← Back
Elevator apt, semi-fireproof without stores
2017 GRAND CONCOURSE
BRONX · BIN 2007695
💬 Discuss this project
0Year Built
9Stories
D1Building Class
R8Zoning
31,996 sfGross Floor Area
34Units
Rent Stabilized0 Open Violations
Elevator apt, semi-fireproof without stores · Owner of record: DREAMYARD GRAND CONCOURSE HOUSING DEVELO PMENT FUND · 3,591 sf lot · 8.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Roof1p · 1 filing · 4 docs
Bulkhead2p · 2 filings · 20 docs
Floor 356p · 1 filing · 20 docs
Floor 257p · 1 filing · 20 docs
Floor 163p · 1 filing · 20 docs
Cellar63p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY707/08/2026
NEIGHBORHOOD RESTORE HDFC3807/08/2026
BUILD0021307/08/2026
MARK CONTRACTING NY1107/08/2026
CELTIC SERVICES NYC407/08/2026
HOME BUILDERS 1 L P4103/22/2026
2017 GRAND CONCOURSE803/22/2026
2017 GRAND CONCOURSE OWNE103/22/2026
THE OWNER OF103/22/2026
BP GRAND CONCOURSE LLC303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO1803/21/2026
WILLIAM VITACCO ASSOCIATES1403/21/2026
SANDEEP KAUR103/21/2026
PATUXENT ENGINEERING1003/21/2026
ARC DESIGN AND CONSULTING LLC203/21/2026
PLATINUM SERVICES NY403/21/2026
ABC PERMIT EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOME BUILDERS 1 L.PGeneral Contractor2907/08/2026
VAYA RESTORATION INCGeneral Contractor907/08/2026
M. EARLY PLBG & HTG CORPFire Protection907/08/2026
MARK CONTRACTING NY INCGeneral Contractor607/08/2026
CELTIC SERVICES NYC INCGeneral Contractor407/08/2026
BLANTON PLUMBING INCPlumbing407/08/2026
JOHN KARALISElectrical403/21/2026
BEST ENERGY POWER 2015 LLGeneral Contractor303/21/2026
DOB TESTERGeneral Contractor303/21/2026
M. EARLY PLBG & HTG CORPPlumbing207/08/2026
JUSTIN STEINElectrical203/21/2026
TRIBORO ELEC'L CONTR'G COElectrical203/22/2026
PLATINUM SERVICES NY LLCGeneral Contractor207/08/2026
TESTFIRM2 & LLCElectrical103/22/2026
BDS ELECTRIC CORP.Electrical103/22/2026
ANTHONY LUCIANOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE ENGINEERING, PLLC267902/11/2025
ATLAS ATC ENGINEERING INC8011501/24/2025
JAMES A CLANCY9176112/16/2024
ATLANTIC ENGINEERINGLABOR1381510/02/2024
GTA ENGINEERING SERVICES2940307/03/2024
Building Lifecycle
All (200)Filed (34)Permit Issued (49)Signed Off (16)Violation (55)Inspection (12)Objection (4)Special Inspection (30)
11/20/2025
Signed off — New Building
Sprinkler/standpipe work for New Building. Filed in conjunction with NB X00670404-I1
X00670404-S4
10/06/2025
Signed off — New Building
Sprinkler/standpipe work for New Building. Filed in conjunction with NB X00670404-I1
X00670404-S7
10/05/2025
Signed off — New Building
Sprinkler/standpipe work for New Building. Filed in conjunction with NB X00670404-I1
X00670404-S6
09/16/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/22/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
07/18/2025
Permit issued — Standpipe
X00670404-S6-EW-SP
07/17/2025
Permit issued — Sprinklers
X00670404-S6-EW-SD
07/17/2025
Permit issued — Standpipe
X00670404-S7-EW-SD
07/15/2025
Signed off — New Building
Sprinkler/standpipe work for New Building. Filed in conjunction with NB X00670404-I1
X00670404-S3
05/22/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
X01155571-I1
05/06/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED, OVERHEAD PROTECTION, ROOF PROTECTION AND HORIZONTAL NETTING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00950177-I1
05/02/2025
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00958852-I1
04/18/2025
Signed off — Alteration
Installation of construction fence in conjunction with NB X00670404-I1.
