN302/18/2021
ROYAL ENGINEERING, P.C212/08/2017
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor1007/08/2026
AVO CONSTRUCTION LLCGeneral Contractor803/22/2026
DESIGN STUDIO ASSOCIATESGeneral Contractor303/22/2026
AROUND ELECTRIC CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394205/28/2021
Building Lifecycle
All (60)Filed (8)Permit Issued (9)Signed Off (6)Violation (20)Inspection (1)Special Inspection (16)
03/31/2023
Violation issued (HPD, closed)
A
03/25/2022
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
03/25/2022
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
11/09/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00389763-I1
10/28/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B00003288-I1
10/28/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B00004425-I1
10/25/2021
Permit issued — Sidewalk Shed
B00004425-I1-SH
10/22/2021
Signed off — Alteration
B00587261-I1
10/07/2021
Signed off — Alteration
HEREWITH FILING FOR STRUCTURAL DESIGN FOR NEW BUILDING
B00356289-I1
10/01/2021
Violation issued (ECB, closed)
Construction
10/01/2021
Violation issued (ECB, closed)
Construction
09/17/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/07/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY (30'-42') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
B00472358-I1
09/02/2021
Filed — Alteration
B00587261-I1
09/02/2021
Permit issued — Supported Scaffold
B00587261-I1-SF
08/23/2021
Permit issued — Sidewalk Shed
B00389763-I1-SH
07/27/2021
Violation issued (ECB, closed)
Unknown
05/28/2021
Filed — Alteration
HEREWITH FILING FOR STRUCTURAL DESIGN FOR NEW BUILDING
B00356289-P1
05/28/2021
Special inspection requirement — Masonry
Paul Raymond
05/28/2021
Special inspection requirement — Structural Steel - Details
Paul Raymond
05/28/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Paul Raymond
05/28/2021
Special inspection requirement — Structural Cold-Formed Steel
Paul Raymond
05/28/2021
Special inspection requirement — Concrete - Cast-In-Place
Paul Raymond
05/28/2021
Special inspection requirement — Structural Steel - Welding
Paul Raymond
05/28/2021
Special inspection requirement — Final
Paul Raymond
05/18/2021
Violation issued (ECB, closed)
Construction
04/23/2021
Special inspection requirement — Structural Steel - Details
04/23/2021
Special inspection requirement — Concrete - Cast-In-Place
Paul Raymond
04/23/2021
Special inspection requirement — Masonry
Paul Raymond
04/23/2021
Special inspection requirement — Structural Cold-Formed Steel
Paul Raymond
04/23/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Paul Raymond
04/23/2021
Special inspection requirement — Structural Steel - Welding
Paul Raymond
04/23/2021
Special inspection requirement — Final
Paul Raymond
02/18/2021
Filed — Alteration
INSTALLATION OF TEMPORARY (30'-42') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
B00472358-I1
02/18/2021
Permit issued — Supported Scaffold
B00472358-I1-SF
02/18/2021
Special inspection requirement — Final
Sunil Saigal
10/22/2020
Special inspection requirement — Final
Sunil Saigal
10/17/2020
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00389763-P1
09/22/2020
Permit issued — Structural
B00356289-I1-ST
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/25/2020
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00389763-I1
08/25/2020
Permit issued — Sidewalk Shed
B00389763-I1-SH
06/11/2020
Filed — Alteration
HEREWITH FILING FOR STRUCTURAL DESIGN FOR NEW BUILDING
B00356289-I1
05/08/2020
Violation issued (ECB, closed)
Construction
05/08/2020
Violation issued (ECB, closed)
Construction
01/30/2020
Violation issued (ECB, closed)
Construction
11/20/2019
Violation issued (ECB, closed)
Construction
05/20/2019
Violation issued (ECB, closed)
Construction
05/20/2019
Violation issued (ECB, closed)
Construction
04/24/2019
Violation issued (ECB, closed)
Construction
04/24/2019
Violation issued (ECB, closed)
Signs
03/07/2019
Violation issued (ECB, closed)
Construction
03/07/2019
Violation issued (ECB, closed)
Construction
03/07/2019
Violation issued (ECB, closed)
Construction
11/02/2018
Permit issued — Sidewalk Shed
B00004425-I1-SH
03/16/2018
Permit issued — Sidewalk Shed
B00004425-I1-SH
12/08/2017
