← Back
BuildNYC
Walk-up cooperative
2015 SOUTHERN BOULEVARD
BRONX · BIN 2013093
💬 Discuss this project
1931Year Built
6Stories
C6Building Class
R7-1Zoning
90,600 sfGross Floor Area
107Units
LL97 CoveredRent Stabilized39 Active Violations 37 unresolved · 2 paperwork only ▸
Walk-up cooperative · Owner of record: Trinity 3 in 1 Housing Development Fund · 17,245 sf lot · 5.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMaterial hoist system for facade restorationUnder Construction5p · 3 filings · 20 docs
Floor 61 filing · 2 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1New door installation2p · 4 filings · 12 docs
Site & exteriorSidewalk shed installationUnder Construction6p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Trinity 3 in 1 HDFC1909/01/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Empire Design308/17/2026
Badaly Engineering108/05/2026
Paradigm Architecture206/18/2026
KDV Designs Architects105/07/2025
A&B World Consulting206/02/2022
K & M Associates101/08/2021
Hugh Chrysler Engineering Co104/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YBL NY403/21/2026
GC1 Expediting203/21/2026
TBC & Associates203/21/2026
Hugh Chrysler Engineering203/21/2026
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rajput RestorationScaffold410/17/2026
Pat Sementa P & H CoPlumbing407/08/2026
New Century Electrical ContractingElectrical103/21/2026
Larene Electrical CoElectrical103/21/2026
Waltham ElectricElectrical103/21/2026
Alson Electrical ContractingElectrical103/21/2026
Squan Construction ServicesGeneral Contractor107/08/2026
Syed-Naqvi AltafElectrical103/21/2026
3 L & J Elect'l MaintenanceElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Empire Design5474308/17/2026
Paradigm Architecture5931206/18/2026
A&B World Consulting5704206/02/2022
Hugh Chrysler Engineering4251104/09/2020
Building Lifecycle
All (97)Filed (13)Permit Issued (7)Signed Off (2)Violation (60)Objection (3)Special Inspection (12)
10/16/2026
Permit issued — Sidewalk Shed
X01372303-I1-SH
10/08/2026
Objection raised — Other
08/18/2026
Permit issued — Protection and Mechanical Methods
X01433116-I1-PMM
08/18/2026
Violation issued (HPD, open)
C
08/18/2026
Violation issued (HPD, open)
A
08/17/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD WITH DEBRIS CHUTE AT 2015 SOUTHERN BLVD, BRONX AS PER PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01433116-I1
08/12/2026
Violation issued (HPD, open)
C
08/05/2026
Filed — Alteration
COMBINE APARTMENTS AND RESOLVE ECB VIOLATION.
X01438838-I1
07/30/2026
Objection resolved — Addressed
07/30/2026
Special inspection requirement — Post-installed Anchors
Md Rashid
07/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/30/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Md Rashid
07/29/2026
Objection raised — Other
07/21/2026
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 2015 SOUTHERN BLVD, BRONX AS PER PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01372303-P1
07/21/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM AT 2015 SOUTHERN BOULEVARD, BRONX FOR FACADE RESTORATION WORK AND MATERIAL HOIST WITH INSPECTIONS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01376067-P1
07/18/2026
Special inspection requirement — Post-installed Anchors
Md Rashid
07/18/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Md Rashid
07/18/2026
Special inspection requirement — Post-installed Anchors
Md Rashid
07/13/2026
Permit issued — Sidewalk Shed
X01372303-I1-SH
06/18/2026
Filed — Alteration
X01073088-P1
04/30/2026
Violation issued (HPD, closed)
A
04/01/2026
Permit issued — Sidewalk Shed
X01372303-I1-SH
03/31/2026
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 2015 SOUTHERN BLVD, BRONX AS PER PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01372303-I1
03/25/2026
Permit issued — Suspended Scaffold
X01376067-I1-SC
03/22/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM AT 2015 SOUTHERN BOULEVARD, BRONX FOR FACADE RESTORATION WORK AND MATERIAL HOIST WITH INSPECTIONS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01376067-I1
02/23/2026
