← Back
BuildNYC
Two stories - detached, small or mid-size
2018 EAST 5TH STREET
BROOKLYN · BIN 3191925
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R2XZoning
2,900 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed horizontal extension to an existing 2-story single-3p · 1 filing · 20 docs
Floor 2Proposed horizontal extension to an existing 2-story single-29p · 1 filing · 20 docs
Floor 1Proposed horizontal extension to an existing 2-story single-31p · 2 filings · 20 docs
CellarProposed horizontal extension to an existing 2-story single-38p · 2 filings · 20 docs
Site & exteriorProposed horizontal extension to an existing 2-story single-56p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/17/2023$6.3M—— → —$2,179/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Northeast Service Interiors103/21/2026
A2ZCM1203/21/2026
Casa Group203/21/2026
Expedite Dem203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJM Associates ConstructionGeneral Contractor607/08/2026
MJM Associates ConstructionScaffold307/08/2026
F.S. SitePlumbing310/04/2026
Northeast Specialist GroupGeneral Contractor203/21/2026
Northeast Specialist GroupScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MGM Creations Architectur7979412/23/2025
Steel Core Engineering PL1098412/23/2025
PSI Agency254108/30/2024
Building Lifecycle
All (102)Filed (13)Permit Issued (14)Signed Off (5)Violation (3)Inspection (7)Objection (30)Special Inspection (30)
10/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/01/2026
Permit issued — Plumbing
B00861013-S2-PL
01/29/2026
Signed off — Alteration
FILING MECHANICAL APPLICATION INCONJUNCTION WITH DOB NOW JOB # B00861013-P2
B00861013-I1
01/29/2026
Signed off — Alteration
FILING MECHANICAL APPLICATION INCONJUNCTION WITH DOB NOW JOB # B00861013-P2
B00861013-S3
01/22/2026
Signed off — Alteration
FILING MECHANICAL APPLICATION INCONJUNCTION WITH DOB NOW JOB # B00861013-P2
B00861013-S1
01/21/2026
Permit issued — Mechanical Systems
B00861013-S3-MS
01/16/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
GABRIEL GINGISHVILI
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
GABRIEL GINGISHVILI
01/09/2026
Special inspection requirement — Concrete - Cast-In-Place
GABRIEL GINGISHVILI
01/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Alexander Sheyman
01/09/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
GABRIEL GINGISHVILI
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GABRIEL GINGISHVILI
12/31/2025
Objection resolved — Addressed
12/30/2025
Objection raised — Cost
12/23/2025
Filed — Alteration
FILING MECHANICAL APPLICATION INCONJUNCTION WITH DOB NOW JOB # B00861013-P2
B00861013-P8
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GABRIEL GINGISHVILI
12/23/2025
Special inspection requirement — Concrete - Cast-In-Place
GABRIEL GINGISHVILI
12/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
GABRIEL GINGISHVILI
12/23/2025
Special inspection requirement — Energy Code Compliance Inspections
GABRIEL GINGISHVILI
12/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Alexander Sheyman
12/23/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
GABRIEL GINGISHVILI
12/19/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/21/2025
Permit issued — Structural
B01104038-I1-ST
06/03/2025
Permit issued — General Construction
B00861013-I1-GC
05/14/2025
Permit issued — Plumbing
B00861013-S2-PL
04/29/2025
Permit issued — Construction Fence
B00861013-S1-FN
09/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/10/2024
Permit issued — Structural
B01104038-I1-ST
08/30/2024
Filed — Alteration
REINFORCE FLOOR FRAMING FOR THE 1ST FLOOR. NEW STEEL BEAMS AND COLUMNS TO SUPPORT 1ST FLOOR FRAMING
B01104038-I1
08/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/23/2024
Violation issued (ECB, closed)
Construction
08/23/2024
Violation issued (ECB, closed)
Unknown
08/23/2024
Violation issued (ECB, closed)
Construction
07/25/2024
Filed — Alteration
FILING MECHANICAL APPLICATION INCONJUNCTION WITH DOB NOW JOB # B00861013-P2
B00861013-P6
07/25/2024
Special inspection requirement — Energy Code Compliance Inspections
GABRIEL GINGISHVILI
07/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
GABRIEL GINGISHVILI
06/27/2024
Permit issued — General Construction
B00861013-I1-GC
06/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/07/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/20/2024
Permit issued — Construction Fence
B00861013-S1-FN
05/14/2024
Filed — Alteration
FILING MECHANICAL APPLICATION INCONJUNCTION WITH DOB NOW JOB # B00861013-P2
B00861013-P4
04/03/2024
Permit issued — Plumbing
B00861013-S2-PL
03/19/2024
Objection resolved — Addressed
02/21/2024
Objection resolved — Addressed
02/19/2024
Objection resolved — Addressed
02/16/2024
Objection raised — Other
02/16/2024
Objection raised — Mechanical
02/06/2024
Objection raised — Scope
01/31/2024
Filed — Alteration
FILING MECHANICAL APPLICATION INCONJUNCTION WITH DOB NOW JOB # B00861013-P2
B00861013-P3
01/02/2024
Special inspection requirement — Energy Code Compliance Inspections
GABRIEL GINGISHVILI
01/02/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
GABRIEL GINGISHVILI
12/05/2023
Signed off — Alteration
Install plywood construction fence to protect site from building demolition operations as per application #B00922679
B00932215-I1
11/27/2023
Objection resolved — Addressed
11/27/2023
Objection resolved — Addressed
11/27/2023
Objection resolved — Addressed
11/27/2023
Objection resolved — Addressed
11/27/2023
Objection resolved — Addressed
11/21/2023
