← Back
Three families
201 WEIRFIELD STREET
BROOKLYN · Bushwick (East) · BIN 3078324
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6Zoning
2,700 sfGross Floor Area
3Units
Three families · 2,000 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 11p · 1 filing · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/05/2020$1.3M—— → —$481/sf building
09/23/2013$424K—Private party → Private party$157/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK AMBROSINO706/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ENKAY DESIGN CONSULTING1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOCKMANN HILL GROUP INCGeneral Contractor507/08/2026
LOTUS ELECTRICElectrical103/22/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC7137106/12/2024
AMBROSINO ARCHITECTS6357609/27/2023
INTEGRITY CONSULTING SERV666107/28/2022
Building Lifecycle
All (51)Filed (7)Permit Issued (5)Signed Off (4)Inspection (5)Special Inspection (30)
07/07/2025
Signed off — Alteration
STRUCTURAL SCOPE OF WORK IN-CONJUNCTION WITH INTERIOR AND EXTERIOR RENOVATION GENERAL CONSTRUCTION APPLICATION. NO PROPOSED CHANGE TO USE, EGRESS AND OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
B00765710-I1
07/29/2024
Permit issued — Structural
B00765710-I1-ST
06/13/2024
Special inspection requirement — Concrete - Cast-In-Place
ALEKSANDR LEVIN
06/13/2024
Special inspection requirement — Structural Steel - Welding
ALEKSANDR LEVIN
06/13/2024
Special inspection requirement — Structural Steel - Details
ALEKSANDR LEVIN
06/13/2024
Special inspection requirement — Structural Wood Frame
Frank Ambrosino
06/13/2024
Special inspection requirement — Final
Frank Ambrosino
06/13/2024
Special inspection requirement — Subgrade Inspections
Frank Ambrosino
06/13/2024
Special inspection requirement — Structural Steel - High Strength Bolting
ALEKSANDR LEVIN
06/12/2024
Filed — Alteration
STRUCTURAL SCOPE OF WORK IN-CONJUNCTION WITH INTERIOR AND EXTERIOR RENOVATION GENERAL CONSTRUCTION APPLICATION. NO PROPOSED CHANGE TO USE, EGRESS AND OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
B00765710-P2
05/31/2024
Special inspection requirement — Concrete - Cast-In-Place
SHAHIN BADALY
05/31/2024
Special inspection requirement — Structural Steel - High Strength Bolting
SHAHIN BADALY
05/31/2024
Special inspection requirement — Structural Steel - Welding
SHAHIN BADALY
05/31/2024
Special inspection requirement — Structural Wood Frame
05/31/2024
Special inspection requirement — Final
05/31/2024
Special inspection requirement — Subgrade Inspections
05/31/2024
Special inspection requirement — Structural Steel - Details
SHAHIN BADALY
10/31/2023
Signed off — Alteration
B00630589-I1
10/31/2023
Signed off — Alteration
MECHANICAL SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION OF EXISTING DWELLING UNIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00782495-I1
10/30/2023
Signed off — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION OF EXISTING DWELLING UNIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00632355-I1
10/23/2023
Permit issued — General Construction
B00630589-I1-GC
10/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Ambrosino
10/19/2023
Special inspection requirement — Energy Code Compliance Inspections
Frank Ambrosino
10/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Ambrosino
09/27/2023
Filed — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION OF EXISTING DWELLING UNIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00632355-P2
06/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Ambrosino
06/29/2023
Special inspection requirement — Energy Code Compliance Inspections
Frank Ambrosino
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Ambrosino
06/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/06/2023
Filed — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION OF EXISTING DWELLING UNIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00632355-P1
12/27/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Ambrosino
12/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Ambrosino
12/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Frank Ambrosino
12/23/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/27/2022
Permit issued — Plumbing
B00632355-I1-PL
10/26/2022