Violation issued (HPD, open)
C
02/23/2026
Violation issued (HPD, open)
B
02/23/2026
Violation issued (HPD, open)
B
02/23/2026
Violation issued (HPD, open)
B
02/23/2026
Violation issued (HPD, closed)
C
02/23/2026
Violation issued (HPD, open)
B
02/23/2026
Violation issued (HPD, open)
C
01/27/2026
Violation issued (HPD, open)
C
01/27/2026
Violation issued (HPD, open)
B
01/27/2026
Violation issued (HPD, closed)
A
01/27/2026
Violation issued (HPD, open)
B
01/27/2026
Violation issued (HPD, open)
B
01/27/2026
Violation issued (HPD, open)
A
01/27/2026
Violation issued (HPD, open)
A
01/27/2026
Violation issued (HPD, open)
C
01/27/2026
Violation issued (HPD, closed)
C
01/27/2026
Violation issued (HPD, open)
B
01/27/2026
Violation issued (HPD, open)
A
01/27/2026
Violation issued (HPD, open)
A
12/15/2025
Filed — Alteration
X01073088-I1
11/07/2025
Violation issued (HPD, open)
B
11/07/2025
Violation issued (HPD, open)
B
07/20/2025
Violation issued (HPD, closed)
C
06/05/2025
Violation issued (HPD, closed)
A
05/08/2025
Violation issued (HPD, closed)
C
05/08/2025
Violation issued (HPD, closed)
C
05/08/2025
Violation issued (HPD, open)
B
05/07/2025
Filed — Alteration
FILING FOR THE DIRECT REPLACEMENT OF OLD/EXISTING KITCHEN EXHAUST HOOD WITH NEW AT EXISTING DELI/GROCERY STORE. EXISTING EXHAUST DUCT AND EXHAUST FAN TO REMAIN UNDISTURBED. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01136536-I1
02/27/2025
Violation issued (HPD, closed)
B
02/27/2025
Violation issued (HPD, closed)
A
02/27/2025
Violation issued (HPD, closed)
A
02/27/2025
Violation issued (HPD, closed)
A
02/27/2025
Violation issued (HPD, closed)
A
02/27/2025
Violation issued (HPD, closed)
B
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedRajput Restoration10/16/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedRajput Restoration08/18/2026
DOB NOWSidewalk ShedPermit IssuedRajput Restoration07/13/2026
DOB NOWSidewalk ShedPermit IssuedRajput Restoration04/01/2026
DOB NOWSuspended ScaffoldPermit IssuedRajput Restoration03/25/2026
DOB NOWAntennaSigned-offSquan Construction Services02/10/2021
DOB NOWPlumbingSigned-offPat Sementa P & H Co08/28/2020
BISFBISSUEDPalladino Heating Service12/12/2019
BISOTISSUEDVision Construction NYC03/28/2018
BISPLISSUEDRVM Plumbing07/20/2017
BISFPISSUEDMaster Fire Systems11/07/2016
BISEQISSUEDSkyworx Contracting09/11/2015
BISPLISSUEDPat Sementa P & H Co02/03/2011
BISOTISSUEDNationwide Contracting Co01/26/2011
2 projects · most recent 05/07/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/07/2025——Ventilation Systems
Ventilation
Captiveaire MODEL # NCA18HFA 2,500 CFM · Kitchen Exhaust ×1
06/02/2022——Ventilation Systems
Ventilation
Accurex XFPS-30-PSHC-I-50 2,400 CFM · Exhaust Fan ×1
1 project · most recent 06/02/2022
Water/Sanitary
FiledStatusContractorScope
06/02/2022——Water/Sanitary
3 projects · most recent 03/23/2026
General Wiring
FiledStatusContractorScope
03/23/2026Permit IssuedGreen Power Electric—
06/25/2025Permit IssuedL J Electrical Service1 meters, 1 new_meters
04/08/2021Permit IssuedFried Electric CoGeneral Wiring
1 project · most recent 07/21/2026
Sidewalk Shed
FiledStatusContractorScope
07/21/2026Permit IssuedRajput RestorationSidewalk Shed
1 project · most recent 07/21/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/21/2026Permit IssuedRajput RestorationSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/30/2026Post-installed AnchorsMd Rashidspecial
07/30/2026Tenant Protection Plan Compliance—special
07/30/2026Fire-Resistant Penetrations and Joints—special
07/30/2026Alternative Materials - OTCR Buildings Bulletin NumberMd Rashidspecial
07/18/2026Post-installed AnchorsMd Rashidspecial
07/18/2026Alternative Materials - OTCR Buildings Bulletin NumberMd Rashidspecial
07/18/2026Post-installed AnchorsMd Rashidspecial
05/09/2022Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
05/09/2022Energy Code Compliance InspectionsAlexander Bomsteinprogress
05/09/2022Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
04/19/2022Final—progress
04/19/2022Mechanical Systems—special
