← Back
Banking facility, with or without parking
2014 BARTOW AVENUE
BRONX · BIN 2072371
💬 Discuss this project
1974Year Built
1Stories
K7Building Class
C4-3Zoning
2,994 sfGross Floor Area
1Units
0 Open Violations
Banking facility, with or without parking · Owner of record: 2014 BARTOW, . · 19,900 sf lot · 0.15 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LORDAE MANAGEMENT1607/08/2026
2014 BARTOW, .103/22/2026
LORDAE PROPERTIES103/21/2026
LORDAE PROPERTY MANAGEMENT103/21/2026
HSBC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLG CONSULTATING ENGINEERS212/23/2024
DON M. DACUMOS412/19/2024
HNY CONSULTING ENGINEERS LLC412/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VANGUARD CONSTRUCTION ANDGeneral Contractor507/08/2026
WILLIAM C. GERAKARIS P&HPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC2003812/23/2024
Building Lifecycle
All (58)Filed (10)Permit Issued (5)Signed Off (5)Violation (5)Inspection (3)Special Inspection (30)
09/29/2025
Signed off — Alteration
CITIBANK-- PLUMBING MODIFICATIONS AND INSTALLATIONS FOR BANK RENOVATION AS PER PLANS FILED.
X01061890-I1
07/15/2025
Signed off — Alteration
CITIBANK-- Rooftop demolition and replacement on existing structure. Work in bank parking lot area, inclusive of demo, resurfacing, curbs, ADA ramps, and lines painting within property line.
X01094110-I1
07/14/2025
Signed off — Alteration
CITIBANK-- MECHANICAL MODIFICATIONS AND INSTALLATIONS RELATED TO BANK RENOVATION AS PER PLANS FILED.
X01061872-I1
06/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/27/2025
Signed off — Alteration
CITIBANK-- RENOVATIONS TO EXISTING BANK BUILDING INCLUSIVE OF MODIFICATIONS TO INTERIOR PARTITIONS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X01061856-I1
04/22/2025
Signed off — Alteration
CITIBANK-- Structural installations and modifications in conjunction with bank renovation.
X01104378-I1
01/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/24/2024
Special inspection requirement — Air barrier - visual inspection
Christopher Drutjons
12/24/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
12/24/2024
Special inspection requirement — Final
Christopher Drutjons
12/24/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Christopher Drutjons
12/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
12/24/2024
Special inspection requirement — Insulation placement and R values
Christopher Drutjons
12/24/2024
Special inspection requirement — Fenestration areas
Christopher Drutjons
12/23/2024
Filed — Alteration
CITIBANK-- Structural installations and modifications in conjunction with bank renovation.
X01104378-P1
12/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
12/23/2024
Special inspection requirement — Insulation placement and R values
Christopher Drutjons
12/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
12/23/2024
Special inspection requirement — Final
Christopher Drutjons
12/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
12/23/2024
Special inspection requirement — Air barrier continuity plan testing
Christopher Drutjons
12/23/2024
Special inspection requirement — Preliminary
Christopher Drutjons
12/23/2024
Special inspection requirement — Final
Christopher Drutjons
12/23/2024
Special inspection requirement — Structural Steel - Welding
Christopher Drutjons
12/23/2024
Special inspection requirement — Maintenance information
Christopher Drutjons
12/23/2024
Special inspection requirement — Concrete - Cast-In-Place
Christopher Drutjons
12/23/2024
Special inspection requirement — Masonry
Christopher Drutjons
12/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
12/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
12/20/2024
Special inspection requirement — Final
Christopher Drutjons
12/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
12/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
12/20/2024
Special inspection requirement — Interior lighting power
Christopher Drutjons
12/20/2024
Special inspection requirement — Maintenance information
Christopher Drutjons
12/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
12/20/2024
Special inspection requirement — Electrical motors and elevators
Christopher Drutjons
12/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
12/19/2024
Filed — Alteration
CITIBANK-- RENOVATIONS TO EXISTING BANK BUILDING INCLUSIVE OF MODIFICATIONS TO INTERIOR PARTITIONS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X01061856-P1
12/19/2024
Filed — Alteration
CITIBANK-- MECHANICAL MODIFICATIONS AND INSTALLATIONS RELATED TO BANK RENOVATION AS PER PLANS FILED.
X01061872-P1
12/19/2024
Filed — Alteration
CITIBANK-- Rooftop demolition and replacement on existing structure. Work in bank parking lot area, inclusive of demo, resurfacing, curbs, ADA ramps, and lines painting within property line.
X01094110-P1
12/19/2024
Filed — Alteration
CITIBANK-- PLUMBING MODIFICATIONS AND INSTALLATIONS FOR BANK RENOVATION AS PER PLANS FILED.
X01061890-P1
12/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/11/2024
Permit issued — Mechanical Systems
X01061872-I1-MS
10/11/2024
Permit issued — Structural
X01104378-I1-ST
10/11/2024
Permit issued — General Construction
X01061856-I1-GC
10/11/2024
Permit issued — Plumbing
X01061890-I1-PL
09/11/2024
Filed — Alteration
CITIBANK-- Structural installations and modifications in conjunction with bank renovation.
X01104378-I1
09/06/2024
Filed — Alteration
CITIBANK-- RENOVATIONS TO EXISTING BANK BUILDING INCLUSIVE OF MODIFICATIONS TO INTERIOR PARTITIONS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X01061856-I1
09/05/2024
Filed — Alteration
CITIBANK-- PLUMBING MODIFICATIONS AND INSTALLATIONS FOR BANK RENOVATION AS PER PLANS FILED.
