← Back
Two family brick
202-15 45 DRIVE
QUEENS · BIN 4125247
💬 Discuss this project
2024Year Built
2.5Stories
B1Building Class
R3XZoning
2,693 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 4,000 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THC CONSTRUCTION303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/14/2023$1.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC510/29/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THC CONSTRUCTION INCGeneral Contractor2507/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing207/08/2026
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506410/29/2025
Building Lifecycle
All (53)Filed (5)Permit Issued (1)Signed Off (4)Violation (3)Objection (10)Special Inspection (30)
05/07/2026
Signed off — New Building
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00897863-I1
02/16/2026
Signed off — New Building
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00897863-S1
12/26/2025
Signed off — New Building
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00897863-S2
11/26/2025
Special inspection requirement — Mechanical Systems
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
11/26/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Structural Steel - Welding
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Structural Steel - Details
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Concrete - Cast-In-Place
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Masonry
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Chimneys and vents
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Heating Systems
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Footing and Foundation
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Final
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Electric vehicle service equipment requirements
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Fenestration areas
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Ventilation and air distribution system
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Duct leakage testing, insulation and design
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Metering
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Air barrier — testing
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Insulation placement and R values
XIAOHONG ZHAO
11/26/2025
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
10/29/2025
Filed — New Building
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00897863-P1
10/07/2024
Violation issued (ECB, closed)
Construction
04/08/2024
Violation issued (ECB, closed)
Construction
04/08/2024
Violation issued (ECB, closed)
Unknown
02/28/2024
Signed off — Full Demolition
FULLY DEMOLITION OF EXISTING ONE STORY HOUSE.
Q00894273-I1
12/29/2023
Permit issued — Full Demolition
Q00894273-I1-FD
08/16/2023
Objection resolved — Addressed
07/31/2023
Objection resolved — Addressed
07/31/2023
Objection resolved — Addressed
07/31/2023
Objection resolved — Addressed
07/31/2023
Objection resolved — Addressed
07/13/2023
Objection raised — Admin
07/13/2023
Objection raised — Structural
07/13/2023
Objection raised — Scope
07/13/2023
Objection raised — Structural
07/13/2023
Objection raised — Inspections
06/29/2023
Filed — New Building
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00897863-I1
06/29/2023
Filed — New Building
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00897863-S1
06/29/2023
Filed — New Building
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00897863-S2
06/22/2023
Filed — Full Demolition
FULLY DEMOLITION OF EXISTING ONE STORY HOUSE.
Q00894273-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offTHC CONSTRUCTION INC12/29/2023
1 project · most recent 10/29/2025
Sprinkler System
FiledStatusContractorScope
10/29/2025——Sprinkler System
1 project · most recent 10/29/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/29/2025Signed-offWATSON'S PLBG, HTG, & BDGGas, Storm, Water/Sanitary
1 project · most recent 10/01/2024
General Wiring
FiledStatusContractorScope
10/01/2024CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
1 project · most recent 10/29/2025
Masonry Wood
FiledStatusContractorScope
10/29/2025Signed-offTHC CONSTRUCTION INCMasonry, Wood
1 project · most recent 10/29/2025
Fence
FiledStatusContractorScope
10/29/2025Signed-offTHC CONSTRUCTION INCFence
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
11/26/2025Mechanical SystemsXIAOHONG ZHAOspecial
11/26/2025Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
11/26/2025Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
11/26/2025Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
11/26/2025Structural Steel - WeldingXIAOHONG ZHAOspecial
11/26/2025Structural Steel - DetailsXIAOHONG ZHAOspecial
11/26/2025Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
11/26/2025MasonryXIAOHONG ZHAOspecial
11/26/2025Structural Steel - High Strength BoltingXIAOHONG ZHAOspecial
11/26/2025Chimneys and ventsXIAOHONG ZHAOspecial
11/26/2025Subgrade InspectionsXIAOHONG ZHAOspecial
11/26/2025Heating SystemsXIAOHONG ZHAOspecial
11/26/2025Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
11/26/2025Footing and FoundationXIAOHONG ZHAOprogress
11/26/2025Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
11/26/2025FinalXIAOHONG ZHAOprogress
11/26/2025Electric vehicle service equipment requirementsXIAOHONG ZHAOenergy_progress
11/26/2025Interior lighting powerXIAOHONG ZHAOenergy_progress
11/26/2025Fenestration areasXIAOHONG ZHAOenergy_progress
11/26/2025Ventilation and air distribution systemXIAOHONG ZHAOenergy_progress
11/26/2025HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
11/26/2025Fenestration and door U-factor and product ratingsXIAOHONG ZHAOenergy_progress
11/26/2025Duct leakage testing, insulation and designXIAOHONG ZHAOenergy_progress
11/26/2025HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
11/26/2025Maintenance informationXIAOHONG ZHAOenergy_progress
Latest 25 of 43.
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026Q00894273-I1Request digital key ↗
08/24/2026Q00897863-P1Request digital key ↗
08/24/2026Q00897863-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
10/31/2023440810696Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/31/2023440810696Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/24/2026Q00897863-I1Open ↗
08/13/2026Q00897863-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/24/2026Q00897863-I1Open ↗
08/13/2026Q00897863-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00897863-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026Q00897863-I1Open ↗
09/01/2026Q00897863-I1Open ↗
08/29/2026Q00894273-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026Q00897863-I1Open ↗
09/01/2026Q00897863-I1Open ↗
08/22/2026Q00897863-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026Q00894273-I1Open ↗
08/24/2026Q00897863-I1Open ↗
08/13/2026Q00897863-S2Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/31/2023440810696Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/31/2023440810696Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/24/2026Q00897863-I1Open ↗
08/13/2026Q00897863-P1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q00894273-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q00894273-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q00894273-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q00894273-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist2
08/24/2026Q00897863-I1Open ↗
08/13/2026Q00897863-P1Open ↗
▸BISSTREET TREE CHECKLIST1
10/31/2023440810696Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00897863-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/24/2026Q00897863-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/24/2026Q00897863-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026Q00894273-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q00894273-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/24/2026Q00897863-I1Open ↗
08/13/2026Q00897863-P1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00897863-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00897863-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
10/31/2023440810696Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/31/2023440810696Open ↗
▸Other Documents13
▸DOB NOWProperty Ownership Certification3
08/24/2026Q00894273-I1Open ↗
08/24/2026Q00897863-I1Open ↗
08/13/2026Q00897863-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/24/2026Q00897863-I1Open ↗
08/13/2026Q00897863-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/24/2026Q00897863-I1Open ↗
08/13/2026Q00897863-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/31/2023440810696Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q00894273-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q00894273-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q00894273-I1Open ↗
▸DOB NOWFinal Survey1
08/24/2026Q00897863-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00897863-I1Open ↗