← Back
BuildNYC
Two stories - detached, small or mid-size
2011 BAY RIDGE PARKWAY
BROOKLYN · Bensonhurst · BIN 3159813
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R5Zoning
2,096 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,800 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAlteration at 2011 Bay7p · 2 filings · 20 docs
AtticAlteration at 2011 Bay18p · 1 filing · 20 docs
Floor 2Alteration at 2011 Bay21p · 2 filings · 20 docs
Floor 1Concrete curb cut application24p · 3 filings · 20 docs
CellarAlteration at 2011 Bay28p · 2 filings · 20 docs
Site & exteriorTemporary construction fence application2p · 1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2021$930K—THE ROMAN CATHOLIC CHURCH OF ST. DOMINIC → Private party$444/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
An Shen Ma Architect606/08/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
William LiangGeneral Contractor803/21/2026
Splen ConstructionGeneral Contractor503/22/2026
William Liangspecialty_contractor403/21/2026
Splen ConstructionScaffold303/21/2026
Tri State Plumbing & HeatingPlumbing307/08/2026
An MaElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
An Shen Ma Architect2968406/08/2023
Building Lifecycle
06/06/2024
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B00496210-I1-GC
09/05/2023
Signed off — Alteration
B00496383-I1
08/12/2023
Signed off — Alteration
B00521270-I1
07/15/2023
Permit issued — Curb Cut
B00521270-I1-CC
07/13/2023
Signed off — Alteration
TO INSTALL OR RELOCATE PLUMBING FIXTURES IN ALTERED 2 STORY 2 FAMILY DWELLING. FILED IN CONJUNCTION W/ HOUSE ALT-CO #B00496210. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00515409-I1
60 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offWilliam Liang07/15/2023
DOB NOWGeneral ConstructionPermit IssuedWilliam Liang06/06/2023
DOB NOWMechanical SystemsSigned-offWilliam Liang08/01/2022
DOB NOWGeneral ConstructionSigned-offWilliam Liang08/01/2022
DOB NOWMechanical SystemsSigned-offWilliam Liang08/01/2022
DOB NOWStructuralSigned-offWilliam Liang08/01/2022
DOB NOWPlumbingSigned-offDW Plumbing06/30/2022
DOB NOWFoundationPermit IssuedSplen Construction04/25/2022
DOB NOWConstruction FenceSigned-offSplen Construction04/13/2022
1 project · most recent 06/08/2023
Heating Systems
FiledStatusContractorScope
06/08/2023Permit IssuedWilliam LiangHeating Systems
1 project · most recent 05/05/2022
General Wiring
FiledStatusContractorScope
05/05/2022CompleteIntelogic ElectricGeneral Wiring
1 project · most recent 06/08/2023
Wood
FiledStatusContractorScope
06/08/2023Permit IssuedWilliam LiangWood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/06/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/06/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/06/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
06/23/2023Heating SystemsAN MAspecial
06/23/2023Mechanical SystemsAN MAspecial
06/23/2023Subgrade InspectionsAN MAspecial
06/23/2023Fire-Resistant Penetrations and JointsAN MAspecial
06/23/2023Chimneys and ventsAN MAspecial
06/23/2023Structural Steel - High Strength BoltingAN MAspecial
06/23/2023Structural Stability – Alterations of existing buildingsAN MAspecial
06/23/2023MasonryAN MAspecial
06/23/2023Concrete - Cast-In-PlaceAN MAspecial
06/23/2023FinalAN MAprogress
06/23/2023Energy Code Compliance InspectionsAN MAprogress
06/23/2023Footing and FoundationAN MAprogress
06/23/2023Fire-Resistance Rated ConstructionAN MAprogress
06/23/2023Structural Wood FrameAN MAprogress
06/23/2023Air barrier - visual inspectionAN MAenergy_progress
06/23/2023HVAC-R and service water heating system controlsAN MAenergy_progress
06/23/2023Fenestration and door U-factor and product ratingsAN MAenergy_progress
06/23/2023Ventilation and air distribution systemAN MAenergy_progress
06/23/2023MeteringAN MAenergy_progress
06/23/2023Maintenance informationAN MAenergy_progress
06/23/2023HVAC-R and service water piping design and insulationAN MAenergy_progress
06/23/2023Fenestration air leakageAN MAenergy_progress
06/23/2023HVAC-R and service water heating equipmentAN MAenergy_progress
06/23/2023Permanent certificateAN MAenergy_progress
06/23/2023Interior lighting powerAN MAenergy_progress
Latest 25 of 62.
62 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account