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch11
08/24/2026X00722010-I1Request digital key ↗
08/24/2026X00721934-I1Request digital key ↗
08/19/2026X01136536-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/26/2026X00328451-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/25/2026X00433269-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION12
04/01/2020240261051Open ↗
08/27/2019240261051Open ↗
03/19/2018220645416Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION8
12/12/2019240261051Open ↗
08/27/2019240261051Open ↗
03/29/2018220645416Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/26/2026X00328451-I1Open ↗
08/25/2026X00433269-I1Open ↗
08/24/2026X00722010-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
03/19/2018220645416Open ↗
10/21/2016220555931Open ↗
09/08/2015220477179Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
08/27/2019240261051Open ↗
03/19/2018220645416Open ↗
07/13/2017240190217Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026X01433116-I1Open ↗
08/27/2026X01376067-P1Open ↗
08/27/2026X01376067-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/19/2018220645416Open ↗
10/21/2016220555931Open ↗
09/08/2015220477179Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/27/2019240261051Open ↗
07/13/2017240190217Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/27/2019240261051Open ↗
07/13/2017240190217Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/26/2011220102074Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING3
07/13/2017240190217Open ↗
04/26/2011220102074Open ↗
01/26/2011220102074Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
09/16/2011220102074Open ↗
08/13/2011220102074Open ↗
08/09/2011220102074Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/09/2016220555931Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/27/2019240261051Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/14/2017240190217Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES3
08/27/2019240261051Open ↗
07/13/2017240190217Open ↗
03/20/2018220645416Open ↗
▸BISSTREET TREE CHECKLIST1
01/26/2011220102074Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00433269-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026X00328451-I1Open ↗
08/25/2026X00433269-I1Open ↗
08/24/2026X00722010-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/27/2019240261051Open ↗
03/20/2018220645416Open ↗
07/13/2017240190217Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/26/2011220102074Open ↗
01/26/2011220102074Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/27/2019240261051Open ↗
07/13/2017240190217Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/27/2019240261051Open ↗
07/13/2017240190217Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/19/2018220645416Open ↗
04/16/2015220448816Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/19/2012220102074Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/27/2019240261051Open ↗
07/13/2017240190217Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/09/2012220102074Open ↗
04/26/2011220102074Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/05/2012220102074Open ↗
07/09/2012220102074Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/26/2011220102074Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT7
08/27/2019240261051Open ↗
03/19/2018220645416Open ↗
07/13/2017240190217Open ↗
Showing 3 of 7 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
09/09/2019240261051Open ↗
07/20/2017240190217Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET5
03/19/2018220645416Open ↗
10/21/2016220555931Open ↗
09/08/2015220477179Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/27/2019240261051Open ↗
07/13/2017240190217Open ↗
▸BISADDITIONAL INFORMATION2
10/05/2012220102074Open ↗
05/16/2012220102074Open ↗
▸BISBOROUGH INTAKE FORM2
04/01/2020240261051Open ↗
08/08/2017240190217Open ↗
▸Other Documents6
▸DOB NOWManufacturer's Specifications3
08/17/2026X01376067-I1Open ↗
08/15/2026X01376067-P1Open ↗
08/13/2026X01376067-I1Open ↗
▸DOB NOWCalculations3
08/17/2026X01376067-I1Open ↗
08/15/2026X01376067-P1Open ↗
08/13/2026X01376067-I1Open ↗