X00792472-I1
04/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/18/2025
Special inspection requirement — Standpipe Systems
Matthew Wavro
02/18/2025
Special inspection requirement — Sprinkler Systems
Matthew Wavro
02/11/2025
Filed — New Building
Sprinkler/standpipe work for New Building. Filed in conjunction with NB X00670404-I1
X00670404-A7
02/10/2025
Permit issued — General Construction
X00670404-I1-GC
02/10/2025
Special inspection requirement — Standpipe Systems
Matthew Wavro
02/10/2025
Special inspection requirement — Sprinkler Systems
Matthew Wavro
01/29/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Christopher O'Malley
01/29/2025
Special inspection requirement — Air barrier continuity plan testing
Justin Moses
01/29/2025
Special inspection requirement — Fenestration air leakage
Justin Moses
01/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
RONALD GRAPIN
01/29/2025
Special inspection requirement — Fenestration areas
Justin Moses
01/29/2025
Special inspection requirement — Insulation placement and R values
Justin Moses
01/29/2025
Special inspection requirement — Protection of exposed foundation insulation
Justin Moses
01/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Justin Moses
01/29/2025
Special inspection requirement — Vestibules
Justin Moses
01/29/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
RONALD GRAPIN
01/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
01/29/2025
Special inspection requirement — Sprayed fire-resistant materials
RONALD GRAPIN
01/29/2025
Special inspection requirement — Air barrier - visual inspection
Justin Moses
01/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Justin Moses
01/24/2025
Filed — New Building
Sprinkler/standpipe work for New Building. Filed in conjunction with NB X00670404-I1
X00670404-A6
01/16/2025
Signed off — Alteration
INSTALLATION OF EZ SCALE SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
X00935360-I1
01/16/2025
Signed off — Alteration
INSTALLATION OF MULTI-POINT SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
X01105797-I1
01/14/2025
Signed off — Alteration
INSTALLATION OF EZ SCALE SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
X00971349-I1
01/13/2025
Permit issued — Suspended Scaffold
X00971349-I1-SC
01/06/2025
Special inspection requirement — Sprayed fire-resistant materials
RONALD GRAPIN
01/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
01/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Justin Moses
01/06/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Christopher O'Malley
01/06/2025
Special inspection requirement — Air barrier continuity plan testing
Justin Moses
01/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
RONALD GRAPIN
01/06/2025
Special inspection requirement — Fenestration areas
Justin Moses
01/06/2025
Special inspection requirement — Vestibules
Justin Moses
01/06/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
RONALD GRAPIN
01/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Justin Moses
01/06/2025
Special inspection requirement — Protection of exposed foundation insulation
Justin Moses
01/06/2025
Special inspection requirement — Fenestration air leakage
Justin Moses
12/18/2024
Permit issued — Solar
X01155571-I1-SL
12/16/2024
