Condo, residential tower (mixed-use, multi-family elevator) [derived]
Vesta 17 Condominium
201 WEST 17 STREET · Chelsea-Hudson Yards · BIN 1086067
💬 Discuss this project
2000Year Built
12Stories
RMBuilding Class
C6-3AZoning
71,206 sfGross Floor Area
39Units
LL97 CoveredRent Stabilized14 Open Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 7,542 sf lot · 9.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentCivilGeneral
Roof9p · 3 filings · 10 docs
Floor 14p · 1 filing · 3 docs
Site & exterior30p · 4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES, INC.3207/08/2026
VESTA 17 CONDOMINIUM1103/21/2026
MICDAN1003/21/2026
7TH AVENUE RETAIL703/21/2026
KINGS GROUP NY CORP503/22/2026
VESTA GROUP403/21/2026
TREVI 7TH AVENUE RETAIL403/21/2026
717 PARTNERS203/21/2026
MICDAN 17T203/21/2026
EMC, LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STONE ENGINEERING & ARCHITECTURE DP203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
BUILDING BROTHERS203/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor1007/08/2026
ADELPHI RESTORATION CORPGeneral Contractor403/21/2026
KINGS GROUP NY CORPGeneral Contractor303/21/2026
HARARI DAVIDElectrical103/21/2026
RAYMOND MCQUILLANElectrical103/21/2026
MAUCERI SIGNScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENTHINK ENGINEERS LLC6247102/02/2023
GEORGE J. XERAKIAS, PE1658101/20/2023
STONE ENGINEERING & ARCHI1362101/20/2023
Building Lifecycle
All (104)Filed (9)Permit Issued (10)Signed Off (6)Facade (FISP) (15)Violation (59)Special Inspection (5)
03/19/2024
Signed off — Alteration
ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FAADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH.
M00813914-I1
03/19/2024
Signed off — Alteration
M00801306-I1
03/12/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00821825-I1
02/14/2024
Cycle 9 facade report submitted
02/14/2024
Cycle 9 facade report signed — SAFE
02/01/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00821824-I1
02/01/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M00821505-I1
01/30/2024
Permit issued — Supported Scaffold
M00821824-I1-SF
01/30/2024
Permit issued — Sidewalk Shed
M00821825-I1-SH
01/30/2024
Permit issued — Protection and Mechanical Methods
M00821505-I1-PMM
01/23/2024
Cycle 9 facade inspection completed
11/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/12/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00821824-P1
03/22/2023
Permit issued — General Construction
M00801306-I1-GC
02/20/2023
Cycle 9 facade report submitted
02/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/17/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00821825-P1
02/16/2023
Cycle 9 facade report signed — UNSAFE
02/02/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00821825-I1
02/02/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00821824-I1
02/02/2023
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M00821505-I1
02/02/2023
Permit issued — Sidewalk Shed
M00821825-I1-SH
02/02/2023
Permit issued — Supported Scaffold
M00821824-I1-SF
02/02/2023
Permit issued — Protection and Mechanical Methods
M00821505-I1-PMM
01/31/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sunil Saigal
01/20/2023
Filed — Alteration
M00801306-I1
01/18/2023
Filed — Alteration
ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FAADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH.
