← Back
BuildNYC
Apartment hotel
201 WEST 87TH STREET
MANHATTAN · BIN 1033209
💬 Discuss this project
1920Year Built
5Stories
H6Building Class
C1-9Zoning
19,200 sfGross Floor Area
4Units
Rent Stabilized12 Active Violations ▸
Apartment hotel · Owner of record: 201 West 87th Street · 3,992 sf lot · 4.81 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Plumbing fixture installation for corner deli store1p · 1 filing · 5 docs
CellarGas connection for gas/oil burner re-installation5p · 1 filing · 8 docs
Site & exteriorPipe scaffold for facade repair5p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
201 West 872103/21/2026
Kizner Associates903/22/2026
Jerrick Associates707/08/2026
87th Street General Partnership303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company202/11/2025
Ashraf109/03/2020
Scalar Architecture102/20/2019
Baileys Engineering107/06/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company403/21/2026
AE Design Solution403/21/2026
Tasheed Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jerrick AssociatesScaffold207/08/2026
East Coast MechnacialPlumbing107/08/2026
Star Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851202/11/2025
Building Lifecycle
All (82)Filed (5)Permit Issued (5)Signed Off (4)Violation (60)Inspection (5)Special Inspection (3)
09/01/2026
Signed off — Alteration
REFILE APPLICATON 110036595 FOR THE REPLACEMENT BOILER AND RE-INSTALLATION OF GAS/OIL BURNER.
M01161623-S1
10/10/2025
Signed off — Alteration
REFILE APPLICATON 110036595 FOR THE REPLACEMENT BOILER AND RE-INSTALLATION OF GAS/OIL BURNER.
M01161623-I1
08/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/20/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/30/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/14/2025
Permit issued — Plumbing
M01161623-S1-PL
04/14/2025
Permit issued — Boiler Equipment
M01161623-I1-BE
02/11/2025
Filed — Alteration
REFILE APPLICATON 110036595 FOR THE REPLACEMENT BOILER AND RE-INSTALLATION OF GAS/OIL BURNER.
M01161623-S1
02/11/2025
Filed — Alteration
REFILE APPLICATON 110036595 FOR THE REPLACEMENT BOILER AND RE-INSTALLATION OF GAS/OIL BURNER.
M01161623-I1
01/22/2025
Violation issued (HPD, closed)
C
01/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
01/02/2025
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
06/20/2024
Violation issued (HPD, open)
C
04/30/2024
Violation issued (HPD, closed)
B
04/30/2024
Violation issued (HPD, closed)
B
04/30/2024
Violation issued (HPD, closed)
B
04/30/2024
Violation issued (HPD, open)
C
04/01/2024
Violation issued (HPD, closed)
A
03/26/2024
Violation issued (HPD, closed)
B
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2022
Violation issued (HPD, closed)
A
10/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/13/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/14/2021
Violation issued (ECB, closed)
Construction
07/14/2021
Violation issued (ECB, closed)
Construction
07/14/2021
Violation issued (ECB, closed)
Construction
02/26/2021
Violation issued (HPD, closed)
B
01/11/2021
Violation issued (HPD, closed)
A
01/11/2021
Violation issued (HPD, closed)
A
12/03/2020
Violation issued (ECB, closed)
Elevators
11/13/2020
Permit issued — Plumbing
M00379603-I1-PL
09/03/2020
Filed — Alteration
Filing for the installation of plumbing fixtures and related piping for the corner deli store in conjunction with dob # 123728626
M00379603-I1
03/16/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/18/2019
Violation issued (ECB, closed)
Construction
05/16/2019
Violation issued (ECB, closed)
Elevators
04/16/2019
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00058440-I1
04/16/2019
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00130711-I1
02/22/2019
Permit issued — Supported Scaffold
M00130711-I1-SF
02/20/2019
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00130711-I1
02/13/2019
Special inspection requirement — Final
JULIO SALCEDO-FERNANDEZ
09/11/2018
Violation issued (ECB, closed)
Elevators
07/11/2018
Permit issued — Sidewalk Shed
M00058440-I1-SH
07/08/2018
Violation issued (HPD, closed)
C
07/08/2018
Violation issued (HPD, closed)
C
07/06/2018
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00058440-I1
06/22/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/18/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/2017
Violation issued (ECB, closed)
Boilers
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offEast Coast Mechnacial04/14/2025
DOB NOWBoiler EquipmentSigned-offEast Coast Petroleum04/14/2025
DOB NOWPlumbingSigned-offStar Plumbing & Heating11/13/2020
DOB NOWSupported ScaffoldSigned-offGE 2A Construction02/22/2019
DOB NOWSidewalk ShedSigned-offGE 2A Construction07/11/2018
BIS—ISSUEDJerrick Associates03/01/2024
BIS—ISSUEDJerrick Associates02/22/2024
BISOTISSUEDLV Contracting Solutions12/03/2020
BISOTISSUEDLV Contracting Solutions01/07/2020
BIS—ISSUEDJerrick Associates07/25/2018
BISSPISSUEDBig Apple Fire Sprinkler Co I05/08/2014
BISBLISSUEDEast Coast Petroleum07/15/2013
BISPLISSUEDEast Coast Mechanical07/15/2013
BIS—ISSUEDMetropolitan Sign & Rig04/17/2012
BIS—ISSUEDMetropolitan Sign & Rig02/16/2012
BIS—ISSUEDMetropolitan Sign & Rig01/24/2012
BISOTISSUEDMetropolitan Sign & Riggi01/09/2012
BISEQISSUEDSim Soon Construction04/14/2011
BIS—ISSUEDSim Soon Construction04/06/2011
BISEQISSUEDPhoenix Bridging02/23/2011
BISEQISSUEDSim Soon Construction02/22/2011
BISOTISSUEDS & M Contracting and Wat11/12/2009
BISPLISSUEDFlint Mechanical11/10/2009
BISFBISSUEDDouglas Simmons03/17/2008
BISPLRE-ISSUEDMaxium Mechanical03/17/2008
BISBLISSUEDJack Piccini05/25/2000
BISSPISSUEDMagor Plumbing & Heating03/16/1998
BISPLISSUEDMagor Plumbing & Heating09/08/1997
BISOTISSUEDWKL Construction09/03/1997
2 projects · most recent 02/11/2025
Gas Water/Sanitary