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B00004425-I1
12/08/2017
Permit issued — Sidewalk Shed
B00004425-I1-SH
11/30/2017
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B00003288-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC10/25/2021
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC09/02/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC08/23/2021
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC02/18/2021
DOB NOWStructuralSigned-offAVO CONSTRUCTION LLC09/22/2020
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC08/25/2020
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/02/2018
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/16/2018
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC12/08/2017
BISPLISSUEDPLUMBING NYC INC01/03/2022
BISSPISSUEDPLUMBING NYC, INC12/15/2021
BIS—ISSUEDAVO CONSTRUCTION LLC06/22/2021
BISEQISSUEDAVO CONSTRUCTION LLC01/05/2021
BISPLISSUEDPLUMBING NYC INC09/28/2020
BIS—ISSUEDAVO CONSTRUCTION LLC07/13/2020
BISOTISSUEDAVO CONSTRUCTION LLC07/01/2020
BIS—ISSUEDAVO CONSTRUCTION LLC06/03/2020
BISEQISSUEDAVO CONSTRUCTION LLC02/03/2020
BIS—ISSUEDAVO CONSTRUCTION LLC06/04/2019
BISEQISSUEDAVO CONSTRUCTION LLC01/22/2019
BIS—RE-ISSUEDAVO CONSTRUCTION LLC01/22/2019
2 projects · most recent 01/25/2022
General Wiring
FiledStatusContractorScope
01/25/2022CompleteAROUND ELECTRIC CORP.General Wiring
03/05/2021CompleteJAM ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/17/2021Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/28/2021MasonryPaul Raymondspecial
05/28/2021Structural Steel - DetailsPaul Raymondspecial
05/28/2021Structural Steel - High Strength BoltingPaul Raymondspecial
05/28/2021Structural Cold-Formed SteelPaul Raymondspecial
05/28/2021Concrete - Cast-In-PlacePaul Raymondspecial
05/28/2021Structural Steel - WeldingPaul Raymondspecial
05/28/2021FinalPaul Raymondprogress
04/23/2021Structural Steel - Details—special
04/23/2021Concrete - Cast-In-PlacePaul Raymondspecial
04/23/2021MasonryPaul Raymondspecial
04/23/2021Structural Cold-Formed SteelPaul Raymondspecial
04/23/2021Structural Steel - High Strength BoltingPaul Raymondspecial
04/23/2021Structural Steel - WeldingPaul Raymondspecial
04/23/2021FinalPaul Raymondprogress
02/18/2021FinalSunil Saigalprogress
10/22/2020FinalSunil Saigalprogress
▾Documents — 227 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch3
09/03/2026B00003288-I1Request digital key ↗
09/03/2026B00004425-I1Request digital key ↗
09/01/2026B00587261-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00356289-I1Request digital key ↗
08/15/2026B00356289-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00389763-I1Request digital key ↗
08/15/2026B00389763-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/01/2026B00472358-I1Request digital key ↗
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION23
09/19/2022321627593Open ↗
09/12/2022321627593Open ↗
09/08/2022321627593Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION7
12/15/2021321075947Open ↗
09/28/2020321627593Open ↗
07/01/2020340733576Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
02/25/2020321627593Open ↗
05/28/2019321627593Open ↗
▸Zoning, Tax Lot & Property Records11
▸BISADDRESS: NEW HOUSE NUMBER APPROVED3
03/01/2022321627593Open ↗
09/23/2021322097814Open ↗
12/21/2018321627593Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
09/23/2021322097814Open ↗
12/20/2018321627593Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/23/2021322097814Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
03/01/2022321627593Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/23/2021322097814Open ↗
▸BISVERIFY TAX LOT1
03/01/2022321627593Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/01/2022321627593Open ↗
▸BISZONING DIAGRAM1
06/04/2019321627593Open ↗
▸Seals & Professional Certifications36
▸DOB NOWSpecial Inspector Seal & Signature11
08/27/2026B00356289-P1Open ↗
08/27/2026B00356289-P1Open ↗
08/27/2026B00356289-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026B00003288-I1Open ↗
09/03/2026B00004425-I1Open ↗
09/01/2026B00472358-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
06/03/2019321627593Open ↗
04/29/2019321075947Open ↗
