RoofUnder Construction3p · 3 filings · 20 docs
ArchitectureCivilDMEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
THE STRUCTURAL SCOPE OF WORK INCLUDES ADDITION OF NEW STEEL BEAMS AND POSTS TO ACCOMMODATE THE ENLARGED OPENING AT THE FIRST FLOOR,DESIGN OF THE STAIR STRINGERS, AND INFILL OF AN EXISTING OPENING AT THE FIRST FLOOR
On file for this project
62 documents · 1 drawing sheet
Extending existing capped commercial kitchen exhaust riser on the exterior of the building from the second-floor setback roof to the main roof. No interior work. Total construction floor area: 0 square feet.
On file for this project
3 documents · 1 drawing sheet
Application filed for new mechanical unit as per plans filed herewith. No change to use egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
PenthouseUnder Construction1 filing · 6 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PHB, 17th floor. REMOVE PARTITION WALLS WHERE INDICATED. REPLACE KITCHEN, REPLACE PLUMBING FXITURES. NO CHANGE to occupancy, USE, OR EGRESS.
On file for this project
6 documents
Floor 172 filings
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Standpipe · Structural · Supported Scaffold
SHORING AND COLUMN REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY..
On file for this project
8 documents
EMERGENCY TEMPORARY SHORING FLOORS 14 THRU 17. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 164 filings · 6 docs
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Standpipe · Structural · Supported Scaffold
Interior renovation of Apartment 16F on the 16th floor. Scope includes non-structural partition modifications, installation of new kitchen appliances, replacement of existing finishes and flooring throughout, and updated bathroom/kitchen fixtures as per d
On file for this project
3 documents
Remove, relocate, and replace plumbing fixtures per plans on 16th floor Apt. 16F. Install new washer/dryer, lavatory, shower, and water closet. Relocate kitchen range and dishwasher. No gas work. No change to use or egress.
On file for this project
3 documents
SHORING AND COLUMN REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY..
On file for this project
8 documents
Latest 3 of 4 filings on this floor.
Floor 153 filings
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Standpipe · Structural · Supported Scaffold
Alteration to existing residential building.
On file for this project
32 documents
SHORING AND COLUMN REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY..
On file for this project
8 documents
EMERGENCY TEMPORARY SHORING FLOORS 14 THRU 17. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 141p · 3 filings
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Standpipe · Structural · Supported Scaffold
Alteration to existing residential building.
On file for this project
32 documents
SHORING AND COLUMN REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY..
On file for this project
8 documents · 1 drawing sheet
EMERGENCY TEMPORARY SHORING FLOORS 14 THRU 17. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 131p · 2 filings
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Standpipe · Structural · Supported Scaffold
Alteration to existing residential building.
On file for this project
32 documents
SHORING AND COLUMN REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY..
On file for this project
8 documents · 1 drawing sheet
Floor 122p · 1 filing
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Standpipe · Structural · Supported Scaffold
SHORING AND COLUMN REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY..
On file for this project
8 documents · 2 drawing sheets
Floor 111 filing
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Standpipe · Structural · Supported Scaffold
SHORING AND COLUMN REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY..
On file for this project
8 documents
Floor 10
Floor 9
Floor 8Under Construction1 filing · 10 docs
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Standpipe · Structural · Supported Scaffold
REPLACE, REMOVE, AND RELOCATE PLUMBING FIXTURES ACCORDING TO DRAWINGS. NEW WASHER/DRYER. NO CHANGES TO USE OR EGRESS.
On file for this project
10 documents
Floor 72 filings · 20 docs
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Standpipe · Structural · Supported Scaffold
Plumbing work as per plans herewith. No change to use, egress, or occupancy.
On file for this project
14 documents
Plumbing work as per plans herewith. No change to use, egress, or occupancy.
On file for this project
15 documents
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Under Construction20p · 7 filings · 20 docs
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
THE STRUCTURAL SCOPE OF WORK INCLUDES ADDITION OF NEW STEEL BEAMS AND POSTS TO ACCOMMODATE THE ENLARGED OPENING AT THE FIRST FLOOR,DESIGN OF THE STAIR STRINGERS, AND INFILL OF AN EXISTING OPENING AT THE FIRST FLOOR
On file for this project
62 documents · 8 drawing sheets
APPLICATION IS FILED FOR SPRINKLER WORK RELATED TO INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS,OR OCCUPANCY .
On file for this project
5 documents · 1 drawing sheet
Application filed for tenant plumbing improvements associated with installing new fixtures. No change to use, egress, or occupancy.
On file for this project
4 documents
Latest 3 of 7 filings on this floor.
CellarUnder Construction28p · 6 filings · 20 docs
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
THE STRUCTURAL SCOPE OF WORK INCLUDES ADDITION OF NEW STEEL BEAMS AND POSTS TO ACCOMMODATE THE ENLARGED OPENING AT THE FIRST FLOOR,DESIGN OF THE STAIR STRINGERS, AND INFILL OF AN EXISTING OPENING AT THE FIRST FLOOR
On file for this project
62 documents · 14 drawing sheets
APPLICATION IS FILED FOR SPRINKLER WORK RELATED TO INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS,OR OCCUPANCY .
On file for this project
5 documents · 1 drawing sheet
Application filed for tenant plumbing improvements associated with installing new fixtures. No change to use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Sub-Cellar4p · 1 filing
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Alteration to existing residential building.
On file for this project
32 documents · 4 drawing sheets
Site & exterior5 filings · 14 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Sign · Supported Scaffold
Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
22 documents · 4 drawing sheets
Latest 3 of 5 filings on this floor.
Filed — no permit issued4 filings · 5 docs
ArchitectureDMElectricalGeneralStructuralOther
No filed description on record for this project.
On file for this project
3 documents · 12 drawing sheets
Project M00660595Incomplete
No filed description on record for this project.
Project M00587627Objections
No filed description on record for this project.