← Back
BuildNYC
Library
Hollis Library
202-05 HILLSIDE AVENUE · BIN 4224387
💬 Discuss this project
1974Year Built
1Stories
P8Building Class
R4Zoning
7,500 sfGross Floor Area
0Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Library · Owner of record: Queens Public Library · 9,702 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofHollis LibraryUnder Construction34p · 2 filings · 16 docs
Floor 1Hollis LibraryUnder Construction39p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Design and Construction1409/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Starling Keene703/30/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Department of Design and Construction603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Stalco ConstructionGeneral Contractor207/08/2026
Maccarone PlumbingPlumbing207/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CSA Group NY Architects A69281103/30/2026
Building Lifecycle
All (14)Filed (7)Permit Issued (4)Violation (2)Inspection (1)
05/20/2026
Permit issued — Foundation
Q00774042-I1-GC-CX
05/18/2026
Permit issued — Plumbing
Q00776968-I1-PL
03/30/2026
Filed — Alteration
Drawing affected: Architectural: A-101.01 ,A-103.01 . Mechanical: M301.01 ,M303.01,M503.01.Structural: FO-101.01,S-201.01 ,S-301.01 .
Q00774042-P5
11/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/16/2025
Filed — Alteration
Gut rehab; New bathrooms and Pantry. Disconnect and removal of existing gas service
Q00776968-P2
10/16/2025
Filed — Alteration
Drawing affected: Architectural: A-101.01 ,A-103.01 . Mechanical: M301.01 ,M303.01,M503.01.Structural: FO-101.01,S-201.01 ,S-301.01 .
Q00774042-P3
09/23/2025
Filed — Alteration
Drawing affected: Architectural: A-101.01 ,A-103.01 . Mechanical: M301.01 ,M303.01,M503.01.Structural: FO-101.01,S-201.01 ,S-301.01 .
Q00774042-P2
06/20/2025
Filed — Alteration
Gut rehab; New bathrooms and Pantry. Disconnect and removal of existing gas service
Q00776968-P1
05/15/2025
Permit issued — Plumbing
Q00776968-I1-PL
05/08/2025
Permit issued — General Construction
Q00774042-I1-GC-CX
07/28/2022
Filed — Alteration
Gut rehab; New bathrooms and Pantry. Disconnect and removal of existing gas service
Q00776968-I1
07/28/2022
Filed — Alteration
Drawing affected: Architectural: A-101.01 ,A-103.01 . Mechanical: M301.01 ,M303.01,M503.01.Structural: FO-101.01,S-201.01 ,S-301.01 .
Q00774042-I1
02/20/2019
Violation issued (ECB, closed)
Construction
02/28/2018
Violation issued (ECB, open)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedStalco Construction05/20/2026
DOB NOWPlumbingPermit IssuedMaccarone Plumbing05/18/2026
DOB NOWPlumbingPermit IssuedMaccarone Plumbing05/15/2025
DOB NOWGeneral ConstructionPermit IssuedStalco Construction05/08/2025
BISEQISSUEDFive Star Contracting Companies07/23/2014
BISMHISSUEDRP Cooling05/17/2013
1 project · most recent 03/30/2026
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/30/2026Permit IssuedStalco ConstructionAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ventilation
1 project · most recent 10/16/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/16/2025Permit IssuedMaccarone PlumbingGas, Water/Sanitary
1 project · most recent 03/30/2026
Steel Concrete
FiledStatusContractorScope
03/30/2026Permit IssuedStalco ConstructionSteel, Concrete
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
11/10/2025HVAC-R and service water piping design and insulationLuis Riveraenergy_progress
11/10/2025Permanent certificateLuis Riveraenergy_progress
11/10/2025HVAC-R and service water heating system controlsLuis Riveraenergy_progress
11/10/2025HVAC-R and service water heating equipmentLuis Riveraenergy_progress
11/10/2025Maintenance informationLuis Riveraenergy_progress
11/10/2025Energy Code Compliance InspectionsLuis Riveraprogress
11/10/2025Fire-Resistant Penetrations and JointsLuis Riveraspecial
09/22/2025Fire-Resistant Penetrations and JointsLuis Riveraspecial
09/22/2025Energy Code Compliance InspectionsLuis Riveraprogress
09/22/2025HVAC-R and service water piping design and insulationLuis Riveraenergy_progress
09/22/2025Permanent certificateLuis Riveraenergy_progress
09/22/2025Maintenance informationLuis Riveraenergy_progress
09/22/2025HVAC-R and service water heating equipmentLuis Riveraenergy_progress
09/22/2025HVAC-R and service water heating system controlsLuis Riveraenergy_progress
08/04/2025Structural Steel - WeldingLuis Riveraspecial
08/04/2025Subsurface Conditions – Fill Placement & In-Place DensityLuis Riveraspecial
08/04/2025Subgrade InspectionsLuis Riveraspecial
08/04/2025Energy Code Compliance InspectionsLuis Riveraprogress
08/04/2025FinalLuis Riveraprogress
08/04/2025Fire-Resistance Rated ConstructionLuis Riveraprogress
08/04/2025Footing and FoundationLuis Riveraprogress
08/04/2025Fenestration air leakageLuis Riveraenergy_progress
08/04/2025Interior lighting powerLuis Riveraenergy_progress
08/04/2025Fenestration and door U-factor and product ratingsLuis Riveraenergy_progress
08/04/2025Air barrier - visual inspectionLuis Riveraenergy_progress
Latest 25 of 41.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hollis LibraryGovernment / CivicFloor 1, Roof
Project Q00774042 Alteration · Permit Entire · 07/28/2022
Project Q00776968 Alteration · Permit Entire · 07/28/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 102 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/18/2026Q00776968-P2Request digital key ↗
08/18/2026Q00776968-P1Request digital key ↗
08/18/2026Q00776968-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
07/23/2014440156233Open ↗
05/10/2013420842128Open ↗
▸BISWORK PERMIT APPLICATION2
07/23/2014440156233Open ↗
05/18/2013420842128Open ↗
▸Seals & Professional Certifications57
▸DOB NOWProgress Inspector Seal & Signature29
09/01/2026Q00776968-P2Open ↗
09/01/2026Q00776968-P2Open ↗
09/01/2026Q00776968-P2Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026Q00776968-P2Open ↗
08/29/2026Q00774042-P2Open ↗
08/29/2026Q00774042-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/18/2026Q00776968-P1Open ↗
08/18/2026Q00776968-I1Open ↗
08/17/2026Q00774042-P5Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/17/2015440156233Open ↗
04/17/2015440156233Open ↗
09/06/2014420842128Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/23/2014440156233Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/23/2014440156233Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/23/2014440156233Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE APPLICATION/PERMIT2
09/29/2014420842128Open ↗
05/10/2013420842128Open ↗
▸BISEQUIPMENT USE PERMITS1
09/29/2014420842128Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026Q00774042-I1Open ↗
08/13/2026Q00776968-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/10/2013420842128Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/06/2014420842128Open ↗
05/10/2013420842128Open ↗
05/10/2013420842128Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/23/2014440156233Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/18/2013420842128Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/06/2014420842128Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/23/2014440156233Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/18/2026Q00776968-I1Open ↗
08/18/2026Q00776968-P1Open ↗
08/17/2026Q00774042-P5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)7
08/18/2026Q00776968-P1Open ↗
08/18/2026Q00776968-I1Open ↗
08/17/2026Q00774042-P5Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/17/2015440156233Open ↗
09/29/2014420842128Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/10/2013420842128Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/06/2014420842128Open ↗
05/10/2013420842128Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
05/10/2013420842128Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/23/2014440156233Open ↗