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
X01155571-I1
11/19/2024
Signed off — New Building
Sprinkler/standpipe work for New Building. Filed in conjunction with NB X00670404-I1
X00670404-S2
11/15/2024
Permit issued — Plumbing
X00670404-S4-PL
11/13/2024
Permit issued — Sidewalk Shed
X00950177-I1-SH
10/17/2024
Violation issued (ECB, closed)
Unknown
10/17/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 200 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offM. EARLY PLBG & HTG CORP07/18/2025
DOB NOWSprinklersSigned-offM. EARLY PLBG & HTG CORP07/17/2025
DOB NOWStandpipeSigned-offM. EARLY PLBG & HTG CORP07/17/2025
DOB NOWGeneral ConstructionPermit IssuedHOME BUILDERS 1 L.P02/10/2025
DOB NOWSuspended ScaffoldSigned-offVAYA RESTORATION INC01/13/2025
DOB NOWSolarSigned-offBEST ENERGY POWER 2015 LL12/18/2024
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP11/15/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC11/13/2024
DOB NOWSuspended ScaffoldSigned-offVAYA RESTORATION INC09/04/2024
DOB NOWConstruction FenceSigned-offHOME BUILDERS 1 L.P09/03/2024
DOB NOWMechanical SystemsSigned-offHOME BUILDERS 1 L.P07/30/2024
DOB NOWStandpipeSigned-offM. EARLY PLBG & HTG CORP07/17/2024
DOB NOWSprinklersSigned-offM. EARLY PLBG & HTG CORP07/16/2024
DOB NOWStandpipeSigned-offM. EARLY PLBG & HTG CORP07/16/2024
DOB NOWStructuralSigned-offHOME BUILDERS 1 L.P02/21/2024
DOB NOWFoundationSigned-offHOME BUILDERS 1 L.P02/21/2024
DOB NOWSupport of ExcavationSigned-offHOME BUILDERS 1 L.P02/21/2024
DOB NOWGeneral ConstructionPermit IssuedHOME BUILDERS 1 L.P02/20/2024
DOB NOWStructuralSigned-offHOME BUILDERS 1 L.P01/19/2024
DOB NOWSprinklersSigned-offM. EARLY PLBG & HTG CORP01/09/2024
DOB NOWStandpipeSigned-offM. EARLY PLBG & HTG CORP01/09/2024
DOB NOWStandpipeSigned-offM. EARLY PLBG & HTG CORP01/09/2024
DOB NOWSuspended ScaffoldSigned-offVAYA RESTORATION INC12/05/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC11/17/2023
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP11/17/2023
DOB NOWSupported ScaffoldSigned-offVAYA RESTORATION INC11/14/2023
DOB NOWGeneral ConstructionPermit IssuedHOME BUILDERS 1 L.P09/25/2023
DOB NOWGeneral ConstructionSigned-offVAYA RESTORATION INC09/22/2023
DOB NOWFoundationSigned-offHOME BUILDERS 1 L.P09/01/2023
DOB NOWConstruction FenceSigned-offHOME BUILDERS 1 L.P09/01/2023
DOB NOWGeneral ConstructionPermit IssuedHOME BUILDERS 1 L.P08/25/2023
DOB NOWSupport of ExcavationSigned-offHOME BUILDERS 1 L.P08/25/2023
DOB NOWSidewalk ShedSigned-offCELTIC SERVICES NYC INC07/13/2023
DOB NOWSidewalk ShedSigned-offMARK CONTRACTING NY INC06/05/2023
DOB NOWSupported ScaffoldSigned-offSIA03/04/2023
DOB NOWSupport of ExcavationSigned-offSIA03/04/2023
DOB NOWStandpipeSigned-offBLANTON PLUMBING INC03/04/2023
DOB NOWStandpipeSigned-offBLANTON PLUMBING INC03/04/2023
DOB NOWProtection and Mechanical MethodsSigned-offSIA03/04/2023
DOB NOWFull DemolitionSigned-offDOB TESTER03/04/2023
+ 17 more permits on file
1 project · most recent 02/11/2025
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/11/2025Permit IssuedHOME BUILDERS 1 L.PAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ice Air RSXC09 10,200 BTU · Ptac ×57
RSXC13 12,000 BTU · Ptac ×11
Lg ARUM096BTE5 108,000 BTU · Vrf Outdoor ×1
LSU180HSV5 20,600 BTU · Condensing Unit ×1
