1905Year Built
3Stories
C0Building Class
R4Zoning
2,628 sfGross Floor Area
3Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · Owner of record: BROOKLYN BAY 13 LLC · 6,173 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
Floor 310p · 1 filing · 14 docs
Floor 2Under Construction29p · 3 filings · 20 docs
Floor 1Under Construction29p · 3 filings · 20 docs
BasementUnder Construction18p · 1 filing · 20 docs
Sub-BasementUnder Construction5p · 1 filing · 1 doc
Site & exterior1p · 2 filings · 7 docs
Filed — no permit issued1p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JONICO CONSTRUCTION1909/14/2026
2133 HARING203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/13/2025$1.8M—— → —$685/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN STUDIO ASSOCIATES908/31/2026
DEMERARA ENGINEERING, PLLC301/13/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN STUDIO ASSOCIATES703/21/2026
LARGIME MUJOVIC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JONICO CONSTRUCTION LLCGeneral Contractor507/25/2026
A.G.M. PLBG & HTG, INCFire Protection106/28/2026
SKEN SERVICES CORPGeneral Contractor104/08/2026
A.G.M. PLUMBING & HEATINGPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495608/31/2026
DEMERARA ENGINEERING, PLL4248301/13/2026
Building Lifecycle
All (108)Filed (13)Permit Issued (8)Signed Off (2)Violation (1)Inspection (6)Objection (48)Special Inspection (30)
08/31/2026
Filed — New Building
PROPOSED (3) THREE STORY (6) SIX FAMILY DWELLING AS PER PLANS FILED HEREWITH
B01229668-P4
08/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
08/31/2026
Special inspection requirement — Sprinkler Systems
Rajasekhar Sakhamuri
08/26/2026
Filed — New Building
PROPOSED (3) THREE STORY (6) SIX FAMILY DWELLING AS PER PLANS FILED HEREWITH
B01229668-P3
08/25/2026
Special inspection requirement — Electric vehicle service equipment requirements
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Insulation placement and R values
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Metering
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Air barrier - visual inspection
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Interior lighting power
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Permanent certificate
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Duct leakage testing, insulation and design
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Air barrier — testing
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Protection of exposed foundation insulation
