← Back
Three families
201 WASHINGTON PARK
BROOKLYN · BIN 3058419
💬 Discuss this project
1865Year Built
4Stories
C0Building Class
R6BZoning
6,014 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,200 sf lot · 2.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof4p · 2 filings · 20 docs
Floor 42p · 1 filing · 17 docs
Floor 34p · 2 filings · 20 docs
Floor 25p · 3 filings · 20 docs
Floor 1
Cellar8p · 1 filing · 17 docs
Basement5p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BENDIX ENGINEERING, P.C.609/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANZALONE ARCHITECTURE1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EH PLUMBING & HEATING CORPlumbing207/08/2026
BARONGI, FElectrical103/21/2026
MCGEE, RAYMONDElectrical103/21/2026
DEPENDABLE MECHANICAL CORFire Protection107/08/2026
SUPREME GEN.CONTR INCGeneral Contractor107/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BENDIX ENGINEERING, P.C.4293609/12/2025
Building Lifecycle
All (21)Filed (6)Permit Issued (5)Signed Off (1)Violation (4)Inspection (2)Special Inspection (3)
09/12/2025
Filed — Alteration
HEREWITH FILING PLUMBING MODIFICATIONS IN CONJUNCTION WITH RENOVATION OF 4 FAMILY AS SHOWN ON PLANS FILED HEREWITH. RELATED GENERAL CONSTRUCTION, STRUCTURAL, MECHANICAL AND SPRINKLER FILED UNDER SEPARATE APPLICATIONS.
B00306976-P3
05/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
03/17/2025
Permit issued — Plumbing
B00306976-I1-PL
06/07/2024
Filed — Alteration
HEREWITH FILING PLUMBING MODIFICATIONS IN CONJUNCTION WITH RENOVATION OF 4 FAMILY AS SHOWN ON PLANS FILED HEREWITH. RELATED GENERAL CONSTRUCTION, STRUCTURAL, MECHANICAL AND SPRINKLER FILED UNDER SEPARATE APPLICATIONS.
B00306976-P2
05/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
01/03/2023
Signed off — Alteration
B00306939-I1
03/02/2022
Violation issued (HPD, closed)
A
02/23/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/14/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/25/2022
Permit issued — Sprinklers
B00307040-I1-EW-SP
11/05/2021
Filed — Alteration
HEREWITH FILING PLUMBING MODIFICATIONS IN CONJUNCTION WITH RENOVATION OF 4 FAMILY AS SHOWN ON PLANS FILED HEREWITH. RELATED GENERAL CONSTRUCTION, STRUCTURAL, MECHANICAL AND SPRINKLER FILED UNDER SEPARATE APPLICATIONS.
B00306976-P1
10/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
03/19/2021
Permit issued — Plumbing
B00306976-I1-PL
02/03/2021
Permit issued — Plumbing
B00306976-I1-PL
01/27/2021
Permit issued — Mechanical Systems
B00306939-I1-MS
01/07/2021
Filed — Alteration
B00306939-I1
01/07/2021
Filed — Alteration
B00307040-I1
01/07/2021
Filed — Alteration
HEREWITH FILING PLUMBING MODIFICATIONS IN CONJUNCTION WITH RENOVATION OF 4 FAMILY AS SHOWN ON PLANS FILED HEREWITH. RELATED GENERAL CONSTRUCTION, STRUCTURAL, MECHANICAL AND SPRINKLER FILED UNDER SEPARATE APPLICATIONS.