FiledStatusContractorScope
02/11/2025Signed-offEast Coast MechnacialGas
09/03/2020Signed-offStar Plumbing & HeatingWater/Sanitary
5 projects · most recent 01/05/2024
General Wiring Boiler Controls Lighting
FiledStatusContractorScope
01/05/2024CompleteJay United Electrical ContngBoiler Controls
04/02/2021Permit IssuedPrincipal ElectricalGeneral Wiring
01/21/2021CompleteAA Safety ElectricGeneral Wiring, Lighting
05/11/2020CompleteTitan Electrical & Elev Contracting—
07/09/2018CompleteBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/26/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/20/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/30/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
01/02/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
01/02/2025Energy Code Compliance InspectionsLOUIS ARENAprogress
02/13/2019FinalJULIO SALCEDO-FERNANDEZprogress
▾Documents — 336 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
09/06/2026M00058440-I1Request digital key ↗
08/24/2026M01161623-S1Request digital key ↗
08/24/2026M01161623-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00130711-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00379603-I1Request digital key ↗
▸Applications & Permits59
▸BISPLAN / WORK APPROVAL APPLICATION36
12/09/2025110036595Open ↗
02/16/2024120451082Open ↗
01/06/2020123728626Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION22
02/22/2024120451082Open ↗
01/07/2020123728626Open ↗
12/31/2019123726888Open ↗
Showing 3 of 22 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications82
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION34
02/07/2020123726888Open ↗
02/03/2020123726888Open ↗
01/06/2020123728626Open ↗
Showing 3 of 34 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST19
01/06/2020123728626Open ↗
12/26/2013121866105Open ↗
07/27/2012121148926Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM17
07/27/2012121148926Open ↗
07/18/2012121148784Open ↗
07/18/2012121141264Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/06/2026M00058440-I1Open ↗
08/24/2026M01161623-I1Open ↗
08/24/2026M01161623-S1Open ↗
Showing 3 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)2
01/06/2020123728626Open ↗
01/06/2020123728626Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026M01161623-S1Open ↗
08/28/2026M00130711-I1Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/26/2013121866105Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026M01161623-S1Open ↗
▸Trade Schedules & Equipment9
▸BISSELF-CERT PLUMBING NOTICE3
12/09/2014121866105Open ↗
10/08/2014121866105Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
04/18/2014110036595Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING2
12/26/2013121866105Open ↗
Showing 1 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
06/22/2021120751926Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection21
▸BISANTI-HARASSMENT CHECKLIST: CLINTON7
07/27/2012121148926Open ↗
07/18/2012121148784Open ↗
07/18/2012121141264Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist5
09/06/2026M00058440-I1Open ↗
08/13/2026M01161623-I1Open ↗
08/13/2026M01161623-S1Open ↗
Showing 3 of 5 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST4
01/07/2020123728626Open ↗
12/26/2013121866105Open ↗
Showing 2 of 4 on file for this type
▸BISTenant Protection Plan and Notes1
01/06/2020123728626Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
12/27/2019123726888Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist1
06/22/2012121116381Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00379603-I1Open ↗
▸Environmental & Asbestos27
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'12
05/01/2012121047615Open ↗
04/19/2012121037840Open ↗
04/05/2012120993103Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
01/06/2020123728626Open ↗
12/27/2019123726888Open ↗
12/26/2013121866105Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M00379603-I1Open ↗
08/13/2026M00130711-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
02/07/2020123726888Open ↗
02/03/2020123726888Open ↗
01/06/2020123728626Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
02/07/2020123726888Open ↗
02/03/2020123726888Open ↗
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs50
▸BISADMINISTRATIVE OBJECTIONS21
12/26/2013121866105Open ↗
07/27/2012121148926Open ↗
07/18/2012121148784Open ↗
Showing 3 of 21 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
07/19/2021120751926Open ↗
02/07/2020123726888Open ↗
02/03/2020123726888Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
07/25/2019120451082Open ↗
07/25/2019120451082Open ↗
05/15/2019120451082Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/06/2012120993103Open ↗
02/17/2012120975515Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
02/28/2013121037840Open ↗
02/28/2013121037840Open ↗
▸BISSUPERSEDING LETTER1
07/25/2018120451082Open ↗
▸BISHPD LETTER OF DEFERRAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT27
07/14/2021120751926Open ↗
02/07/2020123726888Open ↗
02/03/2020123726888Open ↗
Showing 3 of 27 on file for this type
▸Filing & Intake Forms41
▸BISEFILING COVER SHEET21
01/06/2020123728626Open ↗
12/30/2019123726888Open ↗
12/26/2013121866105Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION14
01/27/2020120451082Open ↗
07/23/2019120451082Open ↗
04/09/2019120451082Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM5
02/22/2024120451082Open ↗
02/07/2020123726888Open ↗
02/03/2020123726888Open ↗
Showing 3 of 5 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
02/28/2013121037840Open ↗
04/19/2012121037840Open ↗
01/25/2012120941918Open ↗
Showing 3 of 4 on file for this type
▸BISSupporting Document: Fee Exempt1
04/23/2012121037840Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type