Ventilation
Conserv N1XHA (4), N1XHB (1) 3,020 CFM · Erv ×5
1 project · most recent 02/11/2025
Sprinkler System
FiledStatusContractorScope
02/11/2025Signed-offM. EARLY PLBG & HTG CORPSprinkler System
1 project · most recent 02/11/2025
Storm Water/Sanitary
FiledStatusContractorScope
02/11/2025Signed-offM. EARLY PLBG & HTG CORPStorm, Water/Sanitary
10 projects · most recent 12/24/2025
General Wiring
FiledStatusContractorScope
12/24/2025Pending Payment VerificationJAM ELECTRICAL CORP—
11/17/2025CompleteTRIBORO ELEC'L CONTR'G CO1 meters, 1 new_meters
10/28/2025CompleteTRIBORO ELEC'L CONTR'G CO—
10/28/2025CompleteTRIBORO ELEC'L CONTR'G CO—
10/28/2025CompleteTRIBORO ELEC'L CONTR'G COGeneral Wiring
09/30/2025CompleteLAURA ELEC'L LIGHTING &General Wiring
04/15/2025CompleteBERGER QUALITY ELEC'L CON—
10/23/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
07/10/2023CompleteBDS ELECTRIC CORP.—
03/04/2023WithdrawnTESTFIRM2 & LLCGeneral Wiring
1 project · most recent 02/11/2025
Steel Concrete Masonry
FiledStatusContractorScope
02/11/2025Signed-offM. EARLY PLBG & HTG CORPSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
09/16/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/22/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
06/24/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/24/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/14/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/12/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
12/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/15/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 148
DateRequirementInspectorRole
02/18/2025Standpipe SystemsMatthew Wavrospecial
02/18/2025Sprinkler SystemsMatthew Wavrospecial
02/10/2025Sprinkler SystemsMatthew Wavrospecial
02/10/2025Standpipe SystemsMatthew Wavrospecial
01/29/2025Air barrier - visual inspectionJustin Mosesenergy_progress
01/29/2025Fenestration areasJustin Mosesenergy_progress
01/29/2025Insulation placement and R valuesJustin Mosesenergy_progress
01/29/2025Fenestration air leakageJustin Mosesenergy_progress
01/29/2025Fenestration and door U-factor and product ratingsJustin Mosesenergy_progress
01/29/2025Air barrier continuity plan testingJustin Mosesenergy_progress
01/29/2025Energy Code Compliance InspectionsJustin Mosesprogress
01/29/2025Exterior Insulation and Finish Systems (EIFS)Christopher O'Malleyspecial
01/29/2025Protection of exposed foundation insulationJustin Mosesenergy_progress
01/29/2025VestibulesJustin Mosesenergy_progress
01/29/2025Wall Panels, Curtain Walls, and VeneersRONALD GRAPINspecial
01/29/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
01/29/2025Sprayed fire-resistant materialsRONALD GRAPINspecial
01/29/2025Fire-Resistance Rated ConstructionRONALD GRAPINprogress
01/06/2025Sprayed fire-resistant materialsRONALD GRAPINspecial
01/06/2025Insulation placement and R valuesJustin Mosesenergy_progress
01/06/2025Air barrier - visual inspectionJustin Mosesenergy_progress
01/06/2025Wall Panels, Curtain Walls, and VeneersRONALD GRAPINspecial
01/06/2025Energy Code Compliance InspectionsJustin Mosesprogress
01/06/2025Fire-Resistance Rated ConstructionRONALD GRAPINprogress
01/06/2025Fenestration areasJustin Mosesenergy_progress
Latest 25 of 148.