B00306976-I1
10/31/2019
Violation issued (HPD, closed)
I
11/30/2017
Violation issued (HPD, closed)
I
10/14/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP03/17/2025
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR01/25/2022
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR03/19/2021
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR02/03/2021
DOB NOWMechanical SystemsSigned-offSUPREME GEN.CONTR INC01/27/2021
BISOTISSUEDSUPREME GEN.CONTR INC08/10/2022
BISOTISSUEDSUPREME GEN.CONTR INC11/30/2021
BISOTISSUEDSUPREME GEN.CONTR INC11/30/2021
BISOTISSUEDSUPREME GEN.CONTR INC12/16/2020
BISOTISSUEDSUPREME GEN.CONTR INC12/16/2020
1 project · most recent 09/12/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/12/2025Signed-offA&H EXPRESS PLBG&HTG CORPGas, Storm, Water/Sanitary
1 project · most recent 02/16/2021
General Wiring
FiledStatusContractorScope
02/16/2021CompleteA & R ELEC'L CONTR'G INC.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/23/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/14/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/21/2025Fire-Resistant Penetrations and JointsMatthew Bendixspecial
05/22/2024Fire-Resistant Penetrations and JointsMatthew Bendixspecial
10/29/2021Fire-Resistant Penetrations and JointsMatthew Bendixspecial
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00306976-P1Request digital key ↗
09/02/2026B00306976-I1Request digital key ↗
09/02/2026B00306976-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00306939-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00307040-I1Request digital key ↗
▸Applications & Permits12
▸DOB NOWLPC Approval/Permit5
08/13/2026B00306976-P1Open ↗
08/13/2026B00306976-P2Open ↗
08/13/2026B00306939-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
03/12/2020321990164Open ↗
03/12/2020321990164Open ↗
▸BISWORK PERMIT APPLICATION2
12/23/2020321990164Open ↗
12/23/2020321990164Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
12/15/2020321990164Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/16/2020321990164Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
12/15/2020321990164Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026B00307040-I1Open ↗
08/13/2026B00306939-I1Open ↗
08/13/2026B00306976-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00306976-P2Open ↗
09/01/2026B00306976-P3Open ↗
08/22/2026B00306976-P1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/12/2020321990164Open ↗
03/12/2020321990164Open ↗
▸Safety & Tenant Protection3
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
12/15/2020321990164Open ↗
03/12/2020321990164Open ↗
▸BISTenant Protection Plan and Notes1
03/12/2020321990164Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026B00307040-I1Open ↗
08/13/2026B00306976-I1Open ↗
08/13/2026B00306939-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
12/15/2020321990164Open ↗
▸Energy Compliance11
▸BISAIR SEALING AND INSULATION - VISUAL1
05/15/2023321990164Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/15/2023321990164Open ↗
▸BISFENESTRATION AREAS1
05/15/2023321990164Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/15/2020321990164Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/15/2023321990164Open ↗
▸BISLIGHTING IN DWELLING UNITS1
05/15/2023321990164Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/15/2023321990164Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/15/2023321990164Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/12/2020321990164Open ↗
▸BISFENESTRATION AIR LEAKAGE1
05/15/2023321990164Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00306939-I1Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/15/2020321990164Open ↗
12/15/2020321990164Open ↗
12/01/2020321990164Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
05/11/2023321990164Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
05/11/2023321990164Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
05/11/2023321990164Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/15/2023321990164Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/15/2023321990164Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
05/11/2023321990164Open ↗
▸BISMASONRY1
05/11/2023321990164Open ↗
▸BISPOST-INSTALLED ANCHORS1
05/11/2023321990164Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
05/11/2023321990164Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
05/11/2023321990164Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
05/11/2023321990164Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
05/11/2023321990164Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/16/2023321990164Open ↗
▸BISLANDMARKS SIGNOFF1
05/16/2023321990164Open ↗
▸BISFINAL1
05/15/2023321990164Open ↗
▸BISLANDMARKS APPROVAL1
07/06/2020321990164Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
03/12/2020321990164Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/15/2023321990164Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
12/15/2020321990164Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
03/12/2020321990164Open ↗
03/12/2020321990164Open ↗
▸Other Documents2
▸BISVESTIBULES1
05/15/2023321990164Open ↗
▸BISFIREPLACES1
05/15/2023321990164Open ↗