4 Open Violations 3 unresolved · 1 paperwork only▸
ECB04/10/2026W/O A PERMIT. NOTED: FULL HEIGHT PARTITION WALLS ERECTED TO CHANGE FLR LAYOUT AT CELLAR LEVEL: CREATING ADDL'T BTHRM(S) & KITCHEN/COOKING SPACES., OBTAIN ALL PERMITS$1K due
ECB04/10/2026CONTRARY TO C-OF-O # 9811 WHICH INDICATES 2ND FLR AS RECEPTION RM, METER RM & OFFICES: AT TIME OF INSPECTION A RM WAS OBSERVED CREATED & USED AS A SLEEPING RM WITH BED, TOILETRIES, PERSONAL BELONGINGS., DISCONT$1K due
ECB04/10/2026W/O A PERMIT. NOTED: WATER & WASTE LINES OBSERVED THROUGHOUT FOR ADDL'T BTHRMS (SHOWER, SINKS, TOILETS), KITCHEN/COMMERCIAL SINKS. ADDL'T GAS LINES INSTALLED AT CELLAR FOR DEEP FRYERS EQUIPMENT., OBTAIN PERMIT$2K due
ECB04/10/2026W/O A PERMIT. NOTED: AT CELLAR - ELECTRICAL WIRING INSTALLED FOR ADDL'T LIGHTS, SWITCHES, OUTLETS., OBTAIN PERMITHearing held — result not yet published
Four families · 2,500 sf lot · 1.67 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.