Permit issued — Mechanical Systems
B00782495-I1-MS
10/25/2022
Permit issued — General Construction
B00630589-I1-GC
08/30/2022
Filed — Alteration
MECHANICAL SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION OF EXISTING DWELLING UNIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00782495-I1
08/16/2022
Special inspection requirement — Maintenance information
Frank Ambrosino
08/16/2022
Special inspection requirement — HVAC-R and service water heating system controls
Frank Ambrosino
08/16/2022
Special inspection requirement — Energy Code Compliance Inspections
Frank Ambrosino
08/16/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Ambrosino
08/16/2022
Special inspection requirement — HVAC-R and service water heating equipment
Frank Ambrosino
07/29/2022
Filed — Alteration
B00630589-I1
07/29/2022
Filed — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION OF EXISTING DWELLING UNIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00632355-I1
07/28/2022
Filed — Alteration
STRUCTURAL SCOPE OF WORK IN-CONJUNCTION WITH INTERIOR AND EXTERIOR RENOVATION GENERAL CONSTRUCTION APPLICATION. NO PROPOSED CHANGE TO USE, EGRESS AND OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
B00765710-I1
07/27/2022
Special inspection requirement — Mechanical Systems
Frank Ambrosino
07/27/2022
Special inspection requirement — Final
Frank Ambrosino
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offHOCKMANN HILL GROUP07/29/2024
DOB NOWGeneral ConstructionSigned-offHOCKMANN HILL GROUP10/23/2023
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR10/27/2022
DOB NOWMechanical SystemsSigned-offHOCKMANN HILL GROUP10/26/2022
DOB NOWGeneral ConstructionSigned-offHOCKMANN HILL GROUP10/25/2022
1 project · most recent 07/22/2024
General Wiring
FiledStatusContractorScope
07/22/2024CompleteLOTUS ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/13/2024Concrete - Cast-In-PlaceALEKSANDR LEVINspecial
06/13/2024Structural Steel - WeldingALEKSANDR LEVINspecial
06/13/2024Structural Steel - DetailsALEKSANDR LEVINspecial
06/13/2024Structural Wood FrameFrank Ambrosinoprogress
06/13/2024FinalFrank Ambrosinoprogress
06/13/2024Subgrade InspectionsFrank Ambrosinospecial
06/13/2024Structural Steel - High Strength BoltingALEKSANDR LEVINspecial
05/31/2024Concrete - Cast-In-PlaceSHAHIN BADALYspecial
05/31/2024Structural Steel - High Strength BoltingSHAHIN BADALYspecial
05/31/2024Structural Steel - WeldingSHAHIN BADALYspecial
05/31/2024Structural Wood Frame—progress
05/31/2024Final—progress
05/31/2024Subgrade Inspections—special
05/31/2024Structural Steel - DetailsSHAHIN BADALYspecial
10/19/2023Fire-Resistant Penetrations and JointsFrank Ambrosinospecial
10/19/2023Energy Code Compliance InspectionsFrank Ambrosinoprogress
10/19/2023HVAC-R and service water piping design and insulationFrank Ambrosinoenergy_progress
06/29/2023HVAC-R and service water piping design and insulationFrank Ambrosinoenergy_progress
06/29/2023Energy Code Compliance InspectionsFrank Ambrosinoprogress
06/29/2023Fire-Resistant Penetrations and JointsFrank Ambrosinospecial
12/27/2022HVAC-R and service water piping design and insulationFrank Ambrosinoenergy_progress
12/27/2022Fire-Resistant Penetrations and JointsFrank Ambrosinospecial
12/27/2022Energy Code Compliance InspectionsFrank Ambrosinoprogress
08/16/2022Maintenance informationFrank Ambrosinoenergy_progress
08/16/2022HVAC-R and service water heating system controlsFrank Ambrosinoenergy_progress
Latest 25 of 30.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00765710-P2Request digital key ↗
08/29/2026B00765710-I1Request digital key ↗
08/28/2026B00782495-I1Request digital key ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026B00782495-I1Open ↗
09/01/2026B00782495-I1Open ↗
09/01/2026B00782495-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00782495-I1Open ↗
08/30/2026B00632355-P1Open ↗
08/28/2026B00765710-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026B00765710-P2Open ↗
08/29/2026B00765710-I1Open ↗
08/13/2026B00782495-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026B00765710-P2Open ↗
08/29/2026B00765710-I1Open ↗
08/13/2026B00782495-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026B00632355-I1Open ↗
08/13/2026B00630589-I1Open ↗
08/13/2026B00782495-I1Open ↗