← Back
Two family converted from one family
202-15 119 AVENUE
QUEENS · St. Albans · BIN 4272157
💬 Discuss this project
1955Year Built
2Stories
B3Building Class
R3AZoning
2,381 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Roof3p · 1 filing · 9 docs
Floor 28p · 2 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar2p · 1 filing · 20 docs
Site & exterior7p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/19/2018$475K—— → —$200/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/25/2025
ARCHITECTURAL CONCEPT510/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
ARCHITECTUAL CONCEPT1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor603/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/25/2025
ARCHITECTURAL CONCEPT3642610/23/2024
TRIANGLE INSPECTION & TES7495210/23/2024
Building Lifecycle
All (53)Filed (6)Permit Issued (4)Signed Off (4)Inspection (6)Objection (20)Special Inspection (13)
12/03/2025
Signed off — Alteration CO
INTERIOR ALTERATION AND 2ND FLOOR ADDITION OF EXISTING ONE FAMILY HOUSE TO CONVERT INTO TWO FAMILY HOUSE AS PER DRAWINGS HEREWITH FILED. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00928657-I1
08/29/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01241912-I1
07/03/2025
Permit issued — Solar
Q01241912-I1-SL
06/25/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01241912-I1
06/16/2025
Special inspection requirement — Final
Walid Abdulla
06/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/16/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
03/07/2025
Signed off — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURES AT SECOND FLOOR AS PER DRAWINGS.
Q00928654-I1
03/03/2025
Signed off — Alteration
Install new plywood construction fence as per drawings.
Q00928653-I1
01/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/16/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/15/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
11/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
11/15/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
11/15/2024
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
11/01/2024
Objection resolved — Addressed
10/30/2024
Objection raised — Scope
10/23/2024
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURES AT SECOND FLOOR AS PER DRAWINGS.
Q00928654-P1
10/23/2024
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
10/23/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
10/23/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
10/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
09/12/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/12/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/12/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/09/2024
Permit issued — Plumbing
Q00928654-I1-PL
08/24/2024
Objection resolved — Addressed
08/14/2024
Objection resolved — Addressed
08/13/2024
Objection raised — Zoning
07/24/2024
Objection resolved — Addressed
07/24/2024
Objection resolved — Addressed
07/11/2024
Objection raised — Other
07/11/2024
Objection raised — Scope
07/11/2024
Objection raised — Inspections
07/01/2024
Permit issued — Construction Fence
Q00928653-I1-FN
07/01/2024
Permit issued — Mechanical Systems
Q00928657-I1-GC-CX
06/27/2024
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURES AT SECOND FLOOR AS PER DRAWINGS.
Q00928654-I1
04/04/2024
Filed — Alteration CO
INTERIOR ALTERATION AND 2ND FLOOR ADDITION OF EXISTING ONE FAMILY HOUSE TO CONVERT INTO TWO FAMILY HOUSE AS PER DRAWINGS HEREWITH FILED. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00928657-P1
04/03/2024
Objection raised — Other
04/03/2024
Objection resolved — Addressed
04/03/2024
Objection resolved — Addressed
03/13/2024
Objection resolved — Addressed
02/20/2024
Objection resolved — Addressed
10/19/2023
Objection raised — Other
10/19/2023
Objection raised — Zoning
10/19/2023
Objection raised — Other
09/30/2023
Objection resolved — Addressed
09/27/2023
Objection raised — Other
09/26/2023
Filed — Alteration CO
INTERIOR ALTERATION AND 2ND FLOOR ADDITION OF EXISTING ONE FAMILY HOUSE TO CONVERT INTO TWO FAMILY HOUSE AS PER DRAWINGS HEREWITH FILED. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00928657-I1
09/26/2023
Filed — Alteration
Install new plywood construction fence as per drawings.
Q00928653-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/03/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR09/09/2024
DOB NOWConstruction FenceSigned-offPRECISION HOME DEV INC07/01/2024
DOB NOWMechanical SystemsPermit IssuedPRECISION HOME DEV INC07/01/2024
1 project · most recent 04/04/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/04/2024Permit IssuedPRECISION HOME DEV INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Fujitsu ASU7RLF1 7,000 BTU · Ahu ×10
Heating
Slant-Fin LX-150CB 150,000 BTU · Boiler ×2
Ventilation
Greenheck SP-B90 100 CFM · Exhaust Fan ×6
3 projects · most recent 06/25/2025
General Wiring
FiledStatusContractorScope
06/25/2025CompleteSUNRUN SOLAR ELECTL CORP—
06/05/2025CompleteC & A ELECTRICAL CORPGeneral Wiring
07/18/2024CompleteC & A ELECTRICAL CORPGeneral Wiring
1 project · most recent 04/04/2024
Wood
FiledStatusContractorScope
04/04/2024Permit IssuedPRECISION HOME DEV INCWood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/16/2024Fail-Final CND-Occupancy InspectionFailView ↗
09/12/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/12/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/12/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
06/16/2025FinalWalid Abdullaprogress
06/16/2025Energy Code Compliance InspectionsWalid Abdullaprogress
06/16/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/16/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/16/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
11/15/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMUZAFFAR JAMALspecial
11/15/2024Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
11/15/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
11/15/2024Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
10/23/2024Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
10/23/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/23/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMUZAFFAR JAMALspecial
10/23/2024Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026Q00928653-I1Request digital key ↗
08/23/2026Q00928657-P1Request digital key ↗
08/23/2026Q00928657-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00928657-I1Open ↗
08/13/2026Q00928657-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00928657-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWSpecial Inspector Seal & Signature8
08/28/2026Q01241912-I1Open ↗
08/28/2026Q01241912-I1Open ↗
08/27/2026Q00928654-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026Q00928653-I1Open ↗
08/23/2026Q00928657-P1Open ↗
08/23/2026Q00928657-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026Q01241912-I1Open ↗
08/28/2026Q01241912-I1Open ↗
08/28/2026Q01241912-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026Q00928657-I1Open ↗
08/23/2026Q00928657-P1Open ↗
08/22/2026Q00928654-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00928657-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01241912-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/13/2026Q00928657-P1Open ↗
08/13/2026Q00928657-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00928657-I1Open ↗
08/13/2026Q00928657-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00928657-P1Open ↗
08/13/2026Q00928657-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/23/2026Q00928657-P1Open ↗
08/23/2026Q00928657-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00928657-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00928657-I1Open ↗