M00813914-I1
01/18/2023
Permit issued — Supported Scaffold
M00813914-I1-SF
01/18/2023
Cycle 9 facade inspection completed
12/19/2022
Special inspection requirement — Masonry
Evan Petkanas
12/19/2022
Special inspection requirement — Tenant Protection Plan Compliance
George Xerakias
12/19/2022
Special inspection requirement — Final
Evan Petkanas
09/07/2022
Violation issued (ECB, closed)
Construction
09/07/2022
Violation issued (ECB, closed)
Construction
06/16/2022
Violation issued (ECB, closed)
Elevators
05/12/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/2021
Violation issued (ECB, closed)
Construction
02/10/2021
Violation issued (ECB, closed)
Construction
02/19/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/19/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/19/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/24/2019
Signed off — Alteration
M00172278-I1
05/28/2019
Filed — Alteration
M00172278-I1
05/28/2019
Permit issued — Sidewalk Shed
M00172278-I1-SH
01/31/2019
Cycle 8 facade inspection completed
01/31/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/26/2019
Cycle 8 facade report signed — SWARMP
01/25/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/25/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/05/2018
Permit issued — Sign
M00026415-I1-SG
06/01/2018
Filed — Alteration
REPLACEMENT OF ILLUMINATED WALL SIGN (WELLS FARGO)
M00026415-I1
03/12/2018
Special inspection requirement — Final
LEON SKVIRSKY
02/16/2018
Cycle 8 facade report submitted
01/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/13/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/13/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/13/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC01/30/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC01/30/2024
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC01/30/2024
DOB NOWGeneral ConstructionSigned-offADELPHI RESTORATION CORP03/22/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC02/02/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC02/02/2023
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC02/02/2023
DOB NOWSupported ScaffoldSigned-offADELPHI RESTORATION CORP01/18/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP05/28/2019
DOB NOWSignPermit IssuedMAUCERI SIGN CO., INC06/05/2018
BISPLISSUEDGENESIS PLBG AND HTG CORP08/17/2021
BISOTISSUEDRJB CONTRACTING CARTING CORP10/14/2020
BISPLISSUEDGENESIS PLBG AND HTG CORP08/18/2020
BISPLISSUEDCC CONTROLLED PLBG CO INC10/16/2018
BISPLISSUEDGENESIS PLBG AND HTG CORP08/16/2018
BISPLISSUEDORBIT PLBG & HTG INC09/27/2017
BISOTISSUEDK.J. REMODELING OF NY CO*09/15/2017
BISMHISSUEDK.J. REMODELING OF NY CO*09/15/2017
BISPLISSUEDCC CONTROLLED PLBG CO INC08/22/2017
BISPLISSUEDGENESIS PLBG AND HTG CORP06/23/2017
BISPLISSUEDGENESIS PLBG AND HTG CORP06/01/2016
BISOTISSUEDOCA BUILDERS INC05/31/2016
BISEQISSUEDDYNAMIC BRIDGE & SCAFFOLD04/05/2012
BISEQISSUEDSPRING SCAFFOLDING LLC08/24/2011
BISEQISSUEDDYNAMIC BRIDGE & SCAFFOLD07/18/2011
BIS—ISSUEDAMERICAN SIGN & ELECL CON02/02/2011
BIS—ISSUEDAMERICAN SIGN & ELECL CON02/02/2011
BIS—ISSUEDAMERICAN SIGN & ELECL CON02/02/2011
BISOTISSUEDCITY RENOVAT N.Y. INC12/21/2010
BISBLISSUEDRICHARD LYNE'S PLBG&HTGCO02/18/2009
BISPLISSUEDRICHARD LYNE'S PLBG&HTGCO12/09/2008
BISSPISSUEDASCO SPRINKLER CO.,INC04/11/2006
BISPLISSUEDPAR PLUMBING CO., INC10/13/2005
BIS—ISSUEDNATIONAL MAINTENANCE10/04/2005
BIS—ISSUEDNATIONAL MAINTENANCE10/04/2005
BIS—ISSUEDNATIONAL MAINTENANCE10/04/2005
BISEQISSUEDTRI-LINE CONTRACTING CORP.08/25/2005
BISOTISSUEDTRI-LINE CONTRACTING CORP.08/25/2005
BISOTISSUEDSTRUCTURE TONE, LLC08/19/2005
BISEQISSUEDSTRUCTURE TONE, LLC08/19/2005
+ 20 more permits on file
6 projects · most recent 09/25/2026
General Wiring
FiledStatusContractorScope
09/25/2026Permit IssuedFALCO ELEC'L SERVICES INCGeneral Wiring
06/20/2024CompleteP & Z ELECTRIC CORPGeneral Wiring
01/30/2023CompleteBOROWIDE ELECT'L CONTR'S—
04/27/2021CompleteLEADER ELECTRIC CO., INCGeneral Wiring
05/28/2019Permit IssuedRICHARD NEU—
05/22/2018CompleteAMERICAN SIGN & ELECL CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/31/2023Structural Stability – Alterations of existing buildingsSunil Saigalspecial
12/19/2022MasonryEvan Petkanasspecial
12/19/2022Tenant Protection Plan ComplianceGeorge Xerakiasspecial
12/19/2022FinalEvan Petkanasprogress
03/12/2018FinalLEON SKVIRSKYprogress
▾Documents — 224 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
09/06/2026M00026415-I1Request digital key ↗
09/01/2026M00813914-I1Request digital key ↗
09/01/2026M00801306-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00172278-I1Request digital key ↗
▸Applications & Permits51
▸BISPLAN / WORK APPROVAL APPLICATION32
12/31/2025140940775Open ↗
07/15/2025140494560Open ↗
07/15/2025140494560Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION19
05/27/2025140494560Open ↗
10/14/2020140940775Open ↗
