← Back
Walk-up apt, over six families with stores
2018 2 AVENUE
MANHATTAN · East Harlem (South) · BIN 1052696
💬 Discuss this project
1910Year Built
4Stories
C7Building Class
R8AZoning
6,220 sfGross Floor Area
8Units
Rent Stabilized5 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: MMJ LEGACY LLC · 1,944 sf lot · 3.2 FAR built · Flood zone X
Locations of Work
Architecture
Roof3p · 1 filing · 6 docs
Floor 33p · 2 filings · 11 docs
Floor 2
Floor 12p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MOGA CONTRACTING804/09/2026
MMJ LEGACY LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2020$2.4M—300 EAST 104TH ST. REALTY CORP → MMJ LEGACY LLC$392/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NSC ARCHITECTURE, PC102/20/2024
RISE ARCHITECTURE204/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JACK JAFFA & ASSOCIATES203/21/2026
KC EXPEDITING INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MOGA CONTRACTING, INCGeneral Contractor104/09/2026
C JAMES PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIZ DESIGNS LLC6312204/20/2023
Building Lifecycle
All (89)Filed (3)Permit Issued (2)Signed Off (2)Violation (40)Inspection (6)Objection (22)Special Inspection (14)
06/12/2026
Violation issued (HPD, closed)
C
06/12/2026
Violation issued (HPD, closed)
C
05/28/2026
Signed off — Alteration
M08015123-I1
04/29/2026
Violation issued (HPD, closed)
A
02/17/2026
Signed off — Alteration
GENERAL INTERIOR RENOVATION OF APT AB. APTS 1, 2, 3 TO BE RENOVATED AND RECONFIGURED TO FORM NEW PROPOSED APTS 2A & 2B. DECK FILED UNDER PRESENT APPLICATION ONLY FOR ACCESSORY USE TO SECOND FLOOR APARTMENT. NO CHANGE TO BULK, OCCUPANCY, USE OR EGRESS.
M08015114-I1
09/03/2025
Violation issued (HPD, closed)
B
09/03/2025
Violation issued (HPD, closed)
A
09/03/2025
Violation issued (HPD, closed)
C
09/03/2025
Violation issued (HPD, closed)
A
09/03/2025
Violation issued (HPD, closed)
C
09/03/2025
Violation issued (HPD, closed)
B
06/03/2025
Violation issued (HPD, closed)
B
06/03/2025
Violation issued (HPD, closed)
B
10/20/2024
Violation issued (HPD, closed)
A
08/26/2024
Violation issued (HPD, closed)
B
08/26/2024
Violation issued (HPD, closed)
B
03/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/12/2024
Objection raised — Other
03/12/2024
Objection resolved — Addressed
03/04/2024
Objection raised — Fire_Protection
03/04/2024
Objection resolved — Addressed
03/04/2024
Objection raised — Fire_Protection
03/04/2024
Objection resolved — Addressed
02/20/2024
Filed — No Work
M01006811-I1
02/16/2024
Special inspection requirement — Public Assembly Emergency Lighting
Nicholas SCIRE-CHIANETTA
12/31/2023
Violation issued (HPD, closed)
C
12/31/2023
Violation issued (HPD, closed)
B
12/31/2023
Violation issued (HPD, closed)
B
12/31/2023
Violation issued (HPD, closed)
A
12/31/2023
Violation issued (HPD, closed)
C
12/31/2023
Violation issued (HPD, closed)
C
12/31/2023
Violation issued (HPD, closed)
C
12/31/2023
Violation issued (HPD, closed)
C
12/31/2023
Violation issued (HPD, closed)
A
12/31/2023
Violation issued (HPD, closed)
C
12/31/2023
Violation issued (HPD, closed)
C
12/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/19/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/13/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/15/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/16/2023
Violation issued (HPD, closed)
A
07/16/2023
Violation issued (HPD, open)
C
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/13/2023
Violation issued (HPD, open)
A
05/10/2023
Permit issued — Plumbing
M08015123-I1-PL
05/03/2023
Permit issued — General Construction
M08015114-I1-GC
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/20/2023
Filed — Alteration
M08015123-I1
04/20/2023
Special inspection requirement — Tenant Protection Plan Compliance
Jeff Akerman
04/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeff Akerman
03/24/2023
Objection raised — Scope
03/24/2023
Objection resolved — Addressed
12/02/2022
Objection raised — Scope
12/02/2022
Objection resolved — Addressed
12/02/2022
Objection raised — Scope
12/02/2022
Objection resolved — Addressed
12/02/2022
Objection raised — Scope
12/02/2022
Objection resolved — Addressed
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offC JAMES PLBG & HTG INC05/10/2023
DOB NOWGeneral ConstructionSigned-offMOGA CONTRACTING, INC05/03/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/19/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/15/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
02/16/2024Public Assembly Emergency LightingNicholas SCIRE-CHIANETTAprogress
04/20/2023Tenant Protection Plan ComplianceJeff Akermanspecial
04/20/2023Fire-Resistant Penetrations and JointsJeff Akermanspecial
11/08/2022Tenant Protection Plan ComplianceJeff Akermanspecial
11/03/2022Fire-Resistance Rated ConstructionJeff Akermanprogress
11/03/2022Insulation placement and R valuesJeff Akermanenergy_progress
11/03/2022Fenestration air leakageJeff Akermanenergy_progress
11/03/2022Fenestration and door U-factor and product ratingsJeff Akermanenergy_progress
11/03/2022Lighting controlsJeff Akermanenergy_progress
11/03/2022Air barrier - visual inspectionJeff Akermanenergy_progress
11/03/2022Lighting in dwelling unitsJeff Akermanenergy_progress
11/03/2022Energy Code Compliance InspectionsJeff Akermanprogress
11/03/2022FinalRachel Paskeszprogress
11/03/2022Fire-Resistant Penetrations and JointsJeff Akermanspecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
09/01/2026M08015114-I1Request digital key ↗
08/31/2026M08015123-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026M01006811-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026M01006811-I1Open ↗
08/22/2026M08015114-I1Open ↗
08/22/2026M08015114-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026M08015114-I1Open ↗
08/13/2026M01006811-I1Open ↗
08/13/2026M08015123-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M08015123-I1Open ↗
09/01/2026M08015123-I1Open ↗
08/22/2026M08015114-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026M08015114-I1Open ↗
08/13/2026M08015123-I1Open ↗