01/23/2019321627593Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026B00472358-I1Open ↗
09/01/2026B00389763-I1Open ↗
08/27/2026B00356289-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/11/2020340733576Open ↗
12/01/2017340565463Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/11/2020340733576Open ↗
12/01/2017340565463Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/11/2020340733576Open ↗
12/01/2017340565463Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING5
02/15/2022321627593Open ↗
11/18/2021321627593Open ↗
11/09/2021321627593Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
12/19/2018321627593Open ↗
11/14/2018321075947Open ↗
07/26/2017321627593Open ↗
▸BISSPRINKLER SYSTEMS2
03/01/2022321627593Open ↗
02/22/2022321075947Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/01/2022321627593Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/01/2022321627593Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
03/01/2022321627593Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
11/21/2019322026696Open ↗
12/21/2018321627593Open ↗
▸BISSTREET TREE SIGNOFF1
05/19/2022321627593Open ↗
▸Energy Compliance13
▸BISAS-BUILT ENERGY ANALYSIS2
09/22/2022321627593Open ↗
03/30/2022340733576Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/23/2019321627593Open ↗
12/13/2018321627593Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/01/2022321627593Open ↗
▸BISFENESTRATION AREAS1
03/01/2022321627593Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/11/2020340733576Open ↗
▸BISNYCECC ANALYSIS1
06/11/2020340733576Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/01/2022321627593Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/01/2022321627593Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/01/2022321627593Open ↗
▸BISLIGHTING CONTROLS1
03/01/2022321627593Open ↗
▸BIS* HVAC INSULATION AND SEALING1
03/01/2022321627593Open ↗
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY12
03/30/2022340733576Open ↗
03/09/2022340733576Open ↗
03/04/2022340733576Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
07/30/2020340733576Open ↗
06/11/2020340733576Open ↗
01/23/2019321627593Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
03/31/2022340733576Open ↗
06/11/2020340733576Open ↗
01/23/2019321627593Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
03/02/2022321075947Open ↗
03/01/2022321627593Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/01/2022321627593Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/01/2022321627593Open ↗
▸BISHYDRO FLOW TEST LETTER1
05/23/2019321075947Open ↗
▸BISSOIL REPORT1
06/11/2020340733576Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE7
09/19/2022321627593Open ↗
09/12/2022321627593Open ↗
09/08/2022321627593Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/31/2022340733576Open ↗
03/25/2022321850341Open ↗
03/03/2022321075947Open ↗
▸BISDEP SITE CONNECTION APPROVAL1
03/07/2022321627593Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT4
03/25/2022321850341Open ↗
03/04/2022340733576Open ↗
06/11/2020340733576Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
06/06/2019321627593Open ↗
01/23/2019321627593Open ↗
▸Filing & Intake Forms29
▸BISADDITIONAL INFORMATION18
10/13/2022321627593Open ↗
09/26/2022321627593Open ↗
09/21/2022321627593Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET7
07/01/2021322097814Open ↗
12/19/2018321627593Open ↗
12/03/2018322026696Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
06/03/2019322026696Open ↗
12/03/2018322026696Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
06/11/2020340733576Open ↗
12/01/2017340565463Open ↗
▸Other Documents12
▸BISPLOT DIAGRAM2
09/23/2021322097814Open ↗
12/13/2018321627593Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
09/03/2026B00003288-I1Open ↗
09/03/2026B00004425-I1Open ↗
▸BISCPC: HUDSON YARDS FINAL CERTIFICATION1
11/08/2018321850341Open ↗
▸BISVESTIBULES1
03/01/2022321627593Open ↗
▸BISMAINTENANCE INFORMATION1
03/01/2022321627593Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
09/23/2021322097814Open ↗
▸BISPERMANENT CERTIFICATE1
03/01/2022321627593Open ↗
▸BISSCU-101
01/10/2019321627593Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
03/01/2022321627593Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/01/2022321627593Open ↗