Filed — Alteration
FILING MECHANICAL APPLICATION INCONJUNCTION WITH DOB NOW JOB # B00861013-P2
B00861013-S3
11/21/2023
Objection raised — Admin
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedF.S. Site09/01/2026
DOB NOWMechanical SystemsSigned-offMJM Associates Construction01/21/2026
DOB NOWStructuralSigned-offMJM Associates Construction08/21/2025
DOB NOWGeneral ConstructionSigned-offMJM Associates Construction06/03/2025
DOB NOWPlumbingPermit IssuedAlan J Brutosky PLBR Cont05/14/2025
DOB NOWConstruction FenceSigned-offMJM Associates Construction04/29/2025
DOB NOWStructuralSigned-offMJM Associates Construction09/10/2024
DOB NOWGeneral ConstructionSigned-offMJM Associates Construction06/27/2024
DOB NOWConstruction FenceSigned-offMJM Associates Construction05/20/2024
DOB NOWPlumbingPermit IssuedAlan J Brutosky PLBR Cont04/03/2024
DOB NOWFull DemolitionSigned-offNortheast Specialist Group09/26/2023
DOB NOWConstruction FenceSigned-offNortheast Specialist Group09/22/2023
DOB NOWGeneral ConstructionSigned-offMJM Associates Construction06/29/2023
DOB NOWConstruction FenceSigned-offMJM Associates Construction06/14/2023
1 project · most recent 12/23/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/23/2025Signed-offMJM Associates ConstructionHeating and Air Conditioning Systems
Heat / Cool
Carrier 37MGHAQ24DA3 24,000 BTU · Vrf Outdoor ×1
38MURAQ24AB3 24,000 BTU · Heat Pump Outdoor ×1
38MURAQ30AB3 30,000 BTU · Heat Pump Outdoor ×1
38MURAQ36AB3 36,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 12/23/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/23/2025Permit IssuedF.S. SiteGas, Storm, Water/Sanitary
2 projects · most recent 12/03/2024
General Wiring
FiledStatusContractorScope
12/03/2024Permit IssuedNapstar ElectricGeneral Wiring
08/23/2024Permit IssuedV-Mar ElectricGeneral Wiring
1 project · most recent 08/30/2024
Steel Concrete Wood
FiledStatusContractorScope
08/30/2024Signed-offMJM Associates ConstructionSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/16/2026Pass-Final General Construction Non-Directive 14PassView ↗
12/19/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/07/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
01/09/2026Fire-Resistance Rated ConstructionGABRIEL GINGISHVILIprogress
01/09/2026Energy Code Compliance InspectionsGABRIEL GINGISHVILIprogress
01/09/2026Concrete - Cast-In-PlaceGABRIEL GINGISHVILIspecial
01/09/2026Structural Stability – Alterations of existing buildingsAlexander Sheymanspecial
01/09/2026Exterior Insulation and Finish Systems (EIFS)GABRIEL GINGISHVILIspecial
01/09/2026Fire-Resistant Penetrations and JointsGABRIEL GINGISHVILIspecial
12/23/2025Fire-Resistant Penetrations and JointsGABRIEL GINGISHVILIspecial
12/23/2025Concrete - Cast-In-PlaceGABRIEL GINGISHVILIspecial
12/23/2025Fire-Resistance Rated ConstructionGABRIEL GINGISHVILIprogress
12/23/2025Energy Code Compliance InspectionsGABRIEL GINGISHVILIprogress
12/23/2025Structural Stability – Alterations of existing buildingsAlexander Sheymanspecial
12/23/2025Exterior Insulation and Finish Systems (EIFS)GABRIEL GINGISHVILIspecial
07/25/2024Energy Code Compliance InspectionsGABRIEL GINGISHVILIprogress
07/25/2024HVAC-R and service water piping design and insulationGABRIEL GINGISHVILIenergy_progress
01/02/2024Energy Code Compliance InspectionsGABRIEL GINGISHVILIprogress
01/02/2024HVAC-R and service water piping design and insulationGABRIEL GINGISHVILIenergy_progress
11/21/2023Permanent certificateGABRIEL GINGISHVILIenergy_progress
09/28/2023Exterior Insulation and Finish Systems (EIFS)GABRIEL GINGISHVILIspecial
09/28/2023Fire-Resistant Penetrations and JointsGABRIEL GINGISHVILIspecial
09/28/2023Concrete - Cast-In-PlaceGABRIEL GINGISHVILIspecial
09/28/2023Energy Code Compliance InspectionsGABRIEL GINGISHVILIprogress
09/28/2023Fire-Resistance Rated ConstructionGABRIEL GINGISHVILIprogress
09/28/2023Structural Stability – Alterations of existing buildingsAlexander Sheymanspecial
08/03/2023Duct leakage testing, insulation and designGABRIEL GINGISHVILIenergy_progress
08/03/2023HVAC-R and service water heating system controlsGABRIEL GINGISHVILIenergy_progress
Latest 25 of 37.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/26/2026B00922679-I1Request digital key ↗
08/26/2026B00932215-I1Request digital key ↗
08/26/2026B00861013-S3Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026B00861013-P8Open ↗
09/01/2026B00861013-P8Open ↗
09/01/2026B00861013-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026B00861013-S2Open ↗
08/26/2026B00861013-I1Open ↗
08/26/2026B00861013-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026B00861013-P8Open ↗
09/01/2026B00861013-P8Open ↗
09/01/2026B00861013-P8Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026B00922679-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026B00922679-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B00922679-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B00922679-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B00922679-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/26/2026B00861013-I1Open ↗
08/26/2026B00861013-S2Open ↗
08/26/2026B00861013-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWRodent Control1
08/13/2026B00922679-I1Open ↗
▸Other Documents4
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B00922679-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B00922679-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B00922679-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B00922679-I1Open ↗