09/29/2017123106931Open ↗
Showing 3 of 19 on file for this type
▸Seals & Professional Certifications47
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
02/21/2020123122085Open ↗
02/21/2020123122085Open ↗
10/18/2018123106931Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/06/2026M00026415-I1Open ↗
09/05/2026M00172278-I1Open ↗
08/31/2026M00821825-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
08/24/2017123122085Open ↗
09/06/2011120803862Open ↗
07/20/2011120754843Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
09/06/2011120803862Open ↗
07/20/2011120754843Open ↗
02/02/2011120589764Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/19/2020140940775Open ↗
08/24/2017123122085Open ↗
05/19/2016140494560Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026M00801306-I1Open ↗
08/29/2026M00801306-I1Open ↗
08/26/2026M00821505-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/19/2020140940775Open ↗
05/19/2016140494560Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/19/2020140940775Open ↗
05/19/2016140494560Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026M00801306-I1Open ↗
08/26/2026M00026415-I1Open ↗
▸Trade Schedules & Equipment25
▸BISSCHEDULE B - PLUMBING9
07/15/2025140494560Open ↗
07/15/2025140494560Open ↗
06/03/2025140494560Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
12/31/2019123122085Open ↗
12/04/2019123122085Open ↗
01/04/2018140494560Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
11/24/2009110353983Open ↗
06/03/2009110353983Open ↗
11/13/2008110353983Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
08/25/2010110353983Open ↗
04/09/2009110353983Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
08/25/2010110353983Open ↗
▸BISEQUIPMENT USE PERMITS1
10/18/2018123106931Open ↗
▸BISPLUMBING (PL) SIGNOFF1
07/29/2025140494560Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
10/18/2018123106931Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES3
08/19/2020140940775Open ↗
05/19/2016140494560Open ↗
08/15/2017123106931Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
02/02/2011120589764Open ↗
02/02/2011120589700Open ↗
02/01/2011120589755Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/13/2008110353983Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/24/2017123122085Open ↗
▸BISASBESTOS: EXEMPTION (ASB4)1
08/15/2017123106931Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
02/21/2020123122085Open ↗
10/18/2018123106931Open ↗
10/18/2018123106931Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/16/2025140940775Open ↗
04/16/2025140494560Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/19/2020140940775Open ↗
05/19/2016140494560Open ↗
▸BISINTERIOR LIGHTING POWER2
12/16/2025140940775Open ↗
04/16/2025140494560Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
02/21/2020123122085Open ↗
10/18/2018123106931Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/19/2020140940775Open ↗
05/19/2016140494560Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
12/16/2025140940775Open ↗
04/16/2025140494560Open ↗
▸BISNYCECC ANALYSIS1
08/19/2020140940775Open ↗
▸BISTECHNICAL REPORT: ENERGY1
07/20/2011120754843Open ↗
▸BISLIGHTING IN DWELLING UNITS1
04/16/2025140494560Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/19/2020140940775Open ↗
05/31/2016140494560Open ↗
05/19/2016140494560Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/16/2025140940775Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/16/2025140494560Open ↗
▸Approvals, Objections & Sign-offs15
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
12/30/2025140940775Open ↗
07/29/2025140494560Open ↗
02/21/2020123122085Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
07/20/2011120754843Open ↗
02/02/2011120589764Open ↗
02/02/2011120589700Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/21/2020123122085Open ↗
▸BISFINAL1
12/16/2025140940775Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
07/15/2025140494560Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT13
08/19/2020140940775Open ↗
02/21/2020123122085Open ↗
10/18/2018123106931Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
12/16/2025140940775Open ↗
07/15/2025140494560Open ↗
▸Filing & Intake Forms23
▸BISBOROUGH INTAKE FORM8
05/27/2025140494560Open ↗
02/21/2020123122085Open ↗
12/23/2019123122085Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET7
08/24/2017123122085Open ↗
08/15/2017123106931Open ↗
08/15/2017123106931Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION5
06/13/2025140494560Open ↗
04/17/2025140494560Open ↗
02/19/2020123122085Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/19/2020140940775Open ↗
05/19/2016140494560Open ↗
09/06/2011120803862Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/30/2025140940775Open ↗
11/30/2010110353983Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
09/20/2017123106931Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00172278-I1Open ↗