▾Documents — 277 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch34
08/25/2026X00485856-I1Request digital key ↗
08/23/2026X00890864-I1Request digital key ↗
08/22/2026X00935360-I1Request digital key ↗
Showing 3 of 34 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION8
11/06/2024240316948Open ↗
09/06/2024240316948Open ↗
09/03/2024240316948Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
06/26/2023220735612Open ↗
06/26/2023220735612Open ↗
09/08/2015220031819Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
03/04/2025240316948Open ↗
09/24/2024240316948Open ↗
03/29/2022240316948Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026X00670404-P3Open ↗
08/13/2026X00670404-I1Open ↗
08/13/2026X00670404-A6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026X00670404-A3Open ↗
08/13/2026X00670404-A6Open ↗
08/13/2026X00670404-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00670404-I1Open ↗
▸Seals & Professional Certifications102
▸DOB NOWSpecial Inspector Seal & Signature37
09/21/2026X00670404-P3Open ↗
09/21/2026X00670404-P3Open ↗
09/02/2026X00670404-A2Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
08/25/2026X00485856-I1Open ↗
08/23/2026X00890864-I1Open ↗
08/22/2026X00935360-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/21/2026X00670404-P3Open ↗
09/21/2026X00670404-P3Open ↗
09/21/2026X00670404-P3Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/26/2023220735612Open ↗
10/13/2009220031819Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/29/2022240316948Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/13/2009220031819Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/13/2009220031819Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026X00670404-A3Open ↗
08/13/2026X00670404-A6Open ↗
08/13/2026X00670404-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
06/26/2023220735612Open ↗
▸BISGAS CUT-OFF1
06/26/2023220735612Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026X00670404-I1—
▸Safety & Tenant Protection15
▸DOB NOWStreet Tree Checklist4
08/13/2026X00670404-A6Open ↗
08/13/2026X00670404-P3Open ↗
08/13/2026X00670404-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
09/24/2024240316948Open ↗
03/29/2022240316948Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/26/2023220735612Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/26/2023220735612Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/07/2022240316948Open ↗
▸BISSTREET TREE SIGNOFF1
06/24/2025240316948Open ↗
▸BISSTREET TREES SITE PLAN1
07/07/2025240316948Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/26/2023220735612Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00670404-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00670404-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00670404-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/13/2009220031819Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/26/2023220735612Open ↗
▸BISRODENT CONTROL1
06/26/2023220735612Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00670404-S4Open ↗
08/13/2026X00670404-S3Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00670404-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026X00670404-S1Open ↗
08/13/2026X00670404-P7Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00670404-S1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00670404-S1Open ↗
▸Approvals, Objections & Sign-offs40
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter30
08/23/2026X00890864-I1Open ↗
08/22/2026X00792472-P1Open ↗
08/22/2026X00792472-I1Open ↗
Showing 3 of 30 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
09/24/2024240316948Open ↗
06/26/2023220735612Open ↗
06/26/2023220735612Open ↗
Showing 3 of 6 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
06/26/2023220735612Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/13/2009220031819Open ↗
▸BISSHED LETTER1
09/08/2015220031819Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01155571-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/26/2023220735612Open ↗
▸Filing & Intake Forms9
▸BISBOROUGH INTAKE FORM3
06/26/2023220735612Open ↗
05/31/2023220735612Open ↗
09/03/2021220735612Open ↗
▸BISADDITIONAL INFORMATION2
11/20/2024240316948Open ↗
09/24/2024240316948Open ↗
▸BISEFILING COVER SHEET2
09/03/2021220735612Open ↗
10/13/2009220031819Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/29/2022240316948Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/29/2022240316948Open ↗
▸Other Documents35
▸BISBPP - SUPPORTING DOCUMENTATION8
03/04/2025240316948Open ↗
11/20/2024240316948Open ↗
09/24/2024240316948Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWManufacturer's Specifications4
08/21/2026X01105797-I1Open ↗
08/13/2026X00971349-P1Open ↗
08/13/2026X00971349-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/21/2026X01105797-I1Open ↗
08/13/2026X01105797-P1Open ↗
08/13/2026X00971349-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026X00670404-A3Open ↗
08/13/2026X00670404-I1Open ↗
08/13/2026X00670404-A6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/20/2026X00670404-A6Open ↗
08/20/2026X00670404-A3Open ↗
08/20/2026X00670404-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026X00670404-A3Open ↗
08/13/2026X00670404-A6Open ↗
08/13/2026X00670404-P3Open ↗
Showing 3 of 4 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION1
06/26/2023220735612Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/20/2022240316948Open ↗
▸BISTax Abatement Miscellaneous1
09/03/2021220735612Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
07/07/2022240316948Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00670404-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00670404-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00670404-S5Open ↗