X01061890-I1
09/05/2024
Filed — Alteration
CITIBANK-- MECHANICAL MODIFICATIONS AND INSTALLATIONS RELATED TO BANK RENOVATION AS PER PLANS FILED.
X01061872-I1
09/03/2024
Permit issued — General Construction
X01094110-I1-GC
08/27/2024
Filed — Alteration
CITIBANK-- Rooftop demolition and replacement on existing structure. Work in bank parking lot area, inclusive of demo, resurfacing, curbs, ADA ramps, and lines painting within property line.
X01094110-I1
04/27/2023
Violation issued (ECB, closed)
Construction
04/27/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/11/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/11/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/11/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offVANGUARD CONSTRUCTION AND10/11/2024
DOB NOWStructuralSigned-offVANGUARD CONSTRUCTION AND10/11/2024
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND10/11/2024
DOB NOWPlumbingSigned-offWILLIAM C. GERAKARIS P&H10/11/2024
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND09/03/2024
BISMHISSUEDCOUNTY FAIR AIR CONDITION11/14/2013
BISPLISSUEDM&T PLBG AND HTG CO., INC07/28/2000
BISMHISSUEDADELHAARDT CONSTRUCTION CORP.06/12/2000
BISOTRE-ISSUEDJAMES KENNEDY & CO07/10/1996
BISEQISSUEDJAMES KENNEDY & CO07/10/1996
BIS—ISSUEDGOING SIGN CO.08/24/1993
BIS—ISSUEDGOING SIGN CO.08/24/1993
1 project · most recent 07/03/2025
General Wiring
FiledStatusContractorScope
07/03/2025CompleteA.S.K. ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
12/24/2024Fenestration areasChristopher Drutjonsenergy_progress
12/24/2024Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
12/24/2024Energy Code Compliance InspectionsChristopher Drutjonsprogress
12/24/2024FinalChristopher Drutjonsprogress
12/24/2024Fenestration and door U-factor and product ratingsChristopher Drutjonsenergy_progress
12/24/2024Insulation placement and R valuesChristopher Drutjonsenergy_progress
12/24/2024Air barrier - visual inspectionChristopher Drutjonsenergy_progress
12/23/2024Structural Steel - WeldingChristopher Drutjonsspecial
12/23/2024Concrete - Cast-In-PlaceChristopher Drutjonsspecial
12/23/2024Insulation placement and R valuesChristopher Drutjonsenergy_progress
12/23/2024Air barrier continuity plan testingChristopher Drutjonsenergy_progress
12/23/2024Energy Code Compliance InspectionsChristopher Drutjonsprogress
12/23/2024FinalChristopher Drutjonsprogress
12/23/2024HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
12/23/2024PreliminaryChristopher Drutjonsprogress
12/23/2024HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
12/23/2024HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
12/23/2024Maintenance informationChristopher Drutjonsenergy_progress
12/23/2024Energy Code Compliance InspectionsChristopher Drutjonsprogress
12/23/2024FinalChristopher Drutjonsprogress
12/23/2024MasonryChristopher Drutjonsspecial
12/20/2024FinalChristopher Drutjonsprogress
12/20/2024Post-installed AnchorsChristopher Drutjonsspecial
12/20/2024Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
12/20/2024Mechanical SystemsChristopher Drutjonsspecial
Latest 25 of 61.
▾Documents — 147 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026X01094110-P1Request digital key ↗
08/21/2026X01094110-I1Request digital key ↗
08/21/2026X01061872-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION5
08/03/2016220521488Open ↗
03/22/2016220521488Open ↗
04/22/2014220341734Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION1
11/18/2013220341734Open ↗
▸Seals & Professional Certifications69
▸DOB NOWProgress Inspector Seal & Signature25
09/25/2026X01061872-P1Open ↗
09/25/2026X01061872-P1Open ↗
09/25/2026X01061872-P1Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
11/27/2019200368761Open ↗
11/27/2019200368761Open ↗
11/27/2019200368761Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/25/2026X01061872-P1Open ↗
09/25/2026X01061872-P1Open ↗
09/25/2026X01061872-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/21/2026X01094110-I1Open ↗
08/21/2026X01061872-I1Open ↗
08/21/2026X01061872-P1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/24/2013220341734Open ↗
08/19/2008210064179Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/24/2013220341734Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/19/2008210064179Open ↗
▸Trade Schedules & Equipment4
▸BISEQUIPMENT USE APPLICATION/PERMIT2
05/02/2014220341734Open ↗
02/11/2014220341734Open ↗
▸BISEQUIPMENT USE PERMITS1
05/02/2014220341734Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/20/2017220521488Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/24/2013220341734Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/21/2026X01061872-I1Open ↗
08/20/2026X01061890-I1Open ↗
08/13/2026X01061856-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026X01094110-I1Open ↗
08/13/2026X01094110-P1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/24/2013220341734Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/19/2008210064179Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/22/2016220521488Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/11/2014220341734Open ↗
11/18/2013220341734Open ↗
10/24/2013220341734Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/11/2014220341734Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
01/15/2020200368761Open ↗
12/10/2019200368761Open ↗
11/27/2019200368761Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
09/23/2019200265097Open ↗
09/23/2019200265122Open ↗
09/16/2019200624725Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
08/19/2008210064179Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
09/23/2019200265113Open ↗
09/23/2019200265097Open ↗
09/23/2019200265104Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms15
▸BISBOROUGH INTAKE FORM12
01/15/2020200368761Open ↗
12/10/2019200368761Open ↗
11/27/2019200368761Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET3
03/22/2016220521488Open ↗
10/24/2013220341734Open ↗
08/19/2008210064179Open ↗