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Fenestration areas
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Masonry
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Fenestration air leakage
Rajasekhar Sakhamuri
08/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
Rajasekhar Sakhamuri
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
08/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/10/2026
Objection raised — Structural
08/10/2026
Objection raised — Scope
08/10/2026
Objection raised — Scope
08/10/2026
Objection raised — Structural
08/10/2026
Objection raised — Zoning
08/10/2026
Objection raised — Scope
07/27/2026
Filed — Alteration
INSTALLATION OF CURB CUT FILED IN CONJUNCTION WITH NB B01229668-I1
B01306351-I1
07/27/2026
Filed — Alteration
PROPOSED CURB CUT FILED IN CONJUNCTION W/ NB APPLICATION B01229668-I1
B01306341-I1
07/23/2026
Permit issued — Structural
B01296964-S1-ST
07/08/2026
Signed off — Alteration
8 FT. HIGH PLYWOOD CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH.
B01246059-I1
06/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/07/2026
Permit issued — Sprinklers
B01229668-S2-EW-SP
05/07/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/28/2026
Permit issued — Plumbing
B01229668-S3-PL
04/27/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
04/27/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Rajasekhar Sakhamuri
04/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Rajasekhar Sakhamuri
04/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Rajasekhar Sakhamuri
04/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Rajasekhar Sakhamuri
04/27/2026
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
04/20/2026
Filed — New Building
PROPOSED (3) THREE STORY (6) SIX FAMILY DWELLING AS PER PLANS FILED HEREWITH
B01229668-P1
04/20/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
04/20/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
04/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Rajasekhar Sakhamuri
04/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Rajasekhar Sakhamuri
02/05/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
01/29/2026
Permit issued — Structural
B01345336-I1-ST
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offJONICO CONSTRUCTION LLC07/23/2026
DOB NOWSprinklersPermit IssuedA.G.M. PLBG & HTG, INC05/07/2026
DOB NOWPlumbingPermit IssuedA.G.M. PLUMBING & HEATING04/28/2026
DOB NOWStructuralPermit IssuedJONICO CONSTRUCTION LLC01/29/2026
DOB NOWGeneral ConstructionPermit IssuedJONICO CONSTRUCTION LLC01/12/2026
DOB NOWGeneral ConstructionSigned-offJONICO CONSTRUCTION LLC12/05/2025
DOB NOWFull DemolitionSigned-offTT & T CONSTRUCTION INC09/09/2025
DOB NOWConstruction FenceSigned-offJONICO CONSTRUCTION LLC08/19/2025
1 project · most recent 08/31/2026
Sprinkler System
FiledStatusContractorScope
08/31/2026Permit IssuedA.G.M. PLBG & HTG, INCSprinkler System
1 project · most recent 08/31/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/31/2026Permit IssuedA.G.M. PLUMBING & HEATINGStorm, Water/Sanitary
1 project · most recent 02/24/2026
General Wiring
FiledStatusContractorScope
02/24/2026Permit IssuedAROUND ELECTRIC CORP.General Wiring
3 projects · most recent 01/13/2026
Steel Masonry Concrete
FiledStatusContractorScope
01/13/2026Permit IssuedJONICO CONSTRUCTION LLCSteel, Masonry
11/25/2025Signed-offJONICO CONSTRUCTION LLC2 scope_items
11/06/2025Signed-offJONICO CONSTRUCTION LLCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/15/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/13/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/07/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
08/31/2026Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
08/31/2026Sprinkler SystemsRajasekhar Sakhamurispecial
08/25/2026Fenestration areasRajasekhar Sakhamurienergy_progress
08/25/2026Interior lighting powerRajasekhar Sakhamurienergy_progress
08/25/2026Protection of exposed foundation insulationRajasekhar Sakhamurienergy_progress
08/25/2026Air barrier — testing Rajasekhar Sakhamurienergy_progress
08/25/2026Fenestration and door U-factor and product ratingsRajasekhar Sakhamurienergy_progress
08/25/2026Duct leakage testing, insulation and designRajasekhar Sakhamurienergy_progress
08/25/2026Maintenance informationRajasekhar Sakhamurienergy_progress
08/25/2026Insulation placement and R valuesRajasekhar Sakhamurienergy_progress
08/25/2026Fenestration air leakageRajasekhar Sakhamurienergy_progress
08/25/2026MeteringRajasekhar Sakhamurienergy_progress
08/25/2026Air barrier - visual inspectionRajasekhar Sakhamurienergy_progress
08/25/2026Electric vehicle service equipment requirementsRajasekhar Sakhamurienergy_progress
08/25/2026Exterior Insulation and Finish Systems (EIFS)Rajasekhar Sakhamurispecial
08/25/2026Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
08/25/2026MasonryRajasekhar Sakhamurispecial
08/25/2026Fire-Resistance Rated ConstructionRajasekhar Sakhamuriprogress
08/25/2026Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
08/25/2026Permanent certificateRajasekhar Sakhamurienergy_progress
04/27/2026HVAC-R and service water heating equipmentRajasekhar Sakhamurienergy_progress
04/27/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
04/27/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRajasekhar Sakhamurispecial
04/27/2026HVAC-R and service water piping design and insulationRajasekhar Sakhamurienergy_progress
04/27/2026Maintenance informationRajasekhar Sakhamurienergy_progress
Latest 25 of 72.
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/21/2026B01244116-I1Request digital key ↗
08/21/2026B01246059-I1Request digital key ↗
08/20/2026B01296964-S1Request digital key ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01296964-I1Open ↗
08/13/2026B01229668-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01229668-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01229668-I1Open ↗
▸Seals & Professional Certifications74
▸DOB NOWProgress Inspector Seal & Signature41
09/23/2026B01229668-P3Open ↗
09/23/2026B01229668-P3Open ↗
09/23/2026B01229668-P3Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026B01229668-P3Open ↗
09/23/2026B01229668-P3Open ↗
09/23/2026B01229668-P3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/20/2026B01296964-I1Open ↗
08/20/2026B01296964-S1Open ↗
08/19/2026B01345336-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026B01244116-I1Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/20/2026B01296964-I1Open ↗
08/13/2026B01229668-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01244116-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01244116-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01244116-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01244116-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01229668-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01229668-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01244116-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B01244116-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial2
08/13/2026B01229668-I1Open ↗
08/13/2026B01296964-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01229668-I1Open ↗
08/13/2026B01296964-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026B01229668-I1Open ↗
08/13/2026B01244116-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01244116-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01296964-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01244116-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01244116-